Finlay Minerals Ltd. · TSXV:FYL

Finlay Minerals — Technical Presentation (March 2026)

19 slides from Finlay Minerals's technical presentation, March 2026

  1. Slide 1: JJB Property Technical Presentation

    TSX-V: FYL | OTCQB: FYMNF JJB PROPERTY TECHNICAL PRESENTATION MARCH 2026

  2. Slide 2: Cautionary & Forward-Looking Information

    CAUTIONARY & FORWARD-LOOKING INFORMATION This presentation includes certain “forward-looking information” and “forward-looking statements” (collectively, “forward-looking statements”) within the meaning of applicable Canadian securities legislation. All statements in this presentation that address e

  3. Slide 3: Responsible Exploration Practices

    JJB PROPERTY FINLAY MINERALS IS DEDICATED TO RESPONSIBLE EXPLORATION PRACTICES Our goal is to proactively and transparently communicate with local First Nation communities. We aim to build and maintain positive relationships with the First Nations on whose territories we operate, while also advancin

  4. Slide 4: JJB Location

    JJB LOCATION 100% owned and encompasses 15,380 hectares. Grassroots-stage copper-gold-silver exploration project, staked by Finlay in 2025. 150 km north of Smithers. Accessible by helicopter. Minaret airstrip within 10 km of the property. Nearby logging road networks and historic railbeds connect wi

  5. Slide 5: Driftwood Corridor

    DRIFTWOOD CORRIDOR Located in an underexplored corridor of the prolific Stikine Terrane, between the Toodoggone District & the Skeena Arch. The Property straddles the western margin of this 135 km-long “Driftwood Corridor” of Stikine Terrane, a tectonic position analogous to American Eagle Gold’s NA

  6. Slide 6: Regional Geophysics

    REGIONAL GEOPHYSICS The JJB Property is located along a 55-km-long NNW-trending strong magnetic high that hosts several showings & prospects. Projects in the broader region have demonstrated size potential. KEMESS SOUTH Cu-Au +/- Ag-Mo PORPHYRY Past Production: 750 M lbs Cu & SUSTUT COPPER 3.0 Moz A

  7. Slide 7: Geology

    GEOLOGY Regional-scale geological mapping was completed in 2007, with local detailed STRATIGRAPHY: Lower Jurassic mapping completed in 1985. Bowser Lake and Hazelton Group rocks underly the property, with Hazelton volcanic rocks mapped on the east side of the Squingula River and sedimentary rocks on

  8. Slide 8: JJB Targets

    JJB TARGETS N QUIN & SQUINGULA CU-AU-MO Early-stage targets comprised of coincident magnetic highs linked to multi-element geochemical anomalies from limited historic sampling programs. PAT HIGH-GRADE CU-AG An early-stage target covering favourable mag high anomalies, structures and rock samples wit

  9. Slide 9: Copper

    N COPPER QUIN 0.66% Cu 1.20% Cu 2.57 g/t Au 3.05% Cu 0.54% Cu SQUINGULA 0.55% Cu 13.0 g/t Au 2,520 g/t Ag 9

  10. Slide 10: Gold

    N GOLD QUIN 6.58 g/t Au 265 g/t Ag 6.65 g/t Au 529 g/t Ag 2.57 g/t Au 10.3 g/t Au 0.66% Cu 309 g/t Ag 12.2 g/t Au 16.7 g/t Au 43.5 g/t Ag 6,283 g/t Ag SQUINGULA 13.0 g/t Au 2,520 g/t Ag 0.55% Cu 10

  11. Slide 11: Silver

    N SILVER QUIN 288 g/t Ag 5.6 g/t Au 6.65 g/t Au 529 g/t Ag 10.3 g/t Au 1,770 g/t Ag 309 g/t Ag 11.79 g/t Au 0.54% Cu 739 g/t Ag 2.67 g/t Au 6,283 g/t Ag 16.7 g/t Au SQUINGULA 2,520 g/t Ag 13.0 g/t Au 0.55% Cu 11

  12. Slide 12: PAT Target

    PAT TARGET N COPPER 2.83% Cu 89.3 g/t Ag 1.63% Cu 51.4 g/t Ag 4.85% Cu 33.5 g/t Ag The PAT Target is described as a 4.77% Cu 253 g/t Ag Cu-Ag Volcanic Redbed occurrence. 4.30% Cu Chalcocite and bornite occur in 26.2 g/t Ag veinlets and disseminated within a Lower Jurassic Hazelton Group tuff, up to

  13. Slide 13: 2025 Prospecting at Pat Target

    K632203 - Grab 2025 PROSPECTING AT PAT TARGET 2.83% Cu and 89.3 g/t Ag J607472 – Grab K632204 - Grab 2.75% Cu and 72.1 g/t Ag 4.77% Cu and 253 g/t Ag 13

  14. Slide 14: PhotoSat Alteration Mapping

    Satellite alteration mapping in 2025 identified a PhotoSat Alteration Mapping kilometer-scale area of “probable” iron oxide and silica with lesser sericite at the Squingula Target. N PAT QUIN SQUINGULA 14

  15. Slide 15: JJB Highlights

    JJB HIGHLIGHTS The JJB exploration program is fully-funded for 2026. The 2026 program aims to complete: - 11-line km of Induced Polarization Surveys over the Squingula and Quin targets - Mapping and rock sampling over the Squingula and Quin targets. - Reconnaissance work to evaluate potential new ta

  16. Slide 16: The Finlay Team

    THE FINLAY TEAM ROBERT F. BROWN Executive Chairman of the Board and Director Retired Professional Engineer with over 40 years experience in the ILONA BARAKSO LINDSAY, B.Sc. mining industry. Former Vice President, Exploration for Great President, CEO and Director Panther Mining Ltd. and former geolog

  17. Slide 17: Ilona B. Lindsay, Robert F. Brown

    TSX-V: FYL | OTCQB: FYMNF AT OUR CORE: EXCEPTIONAL ASSETS + TECHNICAL EXCELLENCE = ROAD TO DISCOVERY ILONA B. LINDSAY ROBERT F. BROWN President, CEO and Director Executive Chairman of the Board and Director 778.384.5706 | iblindsay@finlayminerals.com 604.816.7043 | rbrown@finlayminerals.com 17

  18. Slide 18: Appendix Slides

    APPENDIX SLIDES 18

  19. Slide 19: Sources

    SOURCES Kemess South Past Production: https://www.centerragold.com/operations/kemess-project/kemess-east/ American Eagle Gold NAK23-017 Drill Results: https://americaneaglegold.ca/news/american-eagle-intersects-302-metres-of-1.09-copper-equivalent-within-606-metres-of- 0.74-copper-equivalent/ Sustut

Finlay Minerals — Technical Presentation (March 2026) on 6ix