Slide 1: Vertical Soil Anchor - Apsara Border
AFCONS INFRASTRUCTURE LTD (Apsara Border -3557) VERTICAL SOIL ANCHOR ….Conducted & Prepared by…Abhijeet Thakurta
Slide 2: Vertical Soil Anchor
• Vertical Soil Anchor:- • Vertical Soil Anchor is a tieback system, used to transfer tensile load to soil. • It is used in the Base Raft of underpass of Apsara Border site. • It is introduced to resist the uplift pressure of water in future due to increse of level of ground water table.
Slide 3: Some major terms used in vertical anchor
• Some Major term used in vertical anchor is:- • Trumpet:- Permanent casin in base raft 250 mm dia- up to 1400 mm depth. • Anchorage Devices :-The anchor head with live wedges to grip the HT strands. • Bearing Plate:- The 32 mm thk.,350mm*350mm size Plate which distributes the ground anchor force to
Slide 4: Equipment required for vertical anchor
-Equipment Required for Vertical Anchor:- • C-6 Boring/Drilling machine - 01 no. • Sihi pump(6 stage) - 01 no. • Grout machine with mixer - 01 no. • Hydraulic hollow Jacks -01 no. • Hydraulic Power pack (pump) - 01 no. • M S Casin ( id-160mm,od-194mm) -50 mtrs. •
Slide 5: Materials
• Materials:- • All materials, fabrication, and construction of soil anchor as per IS-10270(Latest revision). • All mild steel component as per IS:2062-1999 grade “A”. • Cement- OPC 43/53 Grade. • HTS Strands-15.2 mm dia, as per IS-14268,class-II. • HDPE Tube -2.3 +/- 0.3 mm thk. in free length • HD
Slide 6: Epoxy primer and paint, formulation and components
• Epoxy Primer- Zink based • Epoxy Paint -2 pack cold coal tar based Epoxy • Thinner – Epoxy paint thinner • Epoxy Formulation – Araldite-GY 252-100 PARTS BY WT. Hardener – HY 840-145 PARTS BY WT Hardener – HY 940-03 PARTS BY WT Quartz sand- Fine silica sand Bearing plate- mild steel Anchor Head- mi
Slide 7: Protection of strands in free length
• Spacers – mild steel/HDPE • Centralizer - mild steel/HDPE • PROTECTION OF STRANDS:- • IN Free Length:- • The HT strands shall be cleaned throughly, a coat of zinc riched primer coat shall be applied, then apply two coats of coal tar epoxy. • The strands shall be covered with flexible HDPE tube • T
Slide 8: Protection of strands in fixed length
• IN Fixed Length:- • The HT strands shall be cleaned throughly using thinner, uniformly apply first coat of epoxy formulation, and allow to dry for 2-3 hrs. • Thereafter apply second coat and allow to dry for 24 hrs. • Now make the surface rough by manually rubbing with sand paper and apply third c
Slide 9: Installation procedure
• Installation Procedure:- • Bore a 200 mm dia hole with temp. casin through trumpet pipe up to a depth of 19 mtr. • Flush the bore hole for 1 hr. • Lower the Anchor assembly into the bore hole. • Start grouting through inner grout pipe and continue grouting up to fixed length. • Start withdrawal of
Slide 10: Stressing calculation
• Stressing Calculation:- • Ram Area of Jack - 309.6 sq-cm • Efficiency of jack - 98.90% • Force to be applied as per Drg. -476.76 KN (476.76 x 1000/9.81) / 309.6 156.97 KG/SQ-CM Modified Pressure :- 156.97/98.9 158.71 say 159 kg/sq-cm
Slide 11: Elongation calculation (theoretical)
• Elongation Calculation (Theoretical):- Total Elongation = Design elongation + Jack gripping length elongation. Design elongation = 59 mm Design Force = 476.76 kn Elastic shortening of strand over the jack length = PL/AE Number of strands =03 nos. Jack force = 476.76/3 = 158.92 kn Jack gripping len
Slide 12: Modified elongation calculation
• Modified Elongation Calculation:- • Modified Elongation, L2= L1 x (A1x E1/A2 x E2) • L1=Theo extension=62.58mm • A1= Theo area of strands= 140 mm2 • E1=Theo young’s modulus=195000 N/mm2 • No. of strands = 03 • A2 = Actual area of strands = 145.38 mm2 • E2 =Actual young’s modulus value =193630 N/mm
Slide 13: •
•
Slide 14: Slide 14
Slide 15: Slide 15
Slide 16: Slide 16
Slide 17: ,
,
Slide 18: AFCONS
AFCONS w
Slide 19: Slide 19
Slide 20: Thank you
THANK YOU