Peninsula Energy Limited · ASX:PEN

Peninsula Energy — Peninsula Minerals — Investor Presentation (July 2008)

43 slides from Peninsula Energy's investor presentation, Jul 9, 2008

  1. Slide 1: Peninsula Minerals Limited Presentation (ASX cover letter)

    For personal use only 9 July 2008 C ompanies Announcement Office Via Ele ct roni c Lodgement PENINSULA MINERALS LIMITED PRESENTATION Please find attached a copy of the latest Peninsula Minerals Limited presentation on the Lance Projects in Wyoming, USA and also the Karoo Projects in South Africa. Th

  2. Slide 2: Peninsula Minerals: Advanced Uranium Explorer on Three Continents

    For personal use only Peninsula Minerals Advanced Uranium Explorer on Three Continents Wyoming Lance Project – Wyoming USA U Western Australia U South Africa South Australia U/Mo U

  3. Slide 3: Disclaimer

    Disclaimer For personal use only This presentation is provided on the basis that the Company nor its representatives make any warranty (express or implied) as to the accuracy, reliability, relevance or completeness of the material contained in the Presentation and nothing contained in the Presentati

  4. Slide 4: Mission Statement

    For personal use only Mission Statement y To be a 1.5m lb per year U3O8 producer from an In‐ Situ Recovery operation at the Lance Projects in Wyoming USA with production within 1 year of permitting y Continue to add additional resources through exploration within our project areas

  5. Slide 5: Management

    Management For personal use only Directors and Management y Executive Chairman Gus Simpson Strong leadership, corporate and project management skills y Technical Director Dr. Alan Marlow PhD in economic geology and uranium specialist (ex Gencor) y Chief Operating Officer Andrew Ford Highly experienc

  6. Slide 6: Capital Structure June 2008

    For personal use only Capital Structure June 2008 yExisting shares 961 million yOptions 218 million yMarket Cap A$34 million yCash A$ 5.1 million yDaily turnover 3‐14 million

  7. Slide 7: Comparative Valuation

    Comparative Valuation For personal use only Research y A recent research report1 rated Peninsula as having At US$50/lb At US $90/lb high quality projects and having been over‐sold y The research report1 rated Peninsula with a very low Price x Cash Generation Multiple highlighting the value of the st

  8. Slide 8: Projects Summary

    Projects Summary For personal use only Project Area Historic Exploration Lance projects ‐ 11,381 acres (46 km2) Data from 5,036 rotary and percussion holes. Wyoming USA 13 historic resources over 23 miles (37km) of strike consisting of vertically stacked roll front uranium mineralisation; PEN contro

  9. Slide 9: Lance Project Description

    Lance Project Description For personal use only y The Lance projects are situated in NE Wyoming, 31 miles (50 km) NE of Gillette y Mineralisation is hosted by roll fronts within the Lance and Fox Hills Sandstones of Cretaceous age

  10. Slide 10: World Uranium Demand to Grow Rapidly

    World Uranium Demand to Grow Rapidly For personal use only The world is well on the way to consuming as much energy in the next 25 years as it has consumed throughout modern history If carbon emissions are to be reduced to 2005 levels then: y Between 24 and 32 new 100MW nuclear reactors will need to

  11. Slide 11: USA Energy Requirements

    USA Energy Requirements For personal use only y US energy Consumption continues to rise y Current Reliance on Coal to provide majority of Electricity y Increasing pressure to reduce greenhouse emissions whilst reducing reliance on foreign energy sources y George W Bush recently referred to nuclear p

  12. Slide 12: Wyoming Mining Environment

    Wyoming Mining Environment For personal use only y Stable, mining‐friendly state with a sparse population of 0.5 Million y Significant state revenue is from oil, coal, methane and uranium production y The mining industry is a significant employer of people in Wyoming y Continuous uranium production

  13. Slide 13: Site Infrastructure

    Site Infrastructure For personal use only y Gillette, 31 miles (50km) to the SW is a major mining service centre y The region is serviced by well maintained sealed roads and the project is traversed by well maintained unsealed roads y Activities in the project area include minimal stock raising, low

  14. Slide 14: Lance Project History

    For personal use only Lance Project History y Uranium mineralisation first identified by Mr Al Stoick in late 1960’s y In 1970 Mr Stoick initiated a JV between Bethlehem Steel, Nuclear Dynamics and later Pacific Power and Hydro (NuBeth JV). y 5,036 holes for more than 3.5 million ft (912,000m) were

  15. Slide 15: Lance Projects History

    For personal use only Lance Projects History y After 10 months of successful operation a proposal to commence full scale production was prepared for presentation to the JV members however on the 28 March 1979 the Three Mile Island incident occurred y The pilot plant was shut down shortly after this

