Exxaro Resources Limited · JSE:EXX
Exxaro Resources — Kumba Resources — MidCap Conference 2004
38 slides from Exxaro Resources's conference presentation, Mar 3, 2004

Slide 1: Harnessing the Power of the Earth – in Africa and beyond
KUMBA RESOURCES “Harnessing the Power of the Earth” – in Africa and beyond RG Wadley Executive Director Strategy & Business Development MidCap Conference, 3 March 2004

Slide 2: Contents
CONTENTS Ø Background and historical review Ø Kumba Iron Ore Ø Kumba Coal Ø Kumba Heavy Minerals Ø Kumba Base Metals (Zinc) Ø Kumba Interim Financial Results Ø Kumba’s Growth Plans 2

Slide 3: Background and Historical Review: Kumba
BACKGROUND AND HISTORICAL REVIEW: KUMBA Iscor Kumba Resources Ø 1928 - Created as State Owned Company 4 Strategic Business Units: Ø 1989 - Privatised Ø Iron Ore Ø 1994 - 2000 - Re-engineering Ø Coal - Down sizing - Continuous Improvement Ø Base Metals Ø 2001 - 26 November Separate Listing Ø Heavy Mi

Slide 4: Key Financials for the 6 months to 31/12/03
KEY FINANCIALS for the 6 months to 31/12/’03 Revenue R 3 962m 207 178 Net operating R 566m 152 profit 112 Headline earnings R 243m 82 Headline earnings 82 cents per share Interim dividend 1H02 2H02 1H03 2H03 1H04 20 cents per share Headline EPS 4

Slide 5: Iron Ore
IRON ORE Ø Sishen mine Ø Thabazimbi mine (dedicated to Iscor) Thabazimbi Ø Sishen-Saldanha export channel Pretoria Johannesburg Sishen NORTHERN Durban CAPE Saldanha Bay Cape Town 5

Slide 6: Iron Ore: Sishen Mine
IRON ORE: SISHEN MINE Ø Established in 1953 Ø 28 Mtpa production Ø Third largest single open pit in the world Ø Contains half the world’s reserves of lumpy iron ore Ø Contract to supply Iscor with 6.25 Mtpa Ø Balance exported via Saldanha Bay 6

Slide 7: Sishen Pit
SISHEN PIT Ø Resource: 1 720 Mt Ø Mineable reserves: 756 Mt Ø In-situ quality : § Fe : 65,38% § P : 0,07% § K20 : 0,22% Ø Potential exists to increase mineral resource to 2 500 Mt 7

Slide 8: Sishen Plant
SISHEN PLANT Products Lump ore DRS 63% 66%Fe of production DR Coarse Sinter Sinter 37% 65%Fe of production Ø World’s largest producer of lumpy ore Ø Ore hard, low in moisture and phosphorus 8

Slide 9: Sishen-Saldanha Rail Line
SISHEN-SALDANHA RAIL LINE Ø Rail length: 861 km Ø Current capacity: 29 Mtpa Ø Potential capacity: 41 Mtpa Ø Train details: 216 x 100 t wagons Ø Schedule: 29 slots / week Ø Turnaround time: 65 hours Ø Train sets: 10 9

Slide 10: Saldanha Bay
SALDANHA BAY Ø Channel depth: 23,5 m Ø Quay length: 3,5 km Ø Max Cargo: 300 000 t Ø Loading rate: 8 000 t/hr Ø Current capacity: 26 Mtpa Ø Potential capacity: 39 Mtpa 10

Slide 11: Iron Ore Markets
IRON ORE MARKETS Global seaborne market Ø World seaborne trade Mt increased by 50 Mtpa in 2003 600 500 Ø Continued growth of Chinese imports to 148 Mt in 2003 400 300 Ø 9% $ price increase in April 2003; 18.62% $ price increase 200 from April 2004 100 0 Ø Sea Freight costs triple over '98 '99 '00 '0

Slide 12: Iron Ore Operations
IRON ORE OPERATIONS Total production and exports Mt 16 Ø Continued growth in production 14 Ø New calendar year record at Sishen - 27.1 Mt 12 Ø Due to high exports of FY03, low stocks at Saldanha influenced 10 exports in 1H04 8 1H02 2H02 1H03 2H03 1H04 Export sales Production 12

Slide 13: Orex Rail Performance
OREX RAIL PERFORMANCE Sishen-Saldanha rail performance Mt 15 Ø Excellent operating efficiencies 10 Ø Continued growth in tonnage railed 5 Ø Capacity expansion to 29 Mt in 2004 0 1H02 2H02 1H03 2H03 1H04 2H04 Kumba Other 13

Slide 14: Coal
COAL Ø Grootegeluk mine Tshikondeni Grootegeluk Ø Leeuwpan mine Ø Tshikondeni mine Pretoria Johannesburg (Dedicated to Iscor) Leeuwpan Ø Member of RBCT Phase 5 Richards Bay Durban Cape Town 14

