Schneider Electric Infrastructure Limited · NSE:SCHNEIDER

Schneider Electric Infrastructure — Q2 FY2022-23 Earnings Presentation

21 slides from Schneider Electric Infrastructure's earnings presentation, Nov 4, 2022

  1. Slide 1: Exchange filing cover letter

    Life Is C)n Sc~11eider t;,,El ectr ic SEIL/Sec./SE/2022-23/53 November 4, 2022 The Manager The Secretary Listing Department BSE Limited National Stock Exchange of India Ltd Phiroze Jeejeebhoy Towers, Exchange Plaza, Bandra Kurla Complex Dalal Street Bandra (East), MUMBAI 400 051 MUMBAI 400 001 Fax #

  2. Slide 2: Investor Meeting – Q2, FY 2022-23

    Schneider Electric Infrastructure Ltd November 4, 2022 Investor Meeting – Q2, FY 2022-23 Schneider Electric Infrastructure Limited – Investor Presentation | Page 1 Public

  3. Slide 3: Disclaimer

    Disclaimer All forward-looking statements are Schneider Electric Infrastructure Limited (India) management’s present expectations of future events and are subject to numbers of factors and uncertainties that could cause actual results to differ materially from those described in the forward-looking

  4. Slide 4: Economy Outlook

    Economy Outlook GDP grows in double digits on a low base GDP1 Forecast - 2022 GFCF2 Forecast- 2022 IIP3 Forecast- 2022 GDP real growth (YoY) ■ GFCF real growth (YoY) ■ IIP Growth (YoY) ■ 20.3 - •- GDP CY Actual-Forecast 62.5 - •- GFCF Forecast 44.4 - •- IIP Forecast 13.5 20.2 \~ -· 8.5 8.3 14.6 17.5

  5. Slide 5: Segment Dynamics

    Segment Dynamics Positive opportunities for growth in most segments Power & Grid Mobility Metals, Minerals & Industry & Building Cloud & Service Mining Provider Sustainability & Digitalization  Focus on metro projects  Low investment due to  PLI* - boost to small industry  Capture more MV equipm

  6. Slide 6: Our Wins | Power & Grid

    Our Wins | Power & Grid Helping Bhutan build a robust power distribution system I Customer I I I ' Our Solution I I I I I Challenges ~ I \,. I ' I I I Upgradation of ageing infrastructure Supply of 33kV & 11kV Package I I substations for secondary distribution I I . , Reliable vendor for supply & se

  7. Slide 7: Our Wins | Cloud & Service Provider

    Our Wins | Cloud & Service Provider Catering needs of Data centres to make a move towards digital future Customer Our Solution Challenges Stringent delivery timelines 33KV GIS package Speed of execution Key Highlights 2nd consecutive order, after successful execution of 1st order Life Is <!>n Sc~'le

  8. Slide 8: Our Wins | Metals, Minerals & Mining

    Our Wins | Metals, Minerals & Mining Helping leading steel manufacturer become energy efficient Customer Our Solution Challenges Digitally connected equipment with Pix ROF with Easergy Micom Relays reduced down time Asset Connect Solution with TH110 Power Distribution System with future Local monito

  9. Slide 9: Our Wins | Industry & Building

    Our Wins | Industry & Building Contributing to prestigious building of Government of India Customer Our Solution Challenges Fully integrated Optimized Solution MVT HT Panel Quick Delivery RMU PSS (all connected products) Key Highlight Successful execution of order creating scope for services order (

  10. Slide 10: Our Wins | Services

    Our Wins | Services Providing services to large IT company Customer Our Solution Challenges EcoStruxure EcoStruxure EcoStruxure Power Advisor Asset Advisor Bt..t1ld1ng Adv1so1 Achieving Net-Zero certification in campuses SE Advisory softwares EcoStruxure EcoStruxure EcoStruxure Pan India supervision

