Mundoro Capital Inc. · TSXV:MUN

Mundoro Capital — PDAC 2016

39 slides from Mundoro Capital's conference presentation, March 2016

  1. Slide 1: Focused Investment in Gold & Copper Projects

    Focused Investment in Gold & Copper Projects

  2. Slide 2: Forward-Looking Statements

    TSXV:MUN Forward-Looking Statements: Certain statements made during this presentation, including, without limitation, those concerning the economic outlook for the resource exploration industry, expectations regarding metal prices, growth prospects and the outlook of Mundoro’s operations, including

  3. Slide 3: Mundoro's Value Proposition

    Mundoro’s Value Proposition 3

  4. Slide 4: Cash in Treasury to Execute on Strategy; Partner Spending on Exploration

    TSXV:MUN CASH IN TREASURY TO EXECUTE ON STRATEGY PARTNER SPENDING ON EXPLORATION  $ STRATEGIC DISTRICT SCALE EXPERIENCED INVESTMENTS EXPLORATION PARTNERSHIP WITH PROJECT OPERATING JOGMEC IN SERBIA PACKAGE IN AND GOLD MINE + MINERAL-RICH CORPORATE DEVELOPMENT ADDITIONAL TETHYAN BELT TEAMS GOLD PROJE

  5. Slide 5: Key Projects & Investments

    TSXV:MUN Key Projects & Investments European Exploration Portfolio SERBIA: Drilling Highlights: 81.2m of 0.35% CuEq 25.8m of 0.43% CuEq BULGARIA: Prospective copper and gold targets Investment in Maoling Gold Project Mexico Property for JV 2005 Prefeasibility Study NPV(0%) of $244mm @ Camargo – Copp

  6. Slide 6: Building Upon Historical Discoveries

    a MUNDORO TSXV:MUN Building Upon Historical Discoveries +58 Moz of Gold and Copper MACEDONIA, lovitza a ™. Q ft" fepe } A es Jundoro Licences { . 5 q erama Hil 16 Moz Au g Ve y <Q Moz. Au Mineralized belts b> 2 50 100 ) GREECE Olimpias 4 MozAu Gi x . Kilometres. y ar? \Stratoni %63mozag — O Active M

  7. Slide 7: Key Facts: Serbia

    TSXV:MUN Key Facts: Serbia (Source: CIA World Factbook) Area: 77,474 sq. km Population: 7,209,764 Currency: Serbian Dinar Official Language: Serbian Religions: Serbian Orthodox, Catholic, Protestant, Muslim Location: Crossroads of Central and Southeastern Europe Labour: Highly skilled and affordable

  8. Slide 8: Properties Adjacent to the Bor Underground Mine

    TSXV:MUN Properties adjacent to and surrounding the Bor underground mine Experienced local exploration team Interest from majors in this prolific mining camp Project Reserves / Resource Korkan (Au) 14.51 Mt @ 1.53 g/t Au Bigar Hill (Au) 25.48 Mt @ 1.63 g/t Au Kraku Pester (Au) 6.32 Mt @ 1.31 g/ t Au

  9. Slide 9: Bor Underground Mine (Cu-Au)

    TSXV:MUN Bor Underground Mine (Cu-Au) Production: • 1902-1941 12Mt @ 5.6% Cu, 2.6g/t Au • 1951-1984 87Mt @ 1.37% Cu • 1987-2001 51Mt @ 0.7% Cu, 0.2g/t Au Non-compliant Resources • 2.5 Bt containing 10.5 Mt Cu and 11.7 Moz Au Veliki Krivelj Mine (Cu-Au) • mining at 35,000t/day • 1987-2004: 137Mt @ 0.

  10. Slide 10: JOGMEC Partnership Properties

    JOGMEC PARTNERSHIP PROPERTIES 10

  11. Slide 11: Zeleznik Project Exploration Summary

    TSXV:MUN Target: Sediment-Hosted Gold, Porphyry Copper-Gold and Epithermal Gold deposits. Minerals: Gold, Copper, Silver, Tungsten, Molybdenum Location: 1.8 km north of Majdanpek open pit mine Systematic • Drilled 1,000m in six holes in Q4 2014 Exploration • Three drill holes from the West Zone to N

  12. Slide 12: Zeleznik — West Zone

    MUNDORO Zeleznik — West Zone TSXV:MUN Lithology Legend [ERD overs Pasi, Quarzte Bite ‘Au Soll Contour > 0.05 pom Cu Soll Contour > 600 ppm M iI Contour > 6 ppm Zn Soil Contour > 180 ppm Mundoro Capital Inc. — Zeleznik Project West Zone — Drilling Location Select Channel Sample Results ~ ZELCHO01: 42

  13. Slide 13: TSXV:MUN • Previously defined surface • Confirm the presence of a

    TSXV:MUN • Previously defined surface mineralization remains open at depth and along strike • Confirm the presence of a mineralized porphyry and related epithermal systems • Confirms presence of higher copper-gold grades • Drill program confirms open along strike and at depth www.mundoro.com

