Jupiter Mines Limited · ASX:JMS

Jupiter Mines — Investor Presentation (October 2018)

26 slides from Jupiter Mines's investor presentation, Oct 16, 2018

  1. Slide 1: Investor Presentation

    Investor Presentation October 2018

  2. Slide 2: Disclaimer

    Disclaimer IMPORTANT: Please read the following before continuing. This Presentation has been prepared by Jupiter Mines Limited ACN 105 991 740 (Jupiter or the Company) solely for information purposes. This Presentation has not been approved by any regulatory or supervisory authority. This Presentat

  3. Slide 3: Introduction

    Introduction Capital Structure Overview Shares on Issue # 1,959 million ▪ Commenced trading on ASX on 18 April 2018 ▪ Jupiter Mines Limited (“Jupiter”) owns a 49.9% beneficial interest in the world Options on Issue # Nil class Tshipi Borwa Manganese Mine (“Tshipi”) located in the manganese Current s

  4. Slide 4: Board & Management

    Board & Management Jupiter Team Tshipi Team Brian Gilbertson Non Executive Chairman ◼ In 1997, Gencor Limited restructured its non-precious metals interests as Billiton plc. With Mr Gilbertson as Executive Chairman, Billiton plc raised US$1.5 billion in an initial public offering on the LSE, taking

  5. Slide 5: Manganese Ore Index

    Manganese Ore Index 37% Mn, FOB Port Elizabeth $ per dmtu of contained metal Manganese prices influenced by: ◼ Market rebalancing ◼ Chinese dynamics ◼ Limited life of some major mines US$ / dmtu 9 FY18 average manganese price = US$4.69 / dmtu Current spot manganese price (37% FOB PE) is US$6.22 / dm

  6. Slide 6: Exceptional Operating and Financial Performance at Tshipi

    Exceptional Operating and Financial Performance at Tshipi 100% TSHIPI (Note: Jupiter 49.9%) FY18 FY19 (to August 2018)1 LTM August 2018 ² H1 2019 annualised⁶ Manganese ore sales Million tonnes 3.34 1.88 3.85 3.76 Revenue USDm 3 561 414 753 827 EBITDA USDm 3 237 205 357 410 Net Profit / (Loss) After

  7. Slide 7: History of Delivering Cash Returns to Jupiter Shareholders

    History of Delivering Cash Returns to Jupiter Shareholders ◼ Management delivered a full operating Tshipi mine at a cost of A$100m to Jupiter shareholders ◼ Tshipi is operating on a debt free basis with strong cash generation capabilities ◼ Inaugural distribution to Jupiter shareholders of A$71m for

  8. Slide 8: Tshipi

    Tshipi

  9. Slide 9: Safety – Tshipi's Top Priority

    Safety – Tshipi’s Top Priority ◼ Proud track record of safety Lost Time Injuries ◼ No fatalities since Tshipi’s inception 5 # of occurences ◼ One section 54 stoppage since inception that was lifted after one day 4 ― proactive engagement with the Department of Mineral Resources 3 3 3 3 ― currently co

  10. Slide 10: Tshipi at a Glance

    Tshipi at a Glance Location Key Asset Highlights 1 One of the Largest and Lowest Cost Manganese Exporters Globally 2 Abundant and Shallow Resource 3 Flexible Onsite and Offsite Infrastructure Capacity Allowing for a Rapid Response to Evolving Market Conditions 4 Recognised and Established Product Qu

  11. Slide 11: Jupiter's Marketing Business

    Jupiter’s Marketing Business ◼ Jupiter Mines S.A. is responsible for the marketing of the Jupiter portion of Tshipi production ◼ Jupiter earns a 3% marketing fee commission calculated off free-on-board revenue and is considered a strong and stable revenue stream by Jupiter - For FY18 it sold 1.7Mt,

  12. Slide 12: One of The Largest and Lowest Cost Manganese Exporters Globally

    1 One of The Largest and Lowest Cost Manganese Exporters Globally ◼ Large-scale production of Production by Mine (2018 CRU estimate) c.3.3 million tonnes per year from established operations (Million tonnes) ◼ Open-pit, shallow mine with an integrated processing plant 6.00 allowing Tshipi to deliver

  13. Slide 13: Abundant and Shallow Resource/Reserve

    2 Abundant and Shallow Resource/Reserve Resource Base Evolution ◼ Large-scale, c.460 million tonne, resource base as of 31 December 2017 located in the well-established Kalahari Manganese Field ◼ Track record of resource growth and resource to reserve conversion ◼ Shallow open-cast mine with a homog

