  1. Slide 1: Horizon Oil Limited Investor Presentation November 2013

    Horizon Oil Limited ABN 51 009 799 455 Investor Presentation November 2013 This presentation contains some references to forward looking assumptions, representations, estimates and outcomes. These are uncertain by the nature of the business and no assurance can be given by Horizon Oil Limited that i

  2. Slide 2: Horizon Oil Snapshot

    Horizon Oil Snapshot  Market capitalisation of A$436m at A$0.335 per share on 1 November 2013 (1,301.2m shares)  Current net production: Maari/Manaia 900 bopd priced at Brent plus US$5-6 US$5 6 (prior to shut-in shut in for facility upgrade) Beibu Gulf 4,000 bopd priced at Brent less US$4  Curren

  3. Slide 3: Shareholder Distribution and Trading Statistics

    Shareholder Distribution and Trading Statistics SHARE PRICE HISTORY TRADING STATISTICS 3

  4. Slide 4: Geographic Focus and Asset Location

    Geographic Focus and Asset Location Focus on productive fairways and mature operating areas in SE Asia / Australasia Conventional plays with scale and upside - conservative approach to exploration 4

  5. Slide 5: Investment Proposition

    Investment Proposition  Focused southeast Asian/Australasian E&P specialist  Strong, long-lived cashflows from Maari/Manaia fields, offshore New Zealand, re-invested to fund future capital program. Low risk, new reserves appraisal drilling and mid-life field upgrade program to begin Q3 2013  Beib

  6. Slide 6: Net Reserves, Contingent Resources and Prospective Resources

    Net Reserves1, Contingent Resources1 and Prospective Resources1 as at 30 April 2013, Post Osaka Gas Transaction RESERVES CONTINGENT RESOURCES PROSPECTIVE RESOURCES Proven + Probable Proven + Probable Best Estimate PRL 4 (Stanley Liquids)4 Block 22/12 WZ 12- 0..4 mmbo Block 22/12 PMP 38160 PRL 21 (El

  7. Slide 7: Forecast Net Production From Reserves + Contingent Resources

    Forecast Net Production From Reserves + Contingent Resources as at 30 April 2013, Post Osaka Gas Transaction Includes historical production prior to 30 April 2013 Based on proven and probable reserves and contingent resources, estimated in accordance with SPE-PRMS standard Timing of new field produc

  8. Slide 8: Significant Recent Achievements

    Significant Recent Achievements Beibu Gulf fields on stream and Phase I development nearing completion  Pre-development exploration drilling on WZ 6-12 fields resulted in reserves upgrade of 18% p  10 well development drilling gpprogram g from WZ 6-12 wellhead p platform completed p safely, y, ahe

  9. Slide 9: Upcoming News Flow and Share Price Catalysts

    Upcoming News Flow and Share Price Catalysts Timeframe  Improved production performance from Maari/Manaia fields and progress on Q3 2013 - 2014 appraisal pp drilling g and field upgrade pg  Ramp up to peak oil production of Beibu Gulf fields Phase I development Ongoing - Q3 2013  Progress on Beib

  10. Slide 10: Maari/Manaia Fields – New Zealand

    Maari /Manaia Fields – New Zealand PMP 38160: Reserves at 1/05/13 (mmbo) HZN 10% (RISC estimate) OMV 69% (Op) Produced 22 Todd 21% Remaining developed 52 CUE 5% Remaining undeveloped 34 10

  11. Slide 11: Maari/Manaia – Key Points

    Maari//Manaia – Key Points Maari  Wellhead platform / FPSO development in 100 m water depth  Maari Moki zone developed with 5 producer wells and 3 water injectors – field developed on basis off 60 mmbo b recoverable bl reserves; successful f l appraisal/development i l/d l wells ll drilled d ill d

  12. Slide 12: Maari Field Development Assets

    Maari Field Development Assets 12

  13. Slide 13: Maari/Manaia Upside Potential

    Maari /Manaia Upside Potential Two wells to be drilled in 2013/14 (Manaia-2 and Maari Deep) to address new reserves - unrisked potential of 20 - 25 mmbo 13

  14. Slide 14: Maari/Manaia Growth Projects

    Maari/Manaia Growth Projects Objective to reconfigure water injection scheme, access undeveloped reserves and optimise production 14

  15. Slide 15: PEP 51313 – New Zealand

    PEP 51313 – New Zealand D Deep prospectt and d llead d inventory i t with ith 163 mmbo b exploration l ti potential t ti l PEP 51313: HZN 21% ((10% Whio)) OMV 30% (Op) Todd 35% CUE 14% Whio-1 to be drilled in Q1 2014 with mean potential of 27 mmbo (operator estimate) 15

  16. Slide 16: Beibu Gulf Fields, China – Development Areas

    Beibu Gulf Fields, China – Development Areas Block 22/12 Post-CNOOC Back-in: HZN 26.95% CNOOC 51.00% (Op) ROC 19.60% Majuko Corp 2.45% Gross reserves 1P 2P 3P (mmbo) As at 31/12/2011 18.5 24.0 29.4 Additi Additions 44 4.4 43 4.3 74 7.4 As at 31/12/2012 22.9 28.3 36.8 Increase 24% 18% 25% 16

