Niocorp Developments Ltd. · NASDAQ:NB

Niocorp Developments — Investor Presentation (2023)

46 slides from Niocorp Developments's investor presentation, 2023

  1. Slide 1: NioCorp: Critical minerals for U.S. supply chain security

    NioCorp: Critical minerals for U.S. supply chain security OUR MISSION: To accelerate the transition to a lower carbon economy by serving as a reliable U.S. supplier of sustainably produced critical minerals.

  2. Slide 2: Disclaimers & Technical Disclosures

    Disclaimers & Technical Disclosures Forward-Looking Statements This Presentation contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of applicable Canadian securities laws. For

  3. Slide 3: Disclaimers & Technical Disclosures

    Disclaimers & Technical Disclosures Financial Information; Non-GAAP Measures (continued from previous slide) In addition to the non-GAAP financial measures, this Presentation may contain financial forecasts and projections (collectively, “prospective financial information”) of NioCorp. Neither the i

  4. Slide 4: Our Mission: To Accelerate The Global Transition to Low-Carbon Economy

    OUR MISSION: To Accelerate The Global Transition to Low-Carbon Economy Our mission is to accelerate the Enabling global transition to a lower carbon The Energy Transition economy by serving as a reliable U.S. supplier of sustainably produced critical minerals.1 Sustainable Development “Our goal is t

  5. Slide 5: Value Proposition: Transition to Net Zero Driving Demand for Critical Minerals

    Value Proposition: Transition to Net Zero Emissions is Driving Demand Growth for the Critical Minerals at the Focus of NioCorp1 Shovel-ready1 pure-play critical minerals project with the highest-grade Niobium resource in North America and the Niobium 2nd largest indicated rare earth resource in the

  6. Slide 6: Recent Milestones Achieved

    Recent Milestones Achieved Financial ◉ Completed acquisition of GXII (>96% shareholder approval) ◉ Up-Listed to the Nasdaq (Ticker: NB), with cross-listing on the TSX ◉ Closed on two financings with Yorkville providing access to up to $71.9M net proceeds over next 3 years ◉ Received Letter of Intere

  7. Slide 7: Potential EXIM Loan for up to $800 Million

    Potential EXIM Loan for up to $800 Million ◉ After EXIM completed a preliminary review of NioCorp’s Elk Creek Project in March 2023, the Bank sent NioCorp a Letter of Interest for potential debt financing of up to $800 million.1 ◉ EXIM recently expanded its funding scope to include projects in the U

  8. Slide 8: Markets

    MARKETS 8

  9. Slide 9: Wider Adoption of these Critical Materials is Supply Constrained

    Wider Adoption of these Critical Materials is Supply Constrained Current Annual Niobium, Scandium, and Magnetic REE Oxide Production1 The Problem Magris Rio Tinto Estonia Russia Resources Lack of secure and reliable long-term supply is 3t 0.4kt 3t 7 kt preventing fulfilment of latent market demand a

  10. Slide 10: Reliable, Low-Risk U.S. Supply is Key to Securing Energy Transition

    Reliable, Low-Risk U.S. Supply is Key to Securing Energy Transition The Elk Creek Project is anticipated to be able to supply some of the world’s largest industries and sustainable technologies with Made-in-USA critical minerals produced The Solution in a low-impact, sustainable manner. Electrified

  11. Slide 11: Niobium: A Critical Supply Risk To The U.S.

    NIOBIUM: A Critical Supply Risk To The U.S. Niobium Global Niobium Demand Drivers ◉ 88% of the world’s Niobium is produced in only one country1 – Brazil – which increases supply chain risk and has forced the U.S. Government to stockpile Niobium. ◉ Market growth is expected to rise sharply with the e

  12. Slide 12: Scandium: Limited Supply But Very Large Latent Demand

    SCANDIUM: Limited Supply But Very Large Latent Demand Scandium Global Scandium Demand Drivers ◉ Forecast demand (117 tpy by 2026) greatly exceeds current supply (25 tonnes/year)1 and exceeds NioCorp’s potential annual scandium production. § Solid oxide fuel cell use of Scandium (⋍22 tpy) forecast to

