Cascadia Minerals Ltd · TSXV:CAM
Cascadia Minerals — Investor Presentation (October 2026)
21 slides from Cascadia Minerals's investor presentation, October 2026
Slide 1: Corporate Presentation – October 2026
TSXV: CAM OTCQB: CAMNF Corporate Presentation – October 2026
Slide 2: Forward-Looking Statements
Forward-Looking Statements FORWARD-LOOKING STATEMENTS This presentation contains forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to the success of exploration activities. These statements are based on in
Slide 3: Cascadia Corporate Overview
Cascadia Corporate Overview 6-Month Stock Performance Capital Structure (October 1, 2026) (TSX-V: CAM) Shares Outstanding 213,344,485 Warrants ($0.15 - $0.45) 53,100,632 Options ($0.15 - $0.80) 12,853,700 Restricted Stock Units 270,000 Fully Diluted 279,568,867 Market Capitalization $106 million Wor
Slide 4: Exploring for Copper & Gold in Yukon, Canada
Exploring for COPPER & GOLD in Yukon, Canada CARMACKS PROPERTY ✓ M&I Resource: 651 Mlbs Cu and 302 koz Au at 1% CuEq ✓ 2023 PEA: $330M Post-Tax NPV(5%) at US$4.25/lb Cu, US$2,000/oz Au ✓ District-scale discovery potential, 40 km from past- producing Minto Mine ✓ Road-Accessible, low cost of drilling
Slide 5: Carmacks Property
Carmacks Property ▸ Building Relationships: Traditional Territory of the Little Salmon Carmacks and Selkirk First Nations ▸ Robust Infrastructure: road-accessible, 10 km from power ▸ District Scale: 180 km2 land position in the Minto Copper Belt, 40 km southeast of the past-producing Minto Mine ▸ Ne
Slide 6: Carmacks Deposit – 2023 PEA
Carmacks Deposit – 2023 PEA Key Parameters • C$220M initial capital cost • Cu Recovery: 92% Sulfide, 55% Oxide • 9-year initial mine life • Au Recovery: 58% • 7,000 tonne per day mill • 34 M lbs CuEq/yr Base – $3.75 Cu, $1,800 Au, $22 Ag Case 1 – $4.25 Cu, $2,000 Au, $25 Ag ✓ $324M NPV5% pre-tax ✓ C
Slide 7: Carmacks Deposit – Long Section & 2026 Drilling
Carmacks Deposit – Long Section & 2026 Drilling Historical exploration focused on shallow copper oxide mineralization ▸ Historic resource focussed on shallow Copper Oxide ▸ 2025 Plan - 13 holes to 2026 drilling: test depth >17,000mineralization of sulphide m completedandof astep planned out on18,000
Slide 8: Carmacks Property – Deposit Area Map
Carmacks Property – Deposit Area Map >17,000 m of drilling in 36 holes completed to-date in 2026 2026 drilling has identified new high- grade mineralization in the gap between Zone 2000S and Zone 147 8
Slide 9: Carmacks Property – Zone 2000S, Long Section
Carmacks Property – Zone 2000S, Long Section Mineralization has been identified over 300 m along strike of the Zone 2000S Resource Holes 58 and 59 represent two of the best intersections ever drilled on the project 9
Slide 10: Carmacks Property – Zone 2000S, Section A
Carmacks Property – Zone 2000S, Section A This section lies beyond the historical Mineral Resource at Zone 2000S Drilling in this area is exhibiting higher copper and gold grades than typically seen 10
Slide 11: CD-26-058/059 Core Photos – Zone 2000S
CD-26-058/059 Core Photos – Zone 2000S CD-26-058 – 468.90 m: Chalcopyrite bands CD-26-059 – 559.15 m: Massive Chalcopyrite CD-26-058 – 482.50 m: Bornite & chalcopyrite CD-26-059 – 513.49 m: Molybdenite 11
Slide 12: Carmacks Project – Near-Deposit IP Targets
Carmacks Project – Near-Deposit IP Targets 2022 IP Survey identified numerous targets close to the deposit – minimal follow-up to date 12
Slide 13: Minto Copper Belt – Untapped Regional Potential
Minto Copper Belt – Untapped Regional Potential ▸ 180 km2, brownfields property covering large portion of the Minto Copper Belt towards Minto Mine ▸ Multiple near-deposit targets identified for follow-up, with four significant IP targets <1 km from current resource ▸ Goldspot completed digitization
Slide 14: Carmacks Project Advancement
Carmacks Project Advancement Rapid Advancement of a Near-Term Critical Minerals Project ✓ Acquisition of Granite Creek Copper closed in August 2025 ✓ 3,800 m resource expansion drill program completed in fall 2025 ❑ 18,000 m fully-funded drill program underway ❑ 2026 and 2027 drilling to expand reso
Slide 15: Agnico Eagle Strategic Exploration Alliance
Agnico Eagle Strategic Exploration Alliance Multi-year Strategic Alliance focused on gold and copper exploration in Yukon’s Stikine Terrane Stikine Terrane extends into Yukon from BC’s Golden Triangle and is highly prospective for gold- copper porphyry mineralization Minimum of $500,000/yr of genera
Slide 16: Corporate Strategy
Corporate Strategy 1. Carmacks Project – 100% Owned Flagship Property Fully-funded 18,000+ m drill program underway Approximately 13,000 m focused on step-outs to expand the existing deposit Remaining 5,000 m will test near-deposit and regional targets outside the resource Targeting near-ter
Slide 17: Thank you
www.cascadiaminerals.com Thank you info@cascadiaminerals.com
Slide 18: Other Properties
@ Appendix Other Properties
Slide 19: Rosy Property, Yukon
Rosy Property, Yukon 61 km2 road accessible property located 77 km east of Whitehorse surrounding the Red Mountain Molybdenum deposit owned by Tintina Mines Ltd. Over 35 low sulphidation epithermal quartz- carbonate veins occur on the property Anomalous gold in soil over 3.8 x 2.5 km with untested h
Slide 20: Idaho Creek Property, Yukon
Idaho Creek Property, Yukon 14 km2 property located adjacent to Western Copper and Gold’s Casino Project, where Rio Tinto and Mitsubishi Materials are strategic investors 14 km east of the Casino Deposit, with Casino Suite aged intrusions mapped on property Casino Project proposed road route runs th
Slide 21: Idaho Creek Property, Yukon
Idaho Creek Property, Yukon 2006 drilling in the east portion of the property intersected 122 m of 0.12 g/t Au with 1.93 g/t Ag, ending in mineralization Rock samples have returned up to 10.08 g/t Au with 365 g/t Ag Large 5 x 1 km underexplored Au-Ag-Mo-Pb soil anomaly in the west portion of the pro
Cascadia Minerals — Investor Presentation (October 2026) on 6ix