  1. Slide 1: TVA Kingston Ash Recovery Project Regulatory Overview

    TVA Kingston Ash Recovery Project Regulatory Overview Craig Zeller, P.E. U.S. EPA Region 4 November 8, 2010

  2. Slide 2: Dredge Cell Area Pre-Spill

    Dredge Cell Area Pre-Spill Main Ash Collection Pond Initial Ash Cell

  3. Slide 3: Spill Progression

    Spill Progression FILLS IN SWAN POND SLOUGH EMPTIES INTO EMORY RIVER FILLS IN MAIN CHANNEL BERKSHIRE SLOUGH

  4. Slide 4: Dredge Cell Area Post-Spill

    Dredge Cell Area Post-Spill

  5. Slide 5: Root Cause Analysis

    Root Cause Analysis Kingston Dredge Cell Failure Conditions Increased Loads Due to Higher Fill Hydraulically Placed KIF Failure J Loose Wet Ash Fill Geometry & yy’ Setbacks Unusually Weak Silt/Ash Slime Foundation

  6. Slide 6: Examples of Inorganic Concentrations in Coal Ash

    Examples of Inorganic Concentrations in Coal Ash (Ash) Element Avg. ppm Est. lbs. Uses an est. Aluminum 22,700 177 million of 3 million Iron 17,961 140 million CYS of coal ash. Copper 59 462,000 Arsenic 66 515,000 Selenium 6 51,000 Examples of Inorganic Concentrations in Soil (Soil) Element Avg. ppm

  7. Slide 7: Ash Thickness in Rivers

    Ash Thickness in Rivers Biggest chunk was 30 feet deep over a mile long in the Emory River

  8. Slide 8: Ash Recovery Project Layout

    Ash Recovery Project Layout Non-Time Critical Time Critical

  9. Slide 9: Removal Action Strategy

    Removal Action Strategy • Phase 1 (Time‐Critical Action Removal) – 3.5 million cys removed (excavated and dredged) – 3.8 million tons disposed at Perry County, AL (continue thru Dec. 2010) – May 29, 2010 Emory River reopened • Phase 2 (Non‐Time Critical Action Removal) – 2.8 million cys to be remove

  10. Slide 10: No Liner or Leachate Collection

    No Liner or Leachate Collection • Groundwater Flow to Site ‐ Silty clay layer beneath site acts as barrier to metal migration ‐ Groundwater does not migrate to drinking water wells, moves downgradient to river ‐ New perimeter dike will reduce lateral groundwater movement ‐ Clay and soil cover will r

  11. Slide 11: No Liner or Leachate Collection

    No Liner or Leachate Collection • No Metals Leaching – