  1. Slide 1: Advancing a Large Near-Surface Lead-Silver-Zinc Deposit in Western Australia

    Slide 1: Advancing a Large Near-Surface Lead-Silver-Zinc Deposit in Western Australia

    ADVANCING A LARGE NEAR-SURFACE LEAD-SILVER-ZINC DEPOSIT IN WESTERN AUSTRALIA INVESTOR PRESENTATION NOVEMBER 2019 ASX:PMY

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    DISCLAIMER ASX:PMY Forward-Looking Statements Certain statements in the presentation are or may be “forward-looking statements” and represent the Company’s intentions, projections, expectations or beliefs concerning, among other things, future operating and exploration results or the Company’s futur

  3. Slide 3: Corporate Snapshot as at 18 November 2019

    Slide 3: Corporate Snapshot as at 18 November 2019

    CORPORATE SNAPSHOT AS AT 18 NOVEMBER 2019 ASX:PMY CAPITAL STRUCTURE SIGNIFICANT SHAREHOLDERS SHARES ON ISSUE (BN, UNDILUTED) 2.9 HOLDER HELD OWNERSHIP MARKET CAP (A$M, AT A$0.008) 23.1 1. VILLIERS QUEENSLAND PL* 351,092,229 12.16% CASH (A$M) 4.6 2. ZERO NOMINEES PL 255,888,888 8.86% ENTERPRISE VALUE

  4. Slide 4: Board and Management Team

    Slide 4: Board and Management Team

    BOARD AND MANAGEMENT TEAM ASX:PMY RICHARD MONTI SIMON NOON PETER HAROLD ANDREW PARKER AARON KING CHAIRMAN MANAGING DIRECTOR NON-EXECUTIVE DIRECTOR NON-EXECUTIVE DIRECTOR PROJECT MANAGER Geologist with over 30 Simon is an experienced executive Process Engineer with over Lawyer with extensive Metallur

  5. Slide 5: Sorby Hills Investment Highlights

    Slide 5: Sorby Hills Investment Highlights

    SORBY HILLS INVESTMENT HIGHLIGHTS ASX:PMY Developing a large near-surface and flat Compelling economics including modest CAPEX lying lead-silver-zinc deposit in WA. and fast payback. Project ideally located close to port Recent drilling success and substantial resource and connected by existing road

  6. Slide 6: The Case for Lead

    Slide 6: The Case for Lead

    THE CASE FOR LEAD ASX:PMY SUPPLY AND DEMAND LEAD BATTERIES SUPPORT THE CLEAN ENERGY TRANSITION • Lead batteries provide 75% of worldwide rechargeable energy • Short-term refined lead stocks are close to record lows. storage4.. • Predicted growth in global lead market demand - CAGR of 6.74% between 2

  7. Slide 7: Location and Infrastructure

    Slide 7: Location and Infrastructure

    LOCATION AND INFRASTRUCTURE ASX:PMY • Located ~50km north-east from the regional centre of Kununurra. • Existing sealed road to transport concentrate from site to the facilities at Wyndham Port, 150km away. • Established infrastructure allows for fast tracked production. Image: Port of Wyndham - Cur

  8. Slide 8: Key Government Approvals Secured

    Slide 8: Key Government Approvals Secured

    KEY GOVERNMENT APPROVALS SECURED ASX:PMY “The WA Environmental Protection Authority (EPA) considers that…the Project can be managed in a manner that…avoids significant or unacceptable environmental impacts and risks.” Assessment completed for the development of a lead-silver-zinc open pit mine with

  9. Slide 9: Pre-Feasibility Study Highlights

    Slide 9: Pre-Feasibility Study Highlights

    PRE-FEASIBILITY STUDY HIGHLIGHTS ASX:PMY “Pre-Feasibility Study returned highly robust financials. Optimised PFS expected Q1 2020.” MINING AND PROCESSING Initial Mine Life (Years) 8 8 Year Initial Mine Life Mining Rate (Mtpa) 1 PRODUCTION 1 Mtpa Mining Rate LOM Lead Metal Production (kt) 249 LOM Sil

  10. Slide 10: A$ Lead and Silver Prices Looking Good

    Slide 10: A$ Lead and Silver Prices Looking Good

    A$ LEAD AND SILVER PRICES LOOKING GOOD ASX:PMY $30 $5,000 Silver +21% $25 $4,500 $20 $4,000 Silver Price (A$/oz) Lead Price (A$/t) $15 $3,500 Updated PFS 26 Mar 2019 Lead +14% $10 $3,000 $5 $2,500 A$ Ag A$ Pb $0 $2,000 Jan-18 Apr-18 Jul-18 Oct-18 Jan-19 Apr-19 Jul-19 Oct-19 Source: Terra Studio. PAC

