Premier American Uranium Inc · TSXV:PUR
Premier American Uranium — Investor Presentation (January 2026)
31 slides from Premier American Uranium's investor presentation, January 2026
Slide 1: Reshaping America's Uranium Landscape
RESHAPING AMERICA’S URANIUM LANDSCAPE Purpose Built to Revitalize US Domestic Uranium Production TSXV: PUR | OTCQB: PAUIF INVESTOR PRESENTATION www.premierur.com JANUARY 2026
Slide 2: Disclaimer
DISCLAIMER Information Contained In This Presentation Cautionary Note Regarding Forward-looking Information This presentation (the “presentation”) has been prepared by Premier American Uranium Inc. (“Premier American This presentation contains “forward-looking information” within the meaning of appl
Slide 3: Disclaimer (continued)
DISCLAIMER Cautionary Note Regarding Forward-looking Information (continued) Technical Disclosure and Qualified Person Forward-looking information is based on PUR’s current expectations, beliefs, assumptions, estimates and forecasts about the company’s Dean T. Wilton: PG, CPG, MAIG, a consultant of
Slide 4: Built for Growth
BUILT FOR GROWTH Expanding and enhancing one of the strongest exploration and development portfolios in the US ACQUIRE Two transformational acquisitions since 2023 IPO with ongoing focus on accretive US M&A TEN SLEEP Exploration KAYCEE Exploration EXPLORE CYCLONE BOBCAT AND BOTHEEL Among the largest
Slide 5: Company Snapshot
COMPANY SNAPSHOT CAPITAL STRUCTURE TOP FIVE SHAREHOLDERS Share Price (Jan 21, 2026) $0.92 20% Co-founder Basic Shares Outstanding1 94.9M Options, Warrants and RSUs2 29.5M 8% Co-founder FD Shares Outstanding 124.4M 7% Market Capitalization (Basic) $87.3M Cash2 $5.1M 3% Subsequent Financing3 $15.0M 3%
Slide 6: Track Record of Value Creation Through M&A
TRACK RECORD OF VALUE CREATION THROUGH M&A Scaling through consolidation: IPO and two transformational acquisitions since 20233 New MRE and PEA at Cebolleta; exploration targets at Kaycee and Cyclone 136% 155% ~$102M 104,000 20.3Mlbs NF acres Indicated 18.6Mlbs acquisition Indicated $83M AMPS 52,479
Slide 7: Disciplined, Opportunistic Capital Allocation Driving Growth
DISCIPLINED, OPPORTUNISTIC CAPITAL ALLOCATION DRIVING GROWTH Strategically moving projects across the portfolio to maximize value 01 Advancing near-term development at the Cebolleta, New Mexico Near-Term Development Continue Accretive U.S. Exploration 02 Executing the largest U.S. exploration drill
Slide 8: Competitive Landscape of U.S. Uranium Equities
COMPETITIVE LANDSCAPE OF U.S. URANIUM EQUITIES PUR leads among explorers with a clear path to development-stage advancement Producers Developers Explorers $11,991 $12,000 $3,000 $3,000 Market Capitalization (C$M) $8,000 $7,696 $2,000 $2,000 Potential to advance to Developer status with progress at C
Slide 9: One of the Most Active Uranium Explorers in the U.S.
ONE OF THE MOST ACTIVE URANIUM EXPLORERS IN THE U.S. PUR holds one of the largest U.S. uranium project portfolios and ranked #2 for total feet drilled in 2025, completing ~117,000 ft 2025 FEET DRILLED 1 across the Kaycee and Cyclone ISR Projects in Wyoming 117,267 ft 17,388 ft 14 37,400 ft 12 7,092
Slide 10: Uranium: Resurgence in the U.S.
URANIUM: RESURGENCE IN THE U.S. Unprecedented support for nuclear, driven by energy security and transition to clean energy Google signed a deal to buy power from Prohibiting Russian Uranium T SMRs based on the Kairos Power design Imports Act signed into law targeting first power by 2030 2040 bannin
Slide 11: Active Work Programs in Top U.S. Uranium Districts
ACTIVE WORK PROGRAMS IN TOP U.S. URANIUM DISTRICTS NEW MEXICO - GRANTS MINERAL BELT WYOMING - POWDER RIVER AND GREAT DIVIDE BASINS +347M lbs U3O8 produced (37% of all U.S. historical production)1 +230M lbs of U3O8 produced in Wyoming since first discovery2 4th largest uranium district in the world O
Slide 12: Cebolleta Project, New Mexico
CEBOLLETA PROJECT, NEW MEXICO Shallow deposits with current mineral resources • 100% lease-hold interest in 6,717 acres of mineral rights and 5,700 acres of surface rights, year-round access through paved roads to U.S. Interstate • Located on the eastern edge of the Grants Mineral Belt • Site of sev
Slide 13: Cebolleta Project, New Mexico
CEBOLLETA PROJECT, NEW MEXICO PEA highlights potential for a large-scale, long- Upside beyond the base case life, low-capex uranium project1 Strong leverage to uranium prices, with higher prices expected to • Base case PEA shows avg production of 1.4 Mlb U₃O₈ annually (peak potentially further enhan
Slide 14: Cebolleta Project, New Mexico
CEBOLLETA PROJECT, NEW MEXICO High potential for resource expansion through exploration • Strong potential to increase resources1: Idealized Cross-Section of Grants Mineral Belt • Mineralization open on trend - Mineralized horizons of the Jackpile sandstone remain open-ended and trend beyond the lim
Slide 15: Kaycee Project, Wyoming
KAYCEE PROJECT, WYOMING Strategic land position in the prolific Powder River Basin • 33,752 acres covering the western limb of the Powder River Basin • 1st time in modern history that the entire project is controlled by a single company • 35-mile trend with 430 miles of identified roll fronts; only
