  1. Slide 1: Hamilton Works Community Liaison Committee Meeting Q4 2020

    Hamilton Works Community Liaison Committee Meeting Q4 2020 January 2021

  2. Slide 2: Agenda

    Agenda 1. Introductions 2. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 3. Action Items 4. Seasonal Fugitive Dust Management 5. Community Feedback 6. Next Meeting 7. Adjournment

  3. Slide 3: Site-Specific Standard Order (Particulates): Performance Review – Daily

    Site-Specific Standard Order (Particulates): Performance Review – Daily Date Doors Lids Off-takes (% Leaks) (% Leaks) (% Leaks) 2015 Thresholds 54% 2% NA (July 2 start) 2016 Thresholds 32% 2% NA 2017-2019 Thresholds 10% 2% 5% 2020 Thresholds 5% 1% 4% Oct – Dec Range 0 – 4.23% 0 – 1.00% 0 – 1.28% (Av

  4. Slide 4: Performance Review – 30 Day Rolling Averages

    Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages Date Doors Lids Off-takes Charging (% Leaks) (% Leaks) (% Leaks) (sec) (log avg) 2015 Limits 38% 0.8% 25% 12 sec (July 2 start) 2016 Limits 22.5% 0.8% 15% 12 s 2017-2019 Limits 7% 0.8% 4.2% 12 s 2020 Limits 4%

  5. Slide 5: Performance Review – Daily Observations – Pushing Emissions

    Site-Specific Standard Order (Particulates): Performance Review – Daily Observations – Pushing Emissions Date Pushing Emission (opacity %) 2015 Limit (July 2 start) ≥ 50% 2016 – 2018 ≥ 50% 2019 ≥ 40% 2020 ≥ 30% Oct – Dec Range 0 – 30.00% (Average) (6.31%) Oct – Dec Operational Adjustments (1 exceeda

  6. Slide 6: Performance Review – Additional Items

    Site-Specific Standard Order (Particulates): Performance Review – Additional Items • Community Complaint: o None in Q4 • MECP to provide verba l com m ents

  7. Slide 7: Action Item: 30-day Rolling Average - Doors

    Action Item: 30 -day Rolling Average - Doors 40 35 30 25 Leak Percent 20 15 10 5 0 8/7/2015 2/7/2016 8/7/2016 2/7/2017 8/7/2017 2/7/2018 8/7/2018 2/7/2019 8/7/2019 2/7/2020 8/7/2020 Date Results Limit

  8. Slide 8: Action Item: 30-day Rolling Average - Lids

    Action Item: 30 -day Rolling Average - Lids 0.9 0.8 0.7 0.6 Percent Leak 0.5 0.4 0.3 0.2 0.1 0 8/7/2015 2/7/2016 8/7/2016 2/7/2017 8/7/2017 2/7/2018 8/7/2018 2/7/2019 8/7/2019 2/7/2020 8/7/2020 Date Results Limit

  9. Slide 9: Action Item: 30-day Rolling Average - Offtakes

    Action Item: 30 -day Rolling Average - Offtakes 30 25 20 Percent Leak 15 10 5 0 8/7/2015 2/7/2016 8/7/2016 2/7/2017 8/7/2017 2/7/2018 8/7/2018 2/7/2019 8/7/2019 2/7/2020 8/7/2020 Date Results Limit

  10. Slide 10: Seasonal Fugitive Dust Management

    Seasonal Fugitive Dust Management Background • Due to the seasonal changes in weather and storage requirements for raw materials, Stelco’s fugitive dust management needs to change as well. Summer • Paved Roads – water flushing, vacuuming • Unpaved Roads – oiled; repeat oiling when required • Coal pi

  11. Slide 11: Seasonal Fugitive Dust Management (2)

    Seasonal Fugitive Dust Management (2) Winter • Paved Roads – snow removal, vacuuming when feasible • Coal piles – water dust control discontinued; inventory of coal is moved into storage piles that are oriented in the direction of the prevailing winds; storage piles sealed with a sealant; wind fence

  12. Slide 12: Community Feedback

    Community Feedback STELCO (stexco]

  13. Slide 13: Next Meetings

    Next Meetings • Wed. April. 28, 2021 • Wed. July 28, 2021 • Wed. Oct. 27, 2021