  11. Slide 11: Mineral Resource Estimate

    Slide 11: Mineral Resource Estimate

    MINERAL RESOURCE ESTIMATE ASX:PMY JORC MINERAL RESOURCE ESTIMATE AT A 1.0% LEAD CUT-OFF GRADE1 • Global Resource of 36Mt @ 3.7% Pb, 39g/t Ag and 0.5% Zn from CONTAINED CONTAINED CONTAINED 20 metres below surface and open in all directions. CLASSIFICATION TONNES (Mt) Pb % Ag g/t Zn % Pb (Kt) Zn (Kt)

  12. Slide 12: Mining, Metallurgy, and Processing

    Slide 12: Mining, Metallurgy, and Processing

    MINING, METALLURGY, AND PROCESSING ASX:PMY “Open pit mining, high recoveries and simple processing to produce high quality concentrate.” MINING METALLURGY • Initial production from 3 open • Rougher flotation with sulphidisation pits over initial 8-year mine life. testwork confirms up to 96% Pb and 9

  13. Slide 13: Sorby Hills MVT Geology

    Slide 13: Sorby Hills MVT Geology

    SORBY HILLS MVT GEOLOGY ASX:PMY • Located in a world-class Mississippi Valley Type (‘MVT’) district. • Several MVT deposits have been mined previously in the Kimberly region. • Mineralisation is typical carbonate-replacement style located at the transition between dolomites in the footwall and overl

  14. Slide 14: Exploration Upside

    Slide 14: Exploration Upside

    EXPLORATION UPSIDE ASX:PMY • Historical information has proved valuable in defining expansions of the resource and as a result the confidence in the model and targeting has increased. • The Sorby Hills deposit has excellent potential to grow as extensions and targets outside of the main defined depo

  15. Slide 15: Pacifico's Drilling Highlights

    Slide 15: Pacifico's Drilling Highlights

    PACIFICO’S DRILLING HIGHLIGHTS ASX:PMY “Pacifico’s Phase I and II drilling programs confirmed continuity between deposits C, DE, and F which is now referred to as the Omega deposit with a strike length of 1.7km.” Significant intercepts from Phase I and II drilling programs include: • 20.0m at 7.3% P

  16. Slide 16: Key Milestones and Newsflow

    Slide 16: Key Milestones and Newsflow

    KEY MILESTONES AND NEWSFLOW ASX:PMY “Outstanding progress made since Project acquisition. On track for DFS in 2020.” Phase II Commence Mineral Optimised Phase I Phase III Phase III Project Significant PFS Review 6,000m Resource PFS & Ore 5,500m 3,000m RC Drilling Acquisition MRE Uplift & Update Dril

  17. Slide 17: Contact Us

    Slide 17: Contact Us

    CONTACT US Level 10, 105 St Georges Tce, Perth WA 6000 61 8 6268 0449 info@pacificominerals.com.au ASX:PMY www.pacificominerals.com.au

  18. Slide 18: Appendices

    Slide 18: Appendices

    APPENDICES ———\ Pacifico Minerals Ltd ASX:PMY

  19. Slide 19: Capital Investment and Operating Costs

    Slide 19: Capital Investment and Operating Costs

    CAPITAL INVESTMENT AND OPERATING COSTS ASX:PMY PRE-PRODUCTION CAPITAL EXPENDITURE (A$M) OPERATING COST ESTIMATES ON-SITE CAPITAL EXPENDITURE 52 A$/lb US$/lb MINING 0.31 0.22 EPCM 8 PROCESSING 0.11 0.07 OWNER’S PROJECT COSTS 10 TCRCs AND OUTBOUND LOGISTICS 0.16 0.11 MINING (INC. DE-WATERING, PRE-STRI

  20. Slide 20: October MRE at Selected Cut Off Grades

    Slide 20: October MRE at Selected Cut Off Grades

    OCTOBER MRE AT SELECTED CUT OFF GRADES ASX:PMY Cut-Off Grade Pb% JORC Classification Tonnes (Mt) Pb % Zn % Ag g/t Contained Pb (Kt) Contained Zn (Kt) Contained Ag (Moz) 1.0 Indicated 16.6 3.8 0.4 39 630.8 62.3 20.81 Inferred 19.4 3.6 0.5 38 707.8 106.7 23.78 Total 36.0 3.7 0.5 39 1,338.5 169.1 44.59

  21. Slide 21: Lead Market Opportunity – Demand by Application

    Slide 21: Lead Market Opportunity – Demand by Application

    LEAD MARKET OPPORTUNITY – DEMAND BY APPLICATION ASX:PMY • Largest sector of lead demand is automotive (AV) batteries, accounting for more than 86% of refined lead (of which 64% is used in replacement batteries)1. LEAD CONSUMPTION BY SECTOR • Wood Mackenzie therefore expects automotive demand to boos

  22. Slide 22: Non-Core Assets

    Slide 22: Non-Core Assets

    NON-CORE ASSETS ASX:PMY “Exploring opportunities to sell or establish Joint Ventures for our non-core assets to realise shareholder value.” BORROLOOLA WEST JOINT VENTURE (NORTHERN TERRITORY) • Joint Venture Project in the McArthur Basin with Sandfire Resources NL (PMY 51%, SFR 49%). • Potential for