  17. Slide 17: Beibu Gulf Fields – Key Points

    Beibu Gulf Fields – Key Points  2 phase development in 40 - 60 m water depth utilising CNOOC platform facilities, export pipeline and terminal on Weizhou Island  Phase 1 platforms WZ 6-12 and WZ 12-8W connected by pipeline to PUQB utility platform; forecast completion cost within initial US$300m b

  18. Slide 18: Beibu Gulf Fields – Phased Development Scheme

    Beibu Gulf Fields – Phased Development Scheme 18

  19. Slide 19: Beibu Gulf Fields Development Construction Progress

    Beibu Gulf Fields Development Construction Progress PUQB jacket lift by heavy lift vessel Lanjiang (L) WZ 12-8W platform (R) COSL HYSY 931 jack-up rig drilling over WZ 6 6-12 12 platform (L) PUQB modules being lifted onto platform jacket (R) 19

  20. Slide 20: WZ 12-8E Early Production Concept – Phase II

    WZ 12 12--8E Early Production Concept – Phase II WZ 12‐1PUQB  Leased L d mobile bil production d i platform l f NOED Mobile  Flexible pipeline Production Platform  Initially up to three production wells  Run extended DST or pilot production  Drill more wells (4-5) depending on production perfor

  21. Slide 21: Papua New Guinea

    Papua New Guinea Horizon Oil acreage position expanded to ~7,900 sq km, primarily in wet gas “sweet spot” 21

  22. Slide 22: PNG Exploration and Development Program – Key Points

    PNG Exploration and Development Program – Key Points  Commanding 7,900 sq km acreage position in liquids-rich “sweet spot” of foreland area with certified condensate and gas resources of 125 mmboe net, subject to reduction when transaction with Osaka Gas completes  Stanley (PRL 4) and Elevala/Ketu

  23. Slide 23: Horizon Oil Acreage and Joint Venture Partners

    Horizon Oil Acreage and Joint Venture Partners PRL 4: HZN 30% (Op) Osaka Gas 20% Talisman 40% Mitsubishi 10% PRL 21: HZN 27% (Op) Osaka Gas 18% Talisman 32.5% Kina 15% Mitsubishi 7.5% PPL 259: HZN 15% Osaka Gas 10% Eaglewood 65% P3GE 10% PPL 430: HZN 50% (Op) g Eaglewood 50% PPLs 372 and 373: HZN 90

  24. Slide 24: Stanley Project Concept

    Stanley Project Concept Facilities  2 train, 140 mmscfd gas refrigeration plant  Mercury Merc r removal remo al via ia adsorption catalyst catal st beds  Gas sales at plant fence, addition gas recycled to enhance liquids recovery  6 inch, 40 km pipeline to transport liquids to Kiunga  60,000 bb

  25. Slide 25: Stanley Production Facility Site

    Stanley Production Facility Site 25

  26. Slide 26: Kiunga Base and Condensate Loadout Facility

    Kiunga Base and Condensate Loadout Facility 26

  27. Slide 27: PRL 21 (Elevala, Ketu and Tingu) – Development Concept

    PRL 21 ((Elevala Elevala,, Ketu and Tingu) Tingu) – Development Concept 27

  28. Slide 28: Elevala-2 Wellsite and Ketu-2 Well Flow test

    Elevala--2 Wellsite and Ketu Elevala Ketu--2 Well Flow test 28

  29. Slide 29: Tingu Well Site

    Tingu Well Site 12 August 2013  Spudded on 26 August 2013, new gas/condensate discovery; well completed for production and currently being flow-tested  Mean prospective resources (RISC estimate): - 459 bcf gas - 25.6 mmbbl condensate - 14.9 mmbbl LPG included in gas 29

  30. Slide 30: Tingu-1 Flow Test with Parker Rig 226

    Tingu--1 Flow Test with Parker Rig 226 Tingu 30

  31. Slide 31: PNG Gas Commercialisation Options

    PNG Gas Commercialisation Options  Power generation – Ok Tedi Mining Limited (OTML) – Frieda River project (if sanctioned) – Local towns and communities in Kiungag – OK Menga g – Frieda River corridor – Export to West Papua: Merauke, Jayapura  Mid-scale LNG ~2-4 mtpa Expandable mid scale LNG plant

  32. Slide 32: Strategic Alliance with Osaka Gas Co. Ltd. of Japan

    Strategic Alliance with Osaka Gas Co. Ltd. Of Japan  60:40 strategic alliance with global gas company to provide funding + valuation + pathway to LNG commercialisation  Sale S l off 40% off H Horizon i Oil’ Oil’s iinterests t t iin PRL 4 4, PRL 21 and d PPL 259 ffor milestone-based il t b d consid

  33. Slide 33: Upcoming News Flow and Share Price Catalysts

    Upcoming News Flow and Share Price Catalysts Timeframe  Improved production performance from Maari/Manaia fields and progress on Q3 2013 - 2014 appraisal pp drilling g and field upgrade pg  Ramp up to peak oil production of Beibu Gulf fields Phase I development Ongoing - Q3 2013  Progress on Beib

  34. Slide 34: Please visit the Horizon Oil website

    Please visit the Horizon Oil website www.Horizonoil.com.au to see:- see:- Detailed Investor Presentation Latest Quarterly Report Analyst reports on HZN Level 7, 134 William St, The reserve and resource information contained in this announcement is based on information compiled by Alan Woolloomooloo