Klondex Mines Ltd.

Klondex Mines — PDAC 2016

27 slides from Klondex Mines's conference presentation, March 2016

  1. Slide 1: PDAC 2016

    PDAC 2016 March 6 - 9, 2016 Metro Toronto Convention Centre Toronto, Canada

  2. Slide 2: Cautionary Notes

    CAUTIONARY NOTES Qualified Person Brian Morris, is the non-independent Klondex Mines "qualified person" as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101"). He has reviewed and is responsible for the technical information contained in this presentati

  3. Slide 3: Klondex Value Proposition

    KLONDEX MINES LTD BM iy? Gaining Scale in North America ———— Balance Sheet Strength

  4. Slide 4: Strategic Foundation

    STRATEGIC FOUNDATION 1. http://www.mining.com/the-worlds-highest-grade-gold-mines/ as of July 15, 2015 2. As at September 30, 2015 3

  5. Slide 5: Celebrating No Lost Time Injuries

    PEOPLE RUNNING SAFER, MORE EFFICIENT OPERATIONS NEVADA OPERATIONS REPORTABLE FREQUENCY RATE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN 15 15 15 15 15 15 15 15 15 15 15 15 16 Medical Reportable Incident 1 0 0 0 0 1 3 3 0 0 1 3 0 Lost Time Incident 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Medical Repo

  6. Slide 6: What We Accomplished at Midas

    WHAT WE ACCOMPLISHED AT MIDAS MIDAS POST-ACQUISITION IMPROVEMENTS • Reduced workforce by 50% • 2 yard scoops, from 4 yard scoops • Increased resource, doubled grade to the mill • Transferred 25% of the equipment • Jumbo’s replaced by handheld drills for use at Fire Creek – reduced • Pre-KDX AuEq gra

  7. Slide 7: Gaining Scale in North America

    GAINING SCALE IN NORTH AMERICA Track Record of Operating Narrow Vein Underground Deposits Profitably Duplicating Two Our Success Flagship Story in Assets in Canada Nevada Focusing on Working towards profitable ounces filling the Midas Mill Right sizing from Nevada the operations Mineral resources Si

  8. Slide 8: 2015 Operational Highlights

    2015 OPERATIONAL HIGHLIGHTS • 2015 Production ~20% higher than 2014 • Our two operations provide flexibility to the mine plans • Efficient and profitable operations, ramping up production to fill the Midas mill • 2015 Production impacted by heavy snowfall at the Midas Mill in December – delayed proc

  9. Slide 9: Mining Operations Highlights

    MINING OPERATIONS HIGHLIGHTS INCREASING TONS – STEADY GRADE • Mining rates continue to ramp-up • Consistent grades despite lower silver grades in Q4 • Continue to focus on filling the Midas Mill in Nevada 8

  10. Slide 10: 2016 Operational Guidance

    2016 OPERATIONAL GUIDANCE 16% Y-O-Y PRODUCTION GROWTH 2016 Proposed • Turning up the heat at Fire Creek, putting Midas on “simmer” Low High FIRE CREEK • Capex allocation: 60%, 30%, 10% to GEO Production 97,000 100,000 Fire Creek, Midas, Mill, respectively. Cash Costs per GEO $450 $500 – Aggressively

  11. Slide 11: Fire Creek Update

    FIRE CREEK UPDATE FIRE CREEK STATISTICS Q1 2015 Q2 2015 Q3 2015 Production (GEOs) 18,155 18,892 21,163 Cash costs (per GEO) 1 $491 $488 $452 Tons per day 232 tpd 216 tpd 248 tpd Grade (AuEq) 1.01 opt 1.02 opt 0.98 opt Recovery 94% Au 95% Au 94% Au 91% Ag 93% Ag 94% Ag Permitting • Environmental Asse

  12. Slide 12: Fire Creek Project Exploration

    FIRE CREEK PROJECT EXPLORATION EXTENDING KNOWN VEINS – OPEN IN ALL DIRECTIONS See Press Release Dated December 10, 2015 11

  13. Slide 13: Midas Update

    MIDAS UPDATE MIDAS STATISTICS Q1 2015 Q2 2015 Q3 2015 Production (GEOs) 14,027 14,045 10,811 Cash costs (per GEO) 1 $966 $754 $960 Tons per day 409 tpd 483 tpd 523 tpd Grade (AuEq) 0.40 opt 0.35 opt 0.24 opt Recovery 93% Au 94% Au 94% Au 91% Ag 94% Ag 94% Ag Tailings Storage Facility • Phase IV Tail

  14. Slide 14: Midas Exploration

    MIDAS EXPLORATION SOUTH AND WEST ZONES – EXPLORATION OPPORTUNITIES See Press Release Dated October 8, 2015 13

