Alien Metals Ltd · LSE:UFO
Alien Metals — Arian Silver — Investor Presentation (May 2012)
21 slides from Alien Metals's investor presentation, May 30, 2012
Slide 1: A New Silver Producing Company in Mexico
A New Silver Producing Company in Mexico 30 May 2012
Slide 2: Sid S =
a = a — Sid 5 2 S =
Slide 3: Investment Highlights
INVESTMENT HIGHLIGHTS Growth • Q1, 2012 production: Approx. 76,000 oz. (2011 production: Approx. 250,000 oz.) Ag in concentrate • 6,300 ha of contiguous concessions with multiple exploration targets • 29% increase in resource tonnage with NI 43-101 resource (Mar 2012) - 32% increase in contained s
Slide 4: Directors & Management
DIRECTORS & MANAGEMENT JIM WILLIAMS Co-founder, President & CEO Exploration & Mining Geologist with over 25 years experience worldwide. Good knowledge of Mexico and specifically Zacatecas State. TONY WILLIAMS Co-founder, Chairman Mining Geologist with over 35 years experience in international mining
Slide 5: Corporate
CORPORATE Exchanges: TSX-V / AIM : AGQ FSE : I3A Shares Outstanding: 302 M 70 SHARE PRICE (Daily) 60 Market Capitalization: £50 M (C$79M) 50 52 Week High/Low: £0.15 – 0.41 40 30 $0.23 – 0.61 20 10 Warrants: None 0 May-11 Jul-11 Sep-11 Dec-11 Feb-12 May-12 AIM Closing Price (Pence) TSX-V Closing Pric
Slide 6: Property Locations
PROPERTY LOCATIONS Located within the famous silver belt of Zacatecas 6
Slide 7: San José
SAN JOSÉ Fully permitted Operational cash flow achieved in 2011 Significant resource upside San José Mine Tunnel, Zacatecas, Mexico 7
Slide 8: San José Operational Summary
SAN JOSÉ OPERATIONAL SUMMARY Production Full Year Q1 2011 2012 Tonnes mined ('000) 100 22 Tonnes milled ('000) 84 24 Ag concentrate tonnes produced 750 302 Ag ounces produced ('000) 250 76 Financial • Revenue from sale of silver concentrate Q1: US$2.3 million (Full year 2011: US$7.5 million) 8
Slide 9: San José Potential for Growth
SAN JOSÉ POTENTIAL FOR GROWTH Exploration • San José further production to be subsidised by concentrate sales this will include: - Infill and step-out drilling on and from current resource blocks; - Further detailed exploration along western strike extension; and - Phase 5 drilling planned to commen
Slide 10: San José Mining Infrastructure
SAN JOSÉ MINING INFRASTRUCTURE • Pro mining region with multiple mining operations significant infrastructure in place • Full mechanization mining methods via the main San José ramp • San José ramp (5 m wide x 4 m high) extends approx 4 km along the SJV • 500 TPD vertical shaft exploited SJV to ~350
Slide 11: San José Current Resources
SAN JOSÉ CURRENT RESOURCES Resource Gross Average Grade Contained Metal Category Tonnage Ag (g/t) Pb (%) Zn (%) Ag (Moz) Pb (Mlbs) Zn (Mlbs) Indicated 8,000,000 119 0.38 0.85 30.61 67.02 149.91 Inferred 24,500,000 110 0.38 0.76 86.65 205.25 410.50 Note: Mineral resource estimates based on all Phase
Slide 12: 12
12 12
Slide 13: San José Current Resource Blocks
SAN JOSÉ CURRENT RESOURCE BLOCKS 13
Slide 14: 14
14 14
Slide 15: Calicanto Zacatecas
CALICANTO ZACATECAS The Calicanto Project: Exploration • 100% ownership • Approx. 80 ha • Partly contiguous with Capstone’s San Roberto (Cozamin) Property • 4 vein systems discovered; big potential for more • Average grade of ~250 g/t Ag, and 1.0 g/t Au on Calicanto Vein • Phase 1 (3,200 m) diamond
Slide 16: Calicanto Main Vein
CALICANTO MAIN VEIN Historic ‘bonanza’ Oxide Zone grade workings Sulphide Zone ‘Splay’ vein, minimal historical mining Bonanza Average Au-Ag 4m wide grades vein with stockwork 16
Slide 17: Silver the End Product
SILVER THE END PRODUCT Why is this indispensable metal in such demand? Silver has a number of unique properties including its strength, malleability and ductility, its electrical and thermal conductivity, its sensitivity to and high reflectance of light and the ability to endure extreme temperature
Slide 18: Core Asset Summary
CORE ASSET SUMMARY San José Project – production • 100% ownership on ~63 square kilometres (6,300 ha) property • 55 km from Zacatecas City • Current (Includes Phase 1,2,3 & 4) Resource Estimate - Indicated: 30.61 M oz Ag, 67.02 M lbs Pb and 149.91 M lbs Zn - Inferred: 86.65 M oz Ag, 205.25 M lbs Pb,
Slide 19: For More Information
FOR MORE INFORMATION Jim Williams Arian Silver Corporation +44 20 7887 6599 jwilliams@ariansilver.com www.ariansilver.com Cathy Hume CHF Investor Relations +1 416 868 1079 x 231 cathy@chfir.com www.chfir.com Dominic Barretto Yellow Jersey PR +44 (0) 776 853 7739 dominic@yellowjerseypr.com www.yellow
Slide 20: Disclaimer
DISCLAIMER The information contained in this presentation (“Presentation”) has been prepared by Arian Silver Corporation (the “Company”). The Presentation has not been independently verified and the information contained within it may be subject to updating, revision and further amendments. The Pres
Slide 21: Arian Silver Mexico
SILVER ARIAWN D) MEXICO NIN)