  16. Slide 16: Lance Geology

    For personal use only Lance Geology Source: Wyoming Mining Association Classic roll front geology in a sandstone aquifer yU3O8 mineralisation occurs at the interface between oxidized and reduced rocks yIn plan the roll fronts are linear but sinuous in nature

  17. Slide 17: Lance Geology

    Mineral Title currently held is Lance Geology For personal use only outlined in blue, and y Lance Projects Area with PEN being holdings covers 23 miles acquired (37km) N‐S, 5 miles (8km) E‐W outlined in black y Main hosts to U mineralisation N are the Lance Fm and Fox Hills Sandstone 37 km y Stacked

  18. Slide 18: Historic Drilling

    title Historic Drilling For personal use only being acquired outlined y Total of 5,036 holes drilled in black by NuBeth JV in 1970’s N Geological Legend Alluvium Minor U Mineralisation Fort Union Fm Major U host Lance Fm Major U host Fox Hills Fm Pierre Shale Greenhorn Fm Belle Fourche Shale Mowry F

  19. Slide 19: Historic Drilling

    Emerson Lucas title Historic Drilling For personal use only being Houx Clark acquired outlined y Total of 5,036 holes drilled Kendrick Ross in black by NuBeth JV in 1970’s y Widespread Uranium Brookes Carey mineralisation identified N from 13 project areas hosted by multiple roll Chatterton fronts O

  20. Slide 20: Historic Drilling

    Emerson Lucas title Historic Drilling For personal use only being Houx Clark acquired outlined y 20 mineralised sand units Ross in black identified Kendrick y Between 1 and 8 mineralised Carey sands are present in any one Brookes prospect area N y All mineralisation is shallower Chatterton than 525

  21. Slide 21: Historic Mineralisation

    best 13ft @ 0.24%eU3O8 Historic For personal use only best 53ft @ 0.03%eU3O8 best 15ft @ 0.22%eU3O8 best 13ft @ 0.28%eU3O8 Mineralisation best 11ft @ 0.09%eU3O8 y Grades over 0.10% eU3O8 best are widespread showing 7ft @ N potential for higher grade 0.07% eU3O8 zones along mineralised roll best 12ft

  22. Slide 22: Historic Mineralisation

    Av 5ft @ 0.04%eU3O8 Av 8ft @ 0.10%eU3O8 Historic For personal use only Av 15ft @ Mineralisation Av 4ft @ 0.12%eU3O8 0.04%eU3O8 Av 13ft @ 0.05%eU3O8 Av 3.5ft @ 0.11%eU3O8 Av 6ft @ 0.11%eU3O8 Av 7ft y All projects contain averaged @ N mineralisation above realistic 0.06% Av 5ft @ 0.04%eU3O8 cut‐off th

  23. Slide 23: Exploration Potential

    title Exploration For personal use only being acquired outlined in black Potential y Global Exploration Target N Size for all project areas and areas between and along strike is 39‐60 million short tons @ 0.05‐0.07% eU3O8 Geological Legend for 50‐76 million lbs U3O8 1 Alluvium Minor U Mineralisation

  24. Slide 24: Initial Production Centres

    Initial Production For personal use only Production Centre 1 Centre's Ross Exploration target size 8-12 million lb U3O8 y Exploration target size at Ross for feasibility decision is 6.4‐9.5 N million short tons @ 0.05‐0.07% eU3O8 for 8‐12million lb U3O8 1 Geological Legend y Barber exploration targe

  25. Slide 25: Possible Treatment and Metallurgical Process

    Possible Treatment and Metallurgical Process For personal use only y Expected Grade 0.05‐0.09% U3O8 y Estimated recoveries 70% y Anticipated capital cost US$40 million plus US$8 million per year annual well‐field capital y Estimated operating costs US$15/lb U3O8 * y Total costs US$28/lb y Proposed p

  26. Slide 26: Preliminary Scoping Study

    For personal use only Preliminary Scoping Study* US$ per lb US$ /year Revenue $65 $98 million Capital Expenditure $1.3 $2.0 million Financing cost 10% $2.7 $4 million Operating Cost $15 $23 million Royalty 6% $4 $6 million Annual Well Field Capital $5.3 $8 million Total Costs $28.30 $43.0 million As

  27. Slide 27: Recent Activities

    Recent Activities For personal use only y Identification and correlation of mineralised roll fronts throughout project y Aggressive land acquisition program commenced in November 2007 targeting an additional 16,175 acres ( 64km2 ) of prospective ground with historic mineralised drill intersections 2