  13. Slide 13: Magnetic Rare Earths: Global Demand to Grow 3X by 2035

    MAGNETIC RARE EARTHS: Global Demand to Grow 3X by 20351 Magnetic Rare Earth Elements Global Magnetic REE Demand Drivers ◉ NioCorp is currently conducting technical and economic analyses on the potential addition to its planned product suite of three magnetic rare earth oxides: NdPr, Dy, and Tb. ◉ Gl

  14. Slide 14: U.S. Government: The Products NioCorp Intends to Produce Are Critical

    U.S. Government: The Products That NioCorp Intends to Produce1 Are Critical ◉ All of NioCorp’s planned products have been singled out as “critical minerals” by the U.S. Government. ◉ The products NioCorp intends to focus on – including potentially rare earths2 – include the top 3 most critical miner

  15. Slide 15: The Asset

    Critical Mineral Security

  16. Slide 16: A Shovel-Ready Pure-Play Critical Minerals Project

    A Shovel-Ready1 Pure-Play Critical Minerals Project and the Second-Largest Indicated Rare Earth Resource in the U.S.2 Critical $2.8B NPV Not Long-Life Asset Sustainable Owned and Significant State Minerals & Rare Including Rare with Offtake Development & Permitted for and Local Earths3 Earth Potenti

  17. Slide 17: Critical Minerals in the Elk Creek Resource

    Critical Minerals in the Elk Creek Resource1 Critical Minerals Magnetic Rare Earths Scandium Titanium Neodymium- Dysprosium Terbium Ferroniobium Praseodymium Oxide Dioxide Oxide2 Oxide2 Oxide2 970,300 11,337 4,221,000 125,800 9,100 2,300 tonnes tonnes tonnes tonnes tonnes tonnes No production No pro

  18. Slide 18: Offtake Agreements for Products NioCorp Intends to Produce

    Offtake Agreements for Products NioCorp Intends to Produce1 Niobium Scandium Rare Earths5 75% ~12% of NioCorp’s planned Ferroniobium of NioCorp’s planned production already contracted for the first production already contracted 10 years of operation for the first 10 years of operation ThyssenKrupp M

  19. Slide 19: Progression to a Highly De-Risked Critical Minerals Project

    Progression to a Highly De-Risked Critical Minerals Project 1986: 2022: Molycorp halts 2021: NioCorp issues exploration and NioCorp updated NI 43- The Elk Creek 1970: 1973: calculates an 2014: 2018: acquires key 101-compliant Resource1 Discovery of a Molycorp initial resource; ThyssenKrupp Traxys N.

  20. Slide 20: World Class Development Partners

    World Class Development Partners Surface Processing Facilities EPC Mine Development EPC Geology Mineral Resource Process Development Project Permitting Mineral Reserve NioCorp’s global team includes some of the world’s best in their fields. 20

  21. Slide 21: Elk Creek Positioned to Become America's Second Major Rare Earth Project

    Elk Creek Positioned to Become America’s Second Major Rare Earth Project1 1 Mountain Pass: 2 Elk Creek: Second Largest largest indicated indicated rare earth rare earth resource in resource in the U.S. the U.S.2 MP Materials’ Mountain Pass Rare Earth Mine & NioCorp’s Elk Creek Critical Minerals Proj

  22. Slide 22: The Elk Creek Project

    THE ELK CREEK PROJECT 22

  23. Slide 23: Elk Creek Project Location & Layout

    Elk Creek Project Location & Layout The Elk Creek Project is centered within one 640-acre section of all private land. Highway 62 Substation Salt Pyro Cell 1 W T Acid Hydromet P Tailings 2 Tailings 1 Mineral Pond HCl Processing Dry Highway 50 Pond Fill Tailings 3 Production Waste Backfill Vent Ore B

  24. Slide 24: Mineral Reserves and Mineral Resources

    Mineral Reserves and Mineral Resources1 Carbonatite Initial Operational Boundary Footprint (~7,800 (640 acres) acres) Mineral Resource and Reserves1 Mineral Cut-off Tonnage Grade Grade Grade Grade Resource NSR (000’s Mt) (Nb2O5%) (TiO2%) (Sc g/t) (TREO%) Highway 62 Classification (US$/t) Highway 50

  25. Slide 25: Key Permits Obtained

    Key Permits Obtained The Elk Creek Project has secured key federal, state, and local permits required to proceed to the start of construction once project financing is obtained. ◉ Construction Air Permit secured from the State of Nebraska. ◉ A Special Use Permit secured from Johnson County, Nebraska

  26. Slide 26: Major Elk Creek Project Milestones Ahead

    Major Elk Creek Project Milestones Ahead Exercise Completion of option-to- Demonstration purchase Conduct Plant testing of agreements detailed optimized flow for engineering Begin sheet and rare additional necessary for sinking Complete earth recovery land launch of shafts into project Plant rates p

  27. Slide 27: Elk Creek Project Advancement: Next Steps

    Elk Creek Project Advancement: Next Steps Various levels of funding can advance the project to create additional value and move the project closer to the commencement of mine and surface construction.1 Examples of Uses of Funds at Various Levels (USD millions) (for illustrative purposes only) Uses o

  28. Slide 28: Strong State & Local Support

    Strong State & Local Support The Elk Creek Project is located exclusively on Estimated Economic Benefits and New Tax Revenue 1 private land with extensive nearby infrastructure Generated by the Elk Creek Project 4 (roads, rail, water, and utilities). Direct Full-Time, Permanent Jobs Created ~450 The

  29. Slide 29: ESG

    ESG 29

  30. Slide 30: Expected Mining Operations Designed with Sustainability in Mind

    NioCorp’s Expected Mining Operations Designed from the Start with Sustainability in Mind ◉ Fully aligned with Equator Principles ◉ Zero process water discharge facility ◉ Additional protection of groundwater resources through artificial ground freezing and grouting ◉ Avoidance of permanent impacts t

  31. Slide 31: Elk Creek's Expected Output Can Create 5.7-to-1 GHG Reductions

    Elk Creek’s Expected Output Can Create Significant 5.7-to-1 GHG Reductions1 Use of NioCorp’s planned products in applications such as electric vehicles and commercial aviation could help avoid greenhouse gas emissions because of the higher efficiency these technologies can achieve with critical mine

  32. Slide 32: Elk Creek Feasibility Study Highlights

    Elk Creek Feasibility Study1 Highlights (not including REE production) $2.8B 29.2% $2.35B 27.6% $403M Pre-Tax NPV Pre-Tax IRR After-Tax NPV After-Tax IRR Averaged Annual EBITDA2 over Run of Mine3 68% $21.9B $10.9B $1.14B 38 Yrs. Averaged Annual Gross Revenue After-Tax Cumulative Total Net Up- Mine L

  33. Slide 33: Elk Creek Project Expected to Deliver Significant Cash Flow Over 38-Year Life

    Elk Creek Project Expected to Deliver Significant Cash Flow Over 38-Year Life Elk Creek Project Metrics Summary1 2022 Elk Creek Feasibility Study Economic Results Elk Creek Project After-Tax Metrics $500 6,000 (not including REE production) (US$ Millions) $400 Pre-Tax Net Present Value (NPV) (8% dis

  34. Slide 34: Management Team

    Management Team Mark A. Smith, P.E. Scott Honan, MSc, SME-RM Neal Shah, BSME, MBA Jim Sims Executive Chairman, President and Chief Operating Officer, NioCorp Chief Financial Officer & Chief Communications Chief Executive Officer President, Elk Creek Resources Corp. Corporate Secretary Officer Mr. Sm

  35. Slide 35: Board of Directors (slide 1 of 2)

    Board of Directors (slide 1 of 2) Mark A. Smith, P.E. Nilsa Guerrero-Mahon Michael J. Morris Fernanda Fenga David C. Beling, P.E. Executive Chairman, Audit Committee Chair Lead Director President and CEO Mr. Smith has over 40 years of experience in A former CFO and Controller for global Mr. Morris w