Slide 16: Kaycee Project, Wyoming
KAYCEE PROJECT, WYOMING Exploration target outlines clear path to potential resource delineation • An updated NI 43-101 Technical report identified an exploration target of 11.5 to 30 million pounds U3O8 at average grades of 0.06% to 0.10%.1 • A more extensive, in- depth review of historical data id
Slide 17: Cyclone Project, Wyoming
CYCLONE PROJECT, WYOMING Significant land position in the Great Divide Basin • In the vicinity of Ur-Energy Inc.’s Lost Creek ISR uranium mine and other former uranium mining facilities • 26,180 acres comprising: 1,161 claims totaling 21,900 acres and 9 state leases covering 4,280 acres • ~80 holes
Slide 18: Cyclone Project, Wyoming
CYCLONE PROJECT, WYOMING Drilling delivers strong results, expanding scale and continuity Cyclone Rim • 2025 program extended existing ½ mile mineralized trend and identified a new 1.5- mile mineralized corridor that remains open • 25 holes (17,160 ft) completed with 13 holes returning significant m
Slide 19: Leadership
LEADERSHIP Board of Directors TIM ROTOLO MARTY TUNNEY JON INDALL MICHAEL HARRISON GREG HUFFMAN BRAM SPILFOGEL CHAIRMAN COO IsoEnergy, Lawyer, specialized in Managing Partner Former CEO Nuclear Former RBC Global Co-founder of Sachem Mining Engineer shaping federal energy Sprott Fuels, background in A
Slide 20: Technical Advisors
TECHNICAL ADVISORS Unparalleled experience in uranium exploration, development, permitting and operations +40 years in uranium +50 years, including +20 years in uranium and Specialized in permitting in manufacturing +25 in uranium Involved in discovering U.S. and Kazakhstan, gained Specialized permi
Slide 21: Accomplishments and Key Objectives
ACCOMPLISHMENTS AND KEY OBJECTIVES ✓ Spin-out from Consolidated Uranium, now IsoEnergy 2023 2023 2025 2024 ✓ Completed private placement of $6.9M ✓ Spin-out from Consolidated Uranium, now IsoEnergy ✓ Completed ✓ ✓ Commenced trading on the TSXV Completed private placement of $6.9M ✓ Announced acquisi
Slide 22: Appendix
APPENDIX TSXV: PUR – OTCQB: PAUIF | www.premierur.com 22
Slide 23: Consolidation: A Proven Strategy
CONSOLIDATION: A PROVEN STRATEGY PUR was built by a team that has done it before +2,300% RETURN $8.00 $70 MEGA URANIUM (Jan 2005 to Dec 2006) $60 Uranium price from $20.50 to $66.50 $6.00 Mega Acquisition $50 Completed 9 Acquisitions $40 $4.00 $30 Raised +$50m $2.00 $20 Market cap increased from $15
Slide 24: Monogram Mesa, Colorado
MONOGRAM MESA, COLORADO Adjacent to multiple historic mines that produced nearly 5Mlbs • 7,431 acres with 361 mining claims • Multiple historic mines on the NE side and West • Mines generally stable and dry, with numerous mineralized zones exposed • Significant infrastructure surrounding the project
Slide 25: Atkinson Mesa, Colorado
ATKINSON MESA, COLORADO Most substantial uranium-vanadium production within the entire Uravan belt • 5,863 acres comprising: 172 mining claims and 4 DOE leases. • Land package includes patented (fee simple) mining claims on the Dolores Bench • Several small-scale mines on the project • Large-scale u
Slide 26: Outlaw Mesa and Slick Rock, Colorado
OUTLAW MESA AND SLICK ROCK, COLORADO Multiple historic mines with exploration potential • Outlaw Mesa - Total project covers 5,759 acres with 2 DOE leases. • Slick Rock - Total project covers 1,226 acres with 2 DOE leases. • Historic production from multiple mines, including the well known: • Slick
Slide 27: TenSleep Project, Wyoming
TENSLEEP PROJECT, WYOMING Prospective exploration project 10 miles west of Kaycee • Unconformity-style uranium mineralization in Wyoming's Powder River Basin (similar setting to Saskatchewan's Athabasca Basin); • Approx. 3,000-acre property located 10 miles west of Kaycee, with a historic undergroun
Slide 28: Bootheel & Bobcat Project, Wyoming
BOOTHEEL & BOBCAT PROJECT, WYOMING Prospective exploration in the prolific Shirley Basin Bootheel Project • Roll-front mineralization occurs in three ages of sandstone; • Mineralization is amenable to ISR extraction with unusually positive fluid dynamics; • Historic NI 43-101 Resources Bobcat Projec
Slide 29: Moonshine Project, Arizona
MOONSHINE PROJECT, ARIZONA Prospective exploration prospects • An uncategorized historic resource with potentially amenable to ISR extraction process • 3-mile trend of uranium mineralization identified with limited drilling • High grade results for ISR when compared to peers, typical results range f
Slide 30: Additional Information
ADDITIONAL INFORMATION Sources for Slide 6 1. https://www.congress.gov/bill/118th-congress/house-bill/1042 2. https://www.spglobal.com/commodityinsights/en/market-insights/latest-news/electric-power/120223-cop28-22-nations-pledge-to-triple-nuclear-generation-capacity-by-2050 3. https://www.energy.go
Slide 31: Contact Us
Contact Us Premier American Uranium 1-833-223-4673 info@premierur.com @PremierAUranium linkedin.com/company/premier-american-uranium www.premierur.com
Premier American Uranium — Investor Presentation (January 2026) on 6ix