NorthX Nickel Corp. · CSE:NIX

NorthX Nickel — Archer Exploration — Investor Presentation (March 2023)

23 slides from NorthX Nickel's investor presentation, March 2023

  1. Slide 1: Corporate Presentation

    rcher Exploration Corp. A Leading Canadian Nickel Explorer & Developer Abitibi, Quebec Corporate Presentation March 2023 CSE: RCHR | archerexploration.com CSE: RCHR | archerexploration.com

  2. Slide 2: Disclaimer

    Disclaimer General and assumptions the Company believes are reasonable. The Company has made various assumptions, including, among others, that: the results of proposed exploration activities are as anticipated; the Company’s operations are not disrupted or delayed by unusual This corporate presenta

  3. Slide 3: Investment Highlights and Strategy

    Investment Highlights and Strategy Focused on A nickel exploration Focusedandon development vehicle focused on nickel sulphides with the objective Nickel to generate Tier 1 sources of nickel units to supply expanding global green-energy initiatives Nickel Low Mining friendly, infrastructure-rich, lo

  4. Slide 4: Portfolio and Pipeline

    Portfolio and Pipeline Grasset is the only undeveloped nickel sulphide deposit (>50kt Ni, >1.5% NiEq) in North America not held by a major mining company and the 3rd largest land package in the world- renowned Sudbury Basin The cornerstone asset of the portfolio, located within the Abitibi Greenston

  5. Slide 5: Corporate Snapshot

    Corporate Snapshot Archer is a Canadian Ni-Cu-Co-PGM focused exploration and development company. Flagship Grasset Nickel project in Abitibi and the 3rd largest land position in Sudbury Basin. Share Structure, Cash & Major Shareholders (1) CSE: RCHR – 1 Year Chart $$ Exp. millions Issued & Outstandi

  6. Slide 6: Management & Advisors

    Management & Advisors A seasoned team with a track record of advancing mining assets from discovery to production Tom Jacquelin (Jack) Dr. Neil Craig Keith Meyer Gauthier O’Brien Parry Bodnarchuk President, CEO & Director VP Exploration Advisor Advisor Advisor  Professional engineer with over  Pro

  7. Slide 7: Grasset Nickel Project Overview

    Grasset Nickel Project Overview Two discovery lenses, upside potential  The H3 lens is currently defined over a ~500m strike length and hosts the bulk of higher-grade Ni-Cu-Co- PGM mineralization in the current resource  The H1 lens is currently defined over a ~900m strike length and to date hosts

  8. Slide 8: Grasset History

    Grasset History Sporadic exploration and a serendipitous 2012 vintage discovery 1959-2008 Pre Balmoral Exploration by multiple companies with a focus on VMS and gold targets, mainly in the central and NW parts. 2010-2015 Work Program Vast majority of the work was completed between 2011-2015. Balmora

  9. Slide 9: Grasset Nickel Project

    Grasset Nickel Project A detailed review  Higher-grade Ni-Cu-Co-PGM mineralization is concentrated in two concordant sulphide bearing horizons (H1 & H3) striking NW-SE within steeply dipping ultramafic host units  H1 & H3 are 25 to >50m thick, stacked, tabular higher-grade lenses within a >200m th

  10. Slide 10: Grasset Nickel Project Detailed Review

    Grasset Nickel Project Detailed Review High-grade massive sulphides Characteristics of komatiite-hosted Ni- GR-14-57: 14.65 % Ni, 1.1 % Cu, 4.1 g/t Pt, 7.09 g/t Pd and 1.05 g/t Au over 0.67 m Cu-Co-PGM deposit types: incl. within broader mineralized intercept of 1.43 % Ni over 79.40 m  Mineralizati

  11. Slide 11: Fully Funded 2023 Winter Exploration Program

    Fully Funded 2023 Winter Exploration Program $4 Million+ Grasset 2023 Winter Drilling & Exploration Plans to Expand Resource Base  Initial 1,200m pilot hole with at least four branch holes testing the two horizons below current resource depth (500 and 600m) to an ultimate depth of 1,500m  Drilling

  12. Slide 12: Grasset Nickel Project Regional Exploration

    Grasset Nickel Project Regional Exploration Fertile and highly prospective regional belt that has seen little nickel-focused exploration prior to discovery in 2012 GUC Central  Subsequent exploration has confirmed multiple occurrences of similar type nickel sulphide mineralization within the establ