  11. Slide 11: Our Wins | Services: Transformer predictive maintenance

    Our Wins | Services Bringing advancement in Transformer segment for predictive maintenance AURTR.t TRANSFORMING POWER ASSET MANAGEMENT Customer Our Solution Acquisition by SE Challenges Leveraging in India Live monitoring of Critical Assets EcoStruxure Transformer Expert (ETE) Identified 150 potenti

  12. Slide 12: Accelerate Digital: Segments

    Accelerate Digital External factors Regulation on cloud services: Local Cloud | Existing EAA Solution not deployable Segments Impact on Power & Grid Transportation Metals, Mining & Mineral I&B & C&SP Pilot for alternate solution to Pilots in brownfield to Collaboration with FS to ~40% OB of I&B with

  13. Slide 13: Increasing focus on Recurring services driven by Digital

    Increasing focus on Recurring services driven by Digital Market Drivers Increasing Customer expectations | Use of advanced Tech in Operations | Migration to Cloud Digital & Consulting org Focus team on Digital & consulting services Digital champions 9 sessions | >60% sales force Trained & certified

  14. Slide 14: Services Strategic Pillars

    Services Strategic Pillars Vision 2025 3.5X 1.5X 1.5X More Maintenance Modernization More Spare Reinforce the Core Contracts Jobs Parts Increase Renewal / Capture Rate Target More Obsolete Assets Install base Coverage Greenfield Attachment Spare Kits 5X 2X 1.5X Digital & Consulting Track to Partner

  15. Slide 15: Customer Connect

    Customer Connect LIVE Virtual Ministry Of Civil , Aviation Ministry of Power, Puducherry: Ministry of Energy Dept, Karnataka : : Airports Distribulec Distribulec Innovation Day (Digitization & Building sustainable Grids, Uttarakhand Building sustainable grids, Guwahati Sustainability), Kathmandu Bui

  16. Slide 16: Financial Update

    Financial Update Page 15 Life Is <!>n Sc~'leider c, El ectric Schneider Electric Infrastructure Limited – Investor Presentation | Page 15 Public

  17. Slide 17: Orders

    Orders -3.2% +11.6% 3,087 2,988 6,668 5,974 Q2 FY22 Q2 FY23 H1 FY22 H1 FY23  Q2 Orders drop due to shifting of some orders finalization to Q3, growth is driven by Diffused and MMM segment All figures in MINR Life Is <!>n Sc~'leider c, Electric Schneider Electric Infrastructure Limited – Investor Pr

  18. Slide 18: Sales

    Sales +39.5% +34.3% 4,208 7,923 3,017 5,899 Q2 FY 22 Q2 FY 23 H1 FY 22 H1 FY 23  Good momentum in sales All figures in MINR Life Is <!>n Sc~'leider c, Electric Schneider Electric Infrastructure Limited – Investor Presentation | Page 17 Public

  19. Slide 19: P&L Statement – Q2 FY23 Vs Q2 FY22

    P&L Statement – Q2 FY23 Vs Q2 FY22 Q2 FY23 Q2 FY22 YoY (%) MINR % MINR % Change Sales 4,208 3,017 39.5% Other Income 51 1.2% 35 1.1% Total Sales 4,259 3,051 Material Costs 2,951 70.1% 2,074 68.7% Gross Margin 1,308 31.1% 978 32.4% -1.3pts Employee Costs 632 15.0% 588 19.5% 7.5% Other Expenses 437 10

  20. Slide 20: P&L Statement – H1 FY23 vs H1 FY22

    P&L Statement – H1 FY23 vs H1 FY22 H1 FY23 H1 FY22 YoY (%) MINR % MINR % Change Sales 7,923 5,899 34.3% Other Income 56 1.3% 48 1.6% Total Sales 7,978 5,947 Material Costs 5,409 68.3% 4,053 68.7% Gross Margin 2,570 32.4% 1,894 32.1% +0.3pts Employee Costs 1,196 15.1% 1,090 18.5% 9.8% Other Expenses

  21. Slide 21: Public

    Lifels On | Schneider G@ Electric

Schneider Electric Infrastructure — Q2 FY2022-23 Earnings Presentation on 6ix