  15. Slide 15: Midas Exploration to the West

    MIDAS EXPLORATION TO THE WEST COLORADO GRANDE CORE VS RICO CORE COLORADO GRANDE RICO 3.15 opt AuEq 5.4 opt AuEq 14

  16. Slide 16: Rice Lake Overview

    RICE LAKE OVERVIEW • Fully permitted operation located near the town of Bissett, Manitoba • 2,500 tpd gold mill with an estimated replacement cost of $80–$100 million; ~220 pieces of mobile equipment with an estimated value of C$15–C$20 million • Historical estimate of proven and probable mineral re

  17. Slide 17: Rice Lake Acquisition Highlights

    RICE LAKE ACQUISITION HIGHLIGHTS • Cash transaction ($20 million cash, $12 million debt) with no dilution to Klondex shareholders • Purchase price of $32 million represents a deep discount to invested capital and resource value • Near production ready asset in a top ranked mining jurisdiction • Leve

  18. Slide 18: Reserves & Resources

    RESERVES & RESOURCES Nevada Reserves & Resources Rice Lake Historic Reserves & Resources Rice Lake’s Reserve & Resource Base is Similar in Size to Klondex’s Nevada Operations Note: M&I Resources are inclusive of Reserves (see slide A-2 for details). 17

  19. Slide 19: Rice Lake Tails – Potential for Significant Recoverable Gold

    RICE LAKE TAILS – POTENTIAL FOR SIGNIFICANT RECOVERABLE GOLD ~40 Drill Holes Indicate ~1.0 g/t Gold in Tailings 18

  20. Slide 20: Capital Structure

    CAPITAL STRUCTURE CAPITAL STRUCTURE Issued and Outstanding Shares 139 million Options/Warrants 19 million Fully-Diluted 158 million Cash (as of Sept 30, 2015) US$60.3 million Cash (post-Rice Lake Acquisition) ~US$40.3 million Debt (post-Rice Lake Acquisition) US$12 million Ticker TSX: KDX NYSE MKT:

  21. Slide 21: Buy-Side Outreach – Shifting Focus to Institutional

    BUY-SIDE OUTREACH – SHIFTING FOCUS TO INSTITUTIONAL CURRENT SHAREHOLDERS LOCATION % OWNERSHIP SENTRY INVESTMENTS Toronto, ON 14.9% SUN VALLEY Vancouver, BC/ Sun Valley, ID 9.0% K2 & ASSOCIATES Toronto, ON 8.6% US GLOBAL San Antonio, TX 8.5% OPPENHEIMER New York, NY 4.6% VAN ECK New York, NY 3.1% RBC

  22. Slide 22: Delivering on Our Commitments

    DELIVERING ON OUR COMMITMENTS Milestones Achieved to Date  Acquired Midas Mine and Mill – February 2014  Reported +1 Million AuEq Ounces of M&I Resources, next update expected Q3 2016  No Lost Time Incidents: Fire Creek (+3 years) and Midas (+1 year), and counting  Completed Listing on NYSE MKT

  23. Slide 23: For More Information

    For More Information John Seaberg SVP Investor Relations Office 775.284.5757 Cell 303.668.7991 jseaberg@klondexmines.com

  24. Slide 24: Pro Forma Klondex

    PRO FORMA KLONDEX Rice Lake Pro Forma Shares mm 139 – 139 Outstanding/Issued Cash1 US$ mm $67 ($20) $47 Debt1 US$ mm $0 $12 $12 Enterprise Value2 US$ mm $265 $32 $297 Reserves3,4 Koz Au Eq. 445 455 EV/oz Total Reserves US$/oz Au Eq. $590/oz $70/oz M&I Resources3,4 Koz Au Eq. 1,035 634 No Share Dilut

  25. Slide 25: Appendix – Reserves and Resources

    APPENDIX – RESERVES AND RESOURCES Klondex - Mineral Reserves Klondex- Measured Klondex - Measuredand andIndicated IndicatedResources Resources Klondex - Inferred Resources Tons Au Ag Au Ag AuEq Grade Contained Grade Contained (000s) opt opt koz koz koz Tons Au Ag Au Ag AuEq Tons Au Ag Au Ag AuEq Fir

  26. Slide 26: Footnotes

    FOOTNOTES Notes to Klondex Mineral Resources 1. Fire Creek mineral resource has an effective date of June 30, 2015 (see press release September 16, 2015). 2. Midas mineral resource has an effective date of May 31, 2015 (see press release September 16, 2015). 3. Mineral resources are inclusive of min

  27. Slide 27: Footnotes

    FOOTNOTES Notes to Rice Lake Historical Mineral Estimate A historical estimate of the mineral reserves and resources at Rice Lake as at December 31, 2014, as reported by San Gold Corporation (a prior owner of Rice Lake) in its annual information form dated March 31, 2015 (the "San Gold AIF") for the

Klondex Mines — PDAC 2016 on 6ix