  28. Slide 28: 2008-2009 Work Program

    2008‐2009 Work Program For personal use only Work Type Timing Confirm veracity of historic data January ‐ March 2008 Prepare internal resource estimate from February –April 2008 historic Information for scoping purposes Continue Land Acquisition program January – June 2008 Commence environmental per

  29. Slide 29: Karoo Projects – South Africa

    Karoo Projects – South Africa For personal use only Area 22 Historic drill area Peninsula Minerals 74% Mmakau Mining (BEE Partner) 26% CEO Bridgette Radebe (Chairperson SAMDA)

  30. Slide 30: Projects Location

    For personal use only Projects Location y Karoo Uranium Province is within the Permo‐ Triassic Karoo Basin y U and Mo mineralisation has been identified in the sandstones of the Beaufort Group

  31. Slide 31: South Africa – Strong Uranium Exploration History

    South Africa – Strong Uranium For personal use only Exloration History y Uranium first discovered in 1970 by Union Carbide y Significant Exploration during the 1970’s and 1980’s identified several U ore bodies within the Karoo Basin y Exploration and development abandoned when U price collapsed in 1

  32. Slide 32: South Africa Mining Environment

    For personal use only South Africa Mining Environment y County with a very long mining history y Well defined system for environmental permitting and development approval y Mining is the most important export earner for South Africa y South Africa has an active uranium mining industry y All uranium

  33. Slide 33: Infrastructure

    Infrastructure For personal use only y Beaufort West, lying on the sealed highway between Cape Town and Johannesburg is approximately central to all the Sites and is a service centre for the region y The region is serviced by well maintained sealed and unsealed roads y Topography is a mixture of fla

  34. Slide 34: Geology

    Geology For personal use only y U (as uraninite and coffinite) and Mo (molybdenite) are hosted within multi‐sequence sandstone units; U precipitates where oxidized groundwater comes in contact with reduced water from shale units or organic material within the sandstone y Tabular to ribbon style mine

  35. Slide 35: Karoo Projects Past Exploration

    Karoo Projects Past Exploration For personal use only y Uranium exploration commenced in 1969, with major companies Union Carbide, Esso and JCI successfully discovering uranium resources up until 1982 y Peninsula’s Sites 22, 29 and 45 contain three of these historic U/Mo resources y As part of the R

  36. Slide 36: Site U and Mo Mineralisation

    Site 22 U and Mo Mineralisation For personal use only y In 1979‐1981 JCI drilled 718 percussion holes and intersected U and Mo mineralisation y A historic resource was produced y The main mineralised trend extends for greater than 2 km and other Zoom into detail areas of of Mo sampling mineralisatio

  37. Slide 37: Site Mo Mineralisation

    Site 22 Mo Mineralisation For personal use only y Mo is associated with U mineralisation, but is often slightly above and offset y Intersections >1000ppm Mo are common

  38. Slide 38: Karoo Current Exploration

    Karoo Current Exploration For personal use only y Detailed low level radiometric survey flown over all six prospecting Rights in January and February 2008 y New radiometric uranium anomalies have been identified at all six Prospecting Rights y Potential to extend existing historic uranium resources

  39. Slide 39: Site Radiometric Anomalies

    Site 22 Radiometric Anomalies Existing GT-7 y New Radiometric For personal use only Strong new uranium resource area (blue) survey detects historic anomalies in areas with no with relatively subtle resource area with historic drilling radiometric moderate anomaly signature y exploration target size

  40. Slide 40: Site Radiometric Anomalies

    Site 29 Radiometric Anomalies For personal use only Historic Union Carbide Resource y Small historic Union Existing U Carbide resource at tail end anomalies of existing anomalous U extended New U radiometric trend anomalies forming distinct NW trend y Existing U anomalies extended y Many new, strong

  41. Slide 41: 2008 Karoo Work Program

    2008 Karoo Work program For personal use only Work Type Timing Fly detailed (100m line spacing by 20m Complete flight height) radiometric and magnetic survey Review radiometric anomalies and Complete prioritise for field testing Commence ground follow‐up of July–August 2008 radiometric anomalies ide

  42. Slide 42: Why Invest In Peninsula Minerals?

    For personal use only Why Invest In Peninsula Minerals? y First class management team y High level of Uranium expertise y Well funded treasury y Undervalued relative to peers y World class uranium projects in USA and South Africa y Initiated development of the Lance Projects y Extensive new radiomet

  43. Slide 43: Notes

    Notes For personal use only 1Please note that the potential quantity and grade of the Exploration Targets in this presentation are conceptual in nature, that there has been insufficient exploration to define a Mineral Resource and that it is uncertain if further exploration will result in the determ

Peninsula Minerals — Investor Presentation (July 2008) on 6ix