  36. Slide 36: Board of Directors (slide 2 of 2)

    Board of Directors (slide 2 of 2) Anna Castner Wightman Peter Oliver Dean C. Kehler Michael G. Maselli A sixth generation Nebraskan and a With a background in chemistry, Mr. Oliver Mr. Kehler is Managing Partner of Trimaran, Mr. Maselli is a Managing Director of graduate of Nebraska Wesleyan began w

  37. Slide 37: Investment Highlights

    Investment Highlights Potential pure play exposure to critical mineral mega trends1 Low Carbon Economy Significant, rapidly growing total available markets Unique competitive position with large barriers to entry Defense and Aerospace Key customer relationships and offtake agreements Mega- Governmen

  38. Slide 38: Appendix

    APPENDIX 38

  39. Slide 39: Elk Creek NI 43-101 Mineral Resource

    Elk Creek NI 43-101 Mineral Resource1 (MINERAL RESOURCE AS OF DECEMBER 8, 2021) Notes: a. The reporting standard for the Mineral Resource Estimate uses the terminology, definitions Elk Creek 2022 In Situ Mineral Resource Estimate (niobium, titanium, and scandium) including reserves and guidelines gi

  40. Slide 40: Elk Creek NI 43-101 REE Mineral Resource

    Elk Creek NI 43-101 REE Mineral Resource1 (MINERAL RESOURCE AS OF DECEMBER 8, 2021) Notes: Elk Creek 2022 In Situ Mineral Resource Estimate (rare earth oxides) including reserves a. The reporting standard for the Mineral Resource Estimate uses the terminology, definitions and guidelines given in the

  41. Slide 41: Elk Creek S-K 1300 Mineral Resource

    Elk Creek S-K 1300 Mineral Resource1 (MINERAL RESOURCE AS OF June 30, 2022) Notes: Elk Creek 2022 In Situ Mineral Resource Estimate (niobium, titanium, and scandium) excluding reserves a. Classification of Mineral Resources in the above tables is in accordance with the S-K 1300 classification system

  42. Slide 42: Elk Creek S-K 1300 REE Mineral Resource

    Elk Creek S-K 1300 REE Mineral Resource1 (MINERAL RESOURCE AS OF JUNE 30, 2022) Elk Creek 2022 In Situ Mineral Resource Estimate (rare earth oxides) excluding reserves Notes: a. Classification of Mineral Resources in the above tables is in accordance with the S-K 1300 classification Class NSR Cut-of

  43. Slide 43: Elk Creek S-K 1300 Mineral Reserve

    Elk Creek S-K 1300 Mineral Reserve1 (not including REE production) (MINERAL RESERVE AS OF May 10, 2022) Parameter Value Unit Underground In Situ Mineral Reserves Estimate for Elk Creek Mining Cost 42.38 US$/t mined Nb2O5 TiO2 Processing 106.70 US$/t mined Tonnage Contained Payable Nb Contained Payab

  44. Slide 44: Elk Creek S-K 1300 Mineral Reserve

    Elk Creek S-K 1300 Mineral Reserve1 (not including REE production) (MINERAL RESERVE AS OF June 30, 2022) Parameter Value Unit Underground In Situ Mineral Reserves Estimate for Elk Creek Mining Cost 42.38 US$/t mined Processing 106.70 US$/t mined Nb2O5 Payable TiO2 Sc Tonnage Contained Contained Paya

  45. Slide 45: Feasibility Study: Indicated Economic Results

    Feasibility Study: Indicated Economic Results1 Operating Year 1 2 3 4 5 6 7 8 9 10 20 30 Production Niobium t-Nb 4,960 4,742 4,949 4,903 4,949 4,716 4,715 4,733 4,799 4,672 4,772 4,773 Scandium kg-Sc2O3 116 114 113 109 112 109 105 102 101 101 102 107 Titanium t-TiO2 13,063 12,120 12,747 12,605 12,60

  46. Slide 46: Contact: For More Information

    For More Information NioCorp Jim Sims Chief Communications Officer jim.sims@niocorp.com +1 (303) 503-6203 CONTACT 46

NioCorp Developments — Investor Presentation (2023) on 6ix