  13. Slide 13: GUC Central Discovery

    GUC Central Discovery High-grade Ni-Cu-Co-PGM discovery with very limited drill-testing  Bulk tonnage potential given ~950 metres of favourable stratigraphy located approximately 7 kilometres 3.59% Ni over 1.03m within northwest of the Company’s Grasset 1.35% Ni over 3.94m nickel deposit  At GUC C

  14. Slide 14: Strong Metal Inventory

    Strong Metal inventory 1,2 Substantial metal endowment underpinning the value of Grasset >0.80% Tonnes NiEq Ni Cu Co Pt Pd Contained Contained Contained Contained Contained Contained NiEq (t) (%) (%) (%) (%) (g/t) (g/t) NiEq (t) Ni (t) Cu (t) Co (t) Pt (oz) Pd (oz) Indicated Horizon 1 89,200 1.00 0.

  15. Slide 15: Existing Infrastructure in Established Mining Camp

    Existing Infrastructure in Established Mining Camp Excellent infrastructure in place with ongoing development at nearby Fenelon and Martiniere gold projects (Wallbridge Mining Co.)  Year-round road access via a maintained highway  Grasset is less than 20 km to a powerline generated from mostly ren

  16. Slide 16: Grasset Nickel Project Value Proposition

    Grasset Nickel Project Value Proposition New discovery with significant exploration upside, district scale potential and located in Quebec  Significant nickel discovery made in 2012 while exploring for gold – Balmoral was either lucky to find the one, lone nickel deposit or there’s more around  Cu

  17. Slide 17: Sudbury Basin Portfolio

    Sudbury Basin Portfolio 3rd largest land package in a world-class mining district  Large land under-explored land package with blue sky exploration potential in areas hosting similar ore forming environment as other world class deposits within the Basin  Offset dykes, particularly at the Parkin an

  18. Slide 18: Sudbury – Parkin Project

    Sudbury – Parkin Project An advanced exploration project – Ni-Cu-PGM mineralization hosted in an offset dyke  9.4 kilometres of strike length Near surface North of Parkin Offset dyke for Ni-Cu- and South zones PGMs.  Past producer Milnet Mine and near surface historic mineral resource viz. North Z

  19. Slide 19: Sudbury Portfolio – Ni-Cu-PGM Mineralization

    Sudbury Portfolio – Ni-Cu-PGM Mineralization Fully Funded $2 Million 2023 Winter Drilling & Exploration Plans Parkin – Advanced stage property in the 9.4 kilometre Parkin Offset Dyke  The 2023 exploration plan for the Parkin property includes detailed 3D modeling of the geology and geophysics using

  20. Slide 20: Upcoming Catalysts & News Flow

    Upcoming Catalysts & News Flow Corporate Grasset Parkin Other  Community and First Nations Grasset 2023 Winter Program Parkin 2023 Winter Program Trill Engagement and Consultations  Pilot Hole Drilling Underway  Permitting  3D Modelling of Geology and  Comprehensive Asset Review Geophysics  Do

  21. Slide 21: Board of Directors

    Board of Directors A seasoned team with a track record of advancing mining assets from discovery to production David Christian Michael Marz Brian Cobbold Kargl-Simard Konnert Kord Penny Chairman Director Director Director Director  Currently Vice Chairman of Metal  Founder, President and CEO of 

  22. Slide 22: Technical Advisory Committee

    Technical Advisory Committee A seasoned team with a track record of advancing mining assets from discovery to production Dr. Neil Steve Brian Alan Dr. Michael O’Brien Beach Booth King Lesher TAC Chair TAC Member TAC Member TAC Member TAC Member  Economic geologist and former  Professional geologis

  23. Slide 23: For Additional Information

    rcher Exploration Corp. A Leading Canadian Nickel Explorer & Developer Abitibi, Quebec For Additional Information: Tom Meyer, P.Eng, CFA IR & Media Contact President & CEO, Director Oakstrom Advisors tom@archerexploration.com CSE: RCHR | archerexploration.com michael@oakstrom.com CSE: RCHR | archere

Archer Exploration — Investor Presentation (March 2023) on 6ix