  14. Slide 14: Flexible Onsite and Offsite Infrastructure Capacity (3a)

    3a Flexible Onsite and Offsite Infrastructure Capacity Allowing for a Rapid Response to Evolving Market Conditions ◼ Flexible production base and Flexible Infrastructure logistics allow for efficient ramp-up of production and exports depending on market Crushing Equipment Product Stockpiles conditio

  15. Slide 15: Flexible Onsite and Offsite Infrastructure Capacity (3b)

    3b Flexible Onsite and Offsite Infrastructure Capacity Allowing for a Rapid Response to Evolving Market Conditions ▪ Tshipi has negotiated a 5-year rail contract Towns with Transnet Gamagara Water Pipeline ― the allocated tonnage is 2.1 mtpa effective February 2018 with expiry date of 2023 Powerline

  16. Slide 16: Recognised and Established Product Quality

    4 Recognised and Established Product Quality ◼ Branded products with a well-established customer base ◼ Rigorous product testing throughout the logistics chain ◼ Range of Tshipi’s products includes: ― high grade lumpy, (2015) contractual grade 36.5% Mn content ― high grade fines, contractual grade 3

  17. Slide 17: Strategy to Enhance Cash Flow Through Optimisation Initiatives

    5 Strategy to Enhance Cash Flow Through Optimisation Initiatives Targeted Savings (per Financial Year) From Current Operating Initiatives Infrastructure and logistics related Total savings of Production related savings of savings of c.R 210m – R 283m+ c.R 121m p.a. c.R 83m – R146m+ p.a. p.a. $ 0.05

  18. Slide 18: Regional Consolidation and Co-Development Opportunities

    6 Regional Consolidation and Co-Development Opportunities Kalahari Manganese Field(3) ◼ The Kalahari Manganese Field is a premium manganese basin where a number of manganese mines are currently operating 8 ◼ Given the close proximity of various active sites, potential opportunities exist for 7 conso

  19. Slide 19: The Investment Proposition

    The Investment Proposition Key Investment Statistics & Performance Ratios ¹ ◼ Crude steel and evolving battery material exposure on the Metric Jupiter ASX Current share price A$ $0.31 ◼ Long life, low cost, debt free asset and company Options on Issue # Nil Shares on Issue # 1,959 ◼ Strong cash gene

  20. Slide 20: Appendices

    PAR? wo i Appendices ~

  21. Slide 21: Overview of the Manganese Market

    Overview of the Manganese Market Key Considerations Illustration ◼ The global manganese market is rebalancing towards equilibrium after recent Global manganese production and consumption ‘000 t contained MN production cuts 19,000 ― Globally, around 12 million tonnes of ore capacity cuts were announc

  22. Slide 22: Onsite Transportation Snapshot

    Onsite Transportation Snapshot Commentary Illustration ◼ Tshipi constructed an 8km rail loop connecting the Transnet Freight Rail (TFR) regional railway to the mine’s siding and rapid load terminal (RLT) Rail Loop ◼ The rail loop is designed to handle two 208 wagon trains and withstand the weight of

  23. Slide 23: Optionality Around Key Export Ports

    Optionality Around Key Export Ports Overview Distance 1 ◼ Transnet-operated port with 3 terminals Port ◼ Africa’s largest exporter of manganese, housing a manganese c.1,000km bulk handling facility which was recently upgraded to enhance Elizabeth capacity ◼ Located beside South Africa’s newest port

  24. Slide 24: Reserves and Resources Statement

    Reserves and Resources Statement ◼ JORC Resources & Reserves (31 Dec 2017) stated adjacent are on a 100% Tshipi basis JORC Reserves (31 Dec 2017) Tonnes (Mt) Grade (% Mn) Proved 48 36.3 ◼ Tshipi has completed an extensive drilling program throughout FY 2016 Probable 39 36.4 (and in FY17 & FY18) in o

  25. Slide 25: Tshipi's Minimal Ongoing Capex Requirements

    Tshipi’s Minimal Ongoing Capex Requirements Capital Expenditure Profile (Rm) ◼ Historical capital expenditure (Rm) reflects plant construction 300 9.3% 9.8% 1.8% 0.7% ◼ Estimated total capex of R274m over FY19 – FY30 comprises: 252 ― R145m sustaining 250 ― R129m: expansionary ◼ Limited sustaining ca

  26. Slide 26: Strong BEE Partner – Great Relationship

    Strong BEE Partner – Great Relationship ◼ Main Street 774 (Pty) Ltd (Main Street), is a broad-based black economic empowerment (B-BBEE) special purpose vehicle, with its major shareholder being Ntsimbintle Mining Ownership Structure (Pty) Ltd (Ntsimbintle). ◼ Ntsimbintle, a B-BBEE company, was forme

Jupiter Mines — Investor Presentation (October 2018) on 6ix