Auric Mining Ltd. · ASX:AWJ

Auric Mining — Investor Presentation (March 2024)

18 slides from Auric Mining's investor presentation, Mar 1, 2024

  1. Slide 1: Auric Emerging as a Resource Rising Star

    Auric Emerging For personal use only as a Resource Rising Star On target to have gold production from two mines in 2024-2025. 1 March 2024

  2. Slide 2: Forward Looking Statements and Compliance Statement

    Forward Looking Statements and Compliance Statement This presentation does not include all available Information on Auric Mining Limited and should not be Compliance Statement For personal use only used in isolation as a guide to investing in the Company. Any potential investor should also refer to

  3. Slide 3: A world-class address

    A world-class address. Auric Mining For personal use only Projects • Auric’s tenements are between Kalgoorlie Brisbane and Norseman in the heart of The Goldfields of Western Australia. Kalgoorlie Perth • The best infrastructure and support Sydney services in Australia for gold mining. Melbourne • Co

  4. Slide 4: Producing from two gold mines in 2024-25

    Producing from two gold mines in 2024-25. For personal use only • Norseman Mining underway for 2024 with expectation to toll mill 300,000+ tonnes of gold ore. • Last year 175,000 tonnes mined at Jeffreys Find Gold Mine for almost $10m in surplus cash for JV. • Widgiemooltha Plan to mine gold resourc

  5. Slide 5: Jeffreys Find Gold Mine: Rapid timeline to cash creation

    Jeffreys Find Gold Mine Rapid timeline to cash creation For personal use only ACQUISTION ASX METALLURGY MINE STUDY CONTRACTOR APPROVALS Sep 2020 Feb 2021 May 2022 Jul 2022 Feb 2023 Apr 2023 Acquisition of Auric Mining listed Company Scoping study BML Ventures of All necessary Jeffreys Find on the Au

  6. Slide 6: Jeffreys Find already a $10m earner with much more to come in 2024

    Jeffreys Find already For personal use only a $10m earner with much more to come in 2024 Auric management were hosted at the Perth Mint refinery where gold bars from Jeffreys Find mine were poured

  7. Slide 7: Jeffreys Find Gold Mine

    Jeffreys Find Gold Mine For personal use only Stage One - Finished A tremendous investment • The Jeffreys Find tenements are 42kms east of • Total cash cost to Auric to date only $1.425 million. Norseman in the Goldfields of WA. • BML Ventures of Kalgoorlie as the JV Contractor bears • Stage One of

  8. Slide 8: All roads lead to Munda

    All roads lead to For personal use only Munda. Flagship asset holds approximately 200,000 ounces of mineral resources.

  9. Slide 9: Munda Gold Project

    Munda Gold Project For personal use only 1. Flagship asset adjacent to the township of Widgiemooltha estimated to contain approximately 200,000 ounces of gold resources. 2. Munda’s average grade exceeds 2g/t at a 0.5g/t cut-off. Once mined, ore would be hauled to a nearby mill for toll treating. 3.

  10. Slide 10: Highest Grade Intersections at Munda Gold Project

    Highest Grade Intersections at Munda Gold Project For personal use only Length Grade x Hole ID From (m) To (m) Au (g/t) (m) Length EMD002 102 148 46.00 8.40 386.2 MIRC004 51 52 1.00 321.00 321.0 MND1406 53 70 17.00 17.65 300.1 MGCR0401 8 24 16.00 12.54 200.6 MGCR0057 18 27 9.00 21.37 192.3 AMRC012 6

  11. Slide 11: Munda is part of the Widgiemooltha Gold Project

    Munda is part of the Widgiemooltha Gold Project. • Auric has substantial coverage at the north end of the For personal use only Widgiemooltha Dome, proximal to a number of gold, nickel and lithium deposits. • Even with the extensive mining history in the area, considerable exploration prospectivity

  12. Slide 12: Spargoville Project

    Spargoville Project For personal use only • Auric’s tenements are just north and along strike to the Wattle Dam Gold Mine. • Wattle Dam was a prolific mine, producing 268,000 ounces of gold at 10.6 g/t during the period 2006- 2013. • Tenements E15/1688 and E15/1689 are also positioned along strike a

  13. Slide 13: Next Steps

    Next Steps..... For personal use only • Stay gold-focused • Look to acquire gold assets only in the heart of The Goldfields of WA. • Rigorous exploration including drill programs at our promising tenements. • Continue to acquire projects. • Remain open to M&A discussions.

  14. Slide 14: A management team with credibility and vision

    A management team For personal use only with credibility and vision. From left to right: Mark English, Managing Director Steven Morris, Non-Executive Chairman John Utley, Technical Director At the Perth Mint in October 2023 holding gold bars from the Jeffreys Find Gold Mine. 14

  15. Slide 15: Auric's directors

    Auric’s directors With a track record of successful discovery, development and production from gold For personal use only deposits, Auric’s management team is ahead of the pack. They are now steering the Company towards becoming a highly profitable gold producer with a cash pipeline for years to com

  16. Slide 16: Key Corporate Statistics

    Key Corporate Statistics For personal use only 130.8 million 822 Shares on Issue Number of shareholders Shareholders 48.5% 51.5% on grouped 16.82 million 48.5% basis Options ($0.15 exercise price) Top 20 shareholders (expire 31 March 2024) $15.0 million $4.7 million Top 20 - including Directors Othe

  17. Slide 17: Auric ticks all the right boxes

    Auric ticks all the right boxes For personal use only Right Place Right Mineral Right People Right Structure • World-class address in the • Gold focused. • Board and leadership team • Remarkable progression from heart of WA’s Goldfields. • Nearly 10,000 ounces of gold with track record of delivering

  18. Slide 18: Thank You

    The quest to find and mine a million ounces of gold just got a whole For personal use only lot more exciting at Auric Mining. Thank You Follow our communications 18

Auric Mining — Investor Presentation (March 2024) on 6ix