  2. Slide 2: Key Highlights – 1H24

    Key Highlights – 1H24 SUSTAINED RECOVERY IN EBITDA MARGIN TL million 1H24 1H23 y/y 1H24 vs 1H23 Net Sales 12,333 24,958 -51% EBITDA 3,144 5,375 -42% Net Income 1,509 3,464 -56% Net Financial Debt 21,020 15,772(*) 33% 1H24 1H23 y/y KPIs-1H24 vs 1H23 Gross Margin 20% 21% -1pp EBITDA Margin 25% 22% +3p

  3. Slide 3: Regional Breakdown

    Regional Breakdown FOREIGN OPERATIONS’ CONTRIBUTION TO EBITDA REACHING 82% TL million Domestic Foreign Share of Foreign Cumulative- 1H24 33% Net Sales 8,298 4,035 67% 18% EBITDA 564 2,581 82% Profit Before Tax (1,351) 4,173 TL million Domestic Foreign Share of Foreign Cumulative- 1H23 20% Net Sales

  4. Slide 4: Shares of Region in EBITDA

    Shares of Region in EBITDA FOREIGN OPERATIONS’ CONTRIBUTION INCREASING AS EXPECTED Shares of Regions in EBITDA 90% 82% 80% 70% 60% 54% 50% 46% 40% 30% 20% 18% 10% 0% 1H23 1H24 Domestic Foreign 1H23 1H24 • Foreign operations contribution increased to 82% of our EBITDA as expected • Contribution of do

  5. Slide 5: Price Evolution in Turkish Market

    Price Evolution in Turkish Market Price SPOT PRICE Evolution CEILING in Turkish INCREASED TO 3,000Market TL/MWh FROM 2,700 TL/MWh IN JUL’24 Average Spot Electricity Prices & Maximum Settlement Prices (TL/MWh) Maximum Settlement Price Implementation 3.750 3.548 3.000 2.589 2.837 2.562 2.574 2.633 2.3

  6. Slide 6: Antalya Power Plant – Key Highlights

    Antalya PP - Key Highlights ACTIVE Ali PRESENCE Metin IN ANCILIARY Kazancı SERVICES Antalya Power Plant – Key Highlights Antalya Power Plant Location Technical Overview < ◼ Energy Source: Natural Gas (CCGT) Plant Overview ◼ Installed Capacity: 900 MW ◼ CoD: 2008 ◼ 2 Siemens SGT5 – 4000F gas turbine

  7. Slide 7: Bolu Göynük Power Plant – Key Highlights

    Bolu PP - Key Highlights ROUTINE Bolu MAINTENANCE Göynük HELD IN Power Plant 2Q24Highlights – Key Bolu Göynük Power Plant Location Technical Overview ◼ Energy Source: Lignite Plant Overview ◼ Installed Capacity: 270 MW ◼ CoD: 2015 ◼ 2 units of SES-Tlmace boilers ◼ 2 units of Skoda Steam Turbines MTD

  8. Slide 8: Northern Cyprus – PP Key Highlights

    Northern Cyprus - PP Key Highlights USD BASED CAPACITY CHARGE SUPPORTIVE OF MARGINS Nothern Cyprus Power Plant Location Technical Overview ◼ Energy Source: Liquid Fuel (Combined Cycle) ◼ Installed Capacity: 188 MW Plant Overview ◼ CoD: 2003 ◼ Contract Expiry: 2038 ◼ Cost-plus pricing mechanicsm ◼ 10

  9. Slide 9: Tashkent & Bukhara PP – Key Highlights

    Tashkent & Bukhara PP – Key Highlights USDTashkent BASED CAPACITY CHARGE A, B and WITH ADDITIONAL Bukhara EBITDA Power Plants EXPECTATION – Key HighlightsIN 2025 Uzbekistan Power Plants’ Locations Technical Overview ◼ Energy Source: Natural Gas (CCGT) ◼ Installed Capacity: 740 MW (A: 240 MW; B: 230

  10. Slide 10: Africa Operations – Key Highlights

    Africa Operations – Key Highlights FUELPower Mali IS PASS Plant THROUGH IN ALL – Key OF OUR OVERSEAS OPERATIONS Highlights Africa Power Plants’ Locations Technical Overview ◼ Energy Source: Natural Gas + Liquid Fuel ◼ Installed Capacity: 370 MW Plant Overview ◼ Fuel cost pass-through mechanism ◼ Tak

  11. Slide 11: Future Strategy and Pipeline

    Pipeline FUTURE Mali STRATEGY Power PlantAND PIPELINE – Key Highlights Building Another Aksa Energy within 5 years (85% growth in installed capacity) +255MW +430MW +891MW +179MW +240MW +50MW +171MW +35MW Bolu-Göynük Talimarjon Senegal 470 Türkiye 241 4,813 MW 4,810 MW 35 MW SPP 430 MW CCGT 255 814 M

  12. Slide 12: Consolidated Summary Income Statement

    Annex CONSOLIDATED SUMMARY INCOME STATEMENT 1H24 1H23 y/y MM TL Net sales 12,333 24,957 -51% Cost of sales (9,842) (19,750) -50% Gross Profit 2,491 5,208 -52% General & administrative costs (603) (476) 27% Marketing expenses (43) (10) 342% Other operating income 319 228 40% Other operating expenses

  13. Slide 13: Consolidated Summary Balance Sheet

    Annex CONSOLIDATED SUMMARY BALANCE SHEET 1H24 YE23 ytd MM TL Cash and cash equivalents 1,247 991 26% Trade receivables 9,455 16,876 -44% Inventories 1,888 1,118 69% Total Current Assets 14,770 21,317 -31% PP&E 45,240 43,676 4% Intangibles 1,276 1,380 -8% Total Non-current Assets 53,779 48,290 11% To

  14. Slide 14: 2024 Guidance

    Annex 2024 GUIDANCE 2023 FINANCIAL 2024 GUIDANCE ACTUAL COMPOSITION COMPOSITION INDICATORS (MM TL) (MM TL) 24% 38% 62% 76% Domestic Foreign NET SALES 35,172 Domestic Foreign 27,215 36% 23% 64% 77% Domestic Foreign EBITDA 7,901 7,795 Domestic Foreign 21% 22% 23% 57% 7% 71% Africa Domestic Asia CAPEX

  15. Slide 15: Contact Information

    Contact Information INVESTOR RELATIONS Sena Atay Pınar Saatçioğlu Investor Relations Investor Relations and Manager Sustainability Director investorrelations@aksaenerji.com.tr +90 216 681 1053 Rüzgarlıbahçe Mh . Özalp Çıkmazı No:10 Kavacık / Beykoz Istanbul Aksa Enerji Üretim A.Ş. https://www.aksain

  16. Slide 16: Disclaimer

    DISCLAIMER Aksa Energy has prepared this presentation for the sole purpose of providing information, which contains forward-looking statements that reflect the Company management’s current views with respect to certain future events. Although it is believed that the expectations reflected in these s

Aksa Enerji Üretim A.Ş. — H1 2024 Earnings Presentation on 6ix