Slide 15: Coal: Grootegeluk Mine
COAL: GROOTEGELUK MINE Ø Mines 50 Mtpa from open pit with >30 year life Ø Largest coal processing facility in the world Ø Five plants produce 15 Mpta of various coal products Ø 12 Mtpa to captive Matimba Power Station; 3 Mtpa metallurgical coal Ø Lowest cost producer in South Africa 15

Slide 16: Coal Markets
COAL MARKETS Thermal coal and coke prices Ø International coal prices (US$/t) influenced by: 50 200 § Strong demand for thermal coal 40 150 § Shortage in supply of coking coal 30 100 Ø Thermal coal supply to 20 50 Matimba at record levels Jan '02 Jan '03 Jan '04 Jul '01 Jul '02 Jul '03 Ø Strong loca

Slide 17: Coal Physical Information
COAL PHYSICAL INFORMATION Coal sales volumes Coal production volumes Mt Mt 10 10 8 8 6 6 4 4 2 2 0 0 1H02 2H02 1H03 2H03 1H04 1H02 2H02 1H03 2H03 1H04 Eskom Domestic Other Coking Coal Export Thermal Coal 17

Slide 18: Coal Operations
COAL OPERATIONS Production Volumes Mt 10 9 Ø Record production at Grootegeluk and Leeuwpan 8 7 Ø Strong focus on cost control 6 5 1H02 2H02 1H03 2H03 1H04 Grootegeluk Leeuwpan Tshikondeni 18

Slide 19: Heavy Minerals
HEAVY MINERALS Ø Ticor (Kumba 51%) – Melbourne based § Tiwest JV with Kerr McGee (50%) - Cooljarloo titanium sands mine •Perth - Chandala synthetic rutile plant Sydney Melbourne - Kwinana pigment plant Ø Ticor SA (Kumba 60%, Ticor 40%) Empangeni § Hillendale titanium sands mine Hillendale Durban § E

Slide 20: Heavy Minerals Production
HEAVY MINERALS PRODUCTION Ticor Ltd Ticor SA % % kt 1H04 1H03 kt 1H04 1H03 change change Ilmenite 222 216 3 Ilmenite 128 43 198 Zircon 41 34 21 Zircon 25 28 (11) Rutile 9 12 (25) Rutile 16 18 (11) Pig iron 22 0 Synthetic 112 97 15 rutile Scrap pig iron 6 0 Leucoxene 17 12 42 Chloride slag 27 0 Pigme

Slide 21: Ticor SA
TICOR SA Hillendale Mine Ø Commissioned in 2001 Ø 1st use of hydraulic monitoring Ø Fairbreeze start-up in 2004 Empangeni Smelter Ø Furnace 1: commissioned March 2003 Ø Furnace 2: commissioned Sept 2003 Ø At full Production 250 ktpa Ti slag 140 ktpa low Mn pig iron 50 ktpa zircon 25 ktpa rutile 21

Slide 22: Heavy Minerals Markets
HEAVY MINERALS MARKETS Zircon and Pigment prices (US$/t) 440 1800 Ø Signs of recovery in pigment market 420 1600 Ø Titania slag market over- 400 1400 supplied and under pressure 380 1200 Ø Zircon and rutile demand extremely strong due to 360 1000 Chinese growth Q4 2001 Q2 2002 Q4 2002 Q2 2003 Q4 200

Slide 23: Heavy Minerals Operations
HEAVY MINERALS OPERATIONS Ilmenite feed rate - Ticor SA Ø Furnace 2 successfully commissioned in Sep 2003 80% 70% Ø Furnace ramp-up ahead of 60% schedule 50% 40% Ø First chloride slag sales - 30% 12 kt 20% 10% Ø Record synthetic rutile production from Tiwest JV 1 2 3 4 5 6 7 8 9 - 112 kt Months sinc

Slide 24: Base Metals
BASE METALS Ø Rosh Pinah mine Ø Zincor refinery Pretoria Johannesburg Zincor Refinery Rosh Pinah Mine Durban Cape Town 24

Slide 25: Base Metals: Rosh Pinah Mine and Zincor
BASE METALS: ROSH PINAH MINE AND ZINCOR Rosh Pinah Mine: Ø >110 ktpa Zn concentrate Ø Zn concentrate to Zincor Ø >30 ktpa Pb concentrate Ø Pb concentrate to open market Zincor: Ø Electrolytic zinc refinery Ø 120 ktpa of Zn metal Ø World’s lowest cost refinery 25

Slide 26: Zinc Markets
ZINC MARKETS LME Zinc metal price US$/t ZAR/t 1000 10000 950 9000 Ø Strong US$ price 900 recovery 8000 850 7000 800 Ø Strong currency 750 6000 depressed Rand 700 5000 earnings 1H02 2H02 1H03 2H03 1H04 Ø Lower treatment Treatment charge revenue charges impacted on 100 results 75 50 25 0 1H02 2H02 1H0