  14. Slide 14: Zeleznik — East Zone

    ‘Au Soil Contour » 0.05 ppm. (Cu Soll Contour » 600 ppm Mo Soil Contour > 6 ppm Zn Soil Contour > 180 ppm Rock Outcrop: 7.57g/t Au; 1.09% Cu Mundoro Capital Inc. Zeleznik Project East Zone Drilling Location a Select Drillhole Results ZELDD04:6m @ 0.75 CuEq (%) ZELDDO6: 4.9m @ 1.4 CuEq (%) 52m @ 0.31

  15. Slide 15: TSXV:MUN • Drilling returned high • 2.8m @ 2.98% CuEq in

    TSXV:MUN • Drilling returned high grade intersections • 2.8m @ 2.98% CuEq in massive sulphides from hole ZELDD05 • Hole ZELDD06 bottomed in 4.9m @ 1.40% CuEq www.mundoro.com

  16. Slide 16: Cukaru Peki and BJ-Dubrava Corridor

    TSXV:MUN RECENT DISCOVERY MUNDORO’S BJ-Dubrava Corridor 100 YEARS OF MINING ACTIVITY Cukaru Peki deposit hosts high grade is on trend & in between, Bor’s 100 Primary deposit types hosted copper and gold mineralization in drill years of operations and new within TMC: (1) Cu‐Au porphyries holes approx

  17. Slide 17: Dubrava Corridor

    TSXV: MUN Dubrava Corridor BJ-04: BJ-05: • 28 m @ 0.2% 1 m @ 1.69 g/t Au; Cu, 0.25 g/t Au 11 m @ 0.53 g/t (0.36% CuEq.) Au, • including 7m @ including 0.5% Cu, 0.69 1 m @ 1.24 g/t Au g/t Au (0.94% CuEq.) and 2m @ 1.05 g/t Au. Table 1: Summary of Results: Hole ID From (m) To (m) Length (m) Au (g/t) C

  18. Slide 18: Dubrava Corridor

    TSXV: MUN Dubrava Corridor 54m: Chpy, Bornite 366.2m; Chpy veinlets Silicification 370.1m: Cov veinlet 18

  19. Slide 19: 2016 JOGMEC Optioned Serbian Properties

    TSXV:MUN Q1 Q2 Q3 Q4 2016 JOGMEC OPTIONED SERBIAN PROPERTIES Announced Option with JOGMEC Geophysics Drilling Results www.mundoro.com

  20. Slide 20: Serbian Projects Available for Joint Venture

    Serbian Projects Available for Joint Venture 20

  21. Slide 21: Targets include

    TSXV:MUN Targets include: Skoursa – porphyry target Savinanc North – high sulphidation epithermal and porphyry target Tilva Rosh – High Sulphidation epithermal and porphyry target Markov Kamen – High Sulphidation and Porphyry target www.mundoro.com

  22. Slide 22: Porphyry Copper-Gold Project near Bor

    TSXV:MUN Target: Porphyry Copper-Gold deposits Minerals: Gold, copper, silver Location: 5km southwest of the Bor Mine Complex Systematic • Historical Data Compilation Exploration • Geophysics interpretation (Ground Mag) to New • Stream Sediment Sampling Discovery: • Geological mapping and rock sampl

  23. Slide 23: Savinac Epithermal Gold Project

    TSXV:MUN Target: High sulphidation & low sulphidation epithermal Au Minerals: Copper and Gold Location: 15km southwest of Bor Mine Complex Systematic • Historical data compilation Exploration • Geophysics interpretation (Ground Mag) to New • Geological mapping and rock sampling Discovery: • Stream s

  24. Slide 24: Savinac Conceptual Model and Results

    TSXV:MUN SAV-06: 4.4m @ 1.17 g/t (AuEq) & 0.74 % (CuEq) SAV-04: 9.1m @ 1.91 g/t (AuEq) & 1.21% (CuEq) (0.59 g/t Au, 0.21% Cu, 14.95 g/t Ag) (1.24 g/t Au, 0.33% Cu, 9 g/t Ag) SAV-05: 21.2 @ 0.28 g/t (AuEq) (0.25 g/t Au, 1.78 g/t Ag) SAV-01: 7m @ 8.68 g/t (AuEq) (7.9 g/t Au, 46.74 g/t Ag) Conceptual M

  25. Slide 25: Key Facts: Bulgaria

    TSXV:MUN Key Facts: Bulgaria (Source: CIA World Factbook) Area: 110,879 sq. km Population: 6,924,716 Currency: Bulgarian Lev Official Language: Bulgarian Religions: Eastern Orthodox, Muslim Location: Crossroads of Central and Southeastern Europe Labour: Highly skilled and affordable labour force Min

  26. Slide 26: Bulgaria Project

    TSXV:MUN • Underexplored region situated around an operating gold mine • More than 30 known poly-metallic (Pb-Zn-Cu- Au-Ag) deposits and occurrences in the area • Previous operators (Newmont) confirmed high grade gold in trench samples • Investment in an operating gold mine Target: Epithermal low su

  27. Slide 27: Investments in Bulgaria Gold Mine and Maoling

    TSXV:MUN Investment in Investment in Feasibility Stage Operating Gold Maoling Gold Project in China: Mine in Bulgaria  2005 Prefeasibility Study adjacent to NPV(0%) of $244mln @ Mundoro’s projects $400/oz gold price  MUN’s equity position of NPV worth $9 mln www.mundoro.com

  28. Slide 28: Management, Board of Directors, Technical Advisors

    TSXV:MUN MANAGEMENT BOARD OF DIRECTORS TECHNICAL ADVISORS Teo Dechev, MBA & PEng, CEO & President, Director John Hoey, Independent Director, Non-Executive Alan Riles, QP, Senior Metallurgist, Technical • 20 years experience focused on equity research and Chairman, Governance and Nominating Committee

  29. Slide 29: Cash in Treasury to Execute on Strategy; Partner Spending on Exploration

    TSXV:MUN CASH IN TREASURY TO EXECUTE ON STRATEGY PARTNER SPENDING ON EXPLORATION  $ STRATEGIC DISTRICT SCALE EXPERIENCED INVESTMENTS EXPLORATION PARTNERSHIP WITH PROJECT OPERATING JOGMEC IN SERBIA PACKAGE IN AND GOLD MINE + MINERAL-RICH CORPORATE DEVELOPMENT ADDITIONAL TETHYAN BELT TEAMS GOLD PROJE

  30. Slide 30: Background Information

    {.% MUNDORO Background Information 30

  31. Slide 31: Mining Jurisdictions Comparison

    TSXV:MUN SERBIA BULGARIA MEXICO ONTARIO PERU CHILE Location: Crossroads of Central and Southeastern Europe North America south of US Canada South America Mining History: Dating back to the Middle Ages Mining-friendly history that Mining Friendly since the Mining friendly history Dates back to the In

  32. Slide 32: Mundoro's Mexico Project Portfolio

    Mundoro’s Mexico Project Portfolio

  33. Slide 33: Key Facts: Mexico

    TSXV:MUN Location: North America between the United States and Belize Mining History: Mining-friendly history that spans almost 500 years Mining Law: 1993 Mining Law enabled companies to be established with 100% foreign investment Fraser Institute Index Rating: NAFTA: Mexico implemented North Americ

  34. Slide 34: Mexico Portfolio and Camargo

    TSXV:MUN • Recent discoveries such as Penasquito has seen many exciting new discoveries in the Mesa Central belt of Zacatecas-Durango- Chihuahua. • Mundoro has a portfolio covering 1,870 sq.km. over 8 properties all targeting potential Cu and Au deposits. CAMARGO Porphyry Geophysical Target Q1-2013

  35. Slide 35: Camargo Porphyry Geophysical Target

    TSXV:MUN • Magnetics feature classic Porphyry Cu-Au geophysical signature. • Ground geophysical surveys revealed the presence of a large scale, strong chargeability anomaly over the eastern flank of the magnetic high in the center bulls-eye magnetic anomaly. • Phase I drilling tested small portion o

  36. Slide 36: Hole CAM12-01 Silver Anomaly

    TSXV:MUN HOLE CAM12-01 intersected highly anomolous section at the bottom of the hole: From 393 to 394 m >300 g/t Ag 0.182 g/t Au From 402 to 405m 19.7 g/t Ag *The silver anomalies look to be controlled by faulting www.mundoro.com

  37. Slide 37: China Investment Maoling Gold Project, Liaoning China

    China Investment Maoling Gold Project, Liaoning China 37

  38. Slide 38: Maoling Gold Project, Liaoning China

    TSXV:MUN Maoling Gold Project, Liaoning China Among Largest, Development Stage Gold Deposits around the World Detour Lake - Canada Rosia Montana - Romania Fruta del Norte - Ecuador Hope Bay - Canada Resources • Mundoro holds 5% in MMI with balance held by Galore Creek - Canada Chinese SOE China Nati

  39. Slide 39: Maoling Pre-Feasibility Parameters and Sensitivity

    TSXV:MUN Parameters Sensitivity Analysis* Indicated Resources Pre- Pre-tax Pre-tax 120.0 Mt at 0.98 g/t = 3.8 M oz (0.50 g/t cut off) tax NPV @ 0% NPV @ 5% Probable Reserve 88.8 Mt at 0.99 g/t = 2.8 M oz Sensitivity IRR (US$ (US$ Metallurgical Recovery 93 % (%) millions) millions) Mill Years 1-2 7.3

Mundoro Capital — PDAC 2016 on 6ix