Slide 27: Base Metals Operating Results
BASE METALS OPERATING RESULTS 54 54 Rosh Pinah 37 38 37 Ø Record Zn concentrate output Zn conc. (kt) 1H02 2H02 1H03 2H03 1H04 Zincor 58 57 Ø Production marginally 54 55 lower due to planned maintenance shut 51 Zn metal (kt) 1H02 2H02 1H03 2H03 1H04 27

Slide 28: Growth Projects
GROWTH PROJECTS Iron Ore – Hope Downs (Australia), Faleme (Senegal), Sishen expansion & Sishen South (South Africa) Base Metals – Rosh Pinah (Namibia), Hongye (China), Kipushi (DRC) Coal – Inyanda (South Africa), Moranbah South (Australia) Heavy Minerals – Exploration in Madagascar = !( !( = =!( !(

Slide 29: Potential Iron Ore Expansion
POTENTIAL IRON ORE EXPANSION Mt design capacity Ø Upcurrent classifier to optimise fines recovery New Mine (Sishen South) adds 0.3 Mtpa fine ore 50 Sishen Expansion Ø Additional feed to fines (SEP) and drum plants from July Sishen Projects 10.0 2004, adds 0.7 Mtpa 40 9 9 9 6 Mt Ø Sishen Expansion Pr

Slide 30: Kumba's Interim Financial Results for 6 Months to 31/12/03
KUMBA’S INTERIM FINANCIAL RESULTS for 6 MONTHS TO 31/12/03 30

Slide 31: Revenue
REVENUE R million 1H04 1H03 % Change Iron Ore 1 814 2 259 (20) Coal 855 815 5) Base Metals 471 485 (3) Heavy Minerals - Ticor SA 153 152 - Ticor Ltd 623 - Industrial Minerals 43 39 10) Other 3 20 (85) Total 3 962 3 770 5) US$/R exchange rate realised 7.04 10.08) 31

Slide 32: Operating Profit / Margin
OPERATING PROFIT / MARGIN 1H04 1H03 % Change Rm) (%) Rm) (%) (in Rand) Iron Ore 299) 16) 517) 23 (42) Coal 121) 14) 125) 15 (3) Base Metals (35) 47) 10 Heavy Minerals - Ticor SA (9) 20) 13 - Ticor Ltd 48) 8) -) Industrial Minerals 10) 23) 10) 26 Other 132) (17) Total EBIT 566) 14) 702) 19 (19) Total

Slide 33: Earnings
EARNINGS R million 1H04 1H03 % Change Net operating profit (EBIT) 566) 702) (19) Net financing cost (130) (123) (6) Goodwill and impairment (90) (14) Equity income (13) 30) Taxation (93) (174) Profit after taxation 240) 421) (43) Outside shareholders’ interest 25) 1) Attributable earnings 265) 422)

Slide 34: Cashflow
CASHFLOW R million 1H04 1H03 Opening net debt (2 374) (1 143) Net cash available 606) 335) Taxation and finance charges (264) (400) Dividends paid (184) (252) Net cash flow from operating activities 158) (317) Net cash used in investing activities Heavy minerals project capital (270) (406) Other cap

Slide 35: Ratios
RATIOS R million 1H04 1H03 Margin excluding captive arrangements EBIT (%) 18 25 EBITDA (%) 26 31 Net financing cost cover EBIT (times) 4.4 5.7 EBITDA (times) 6.8 7.7 Return on equity - attributable income (%) 5.2 9.1 Net debt / equity (%) 41 38 35

Slide 36: Outlook
OUTLOOK Ø Business climate remains challenging 4 Strong currency environments 4 High oil prices 4 Continued domestic cost pressures Ø But, stronger commodity markets: 4 Iron ore price increase 4 Higher coal prices 4 Zinc price recovery Ø Therefore, we believe the next 6 months should be better 36

Slide 37: Thank You
THANK YOU Presentation available on Kumba website @ www.kumbaresources.com (under Investor Relations – Presentations) 37

Slide 38: EBIT Comparison
EBIT COMPARISON R million 244 (628) 4 Strong sales volumes 136 4 Higher iron ore prices 702 119 (11) 566 34 (87) 4 Major currency impact 57 4 Good cost control Sales volume Exchange rate impact 4 Ticor Ltd Stock movement Ticor Ltd consolidation 1H03 EBIT 1H04 EBIT Price Production cost Distribution
Source: Internet Archive copy of exxaro.com
More decks from Exxaro Resources Limited
H1 2026 Earnings Presentation41 slides · Aug 20, 2026
Investor Day (June 2026)100 slides · Jun 22, 2026
FY2025 Earnings Presentation47 slides · Mar 19, 2026
SA Tomorrow Conference 202529 slides · Oct 22, 2025
H1 2025 Earnings Presentation41 slides · Aug 21, 2025
Merger or Acquisition (May 2025)17 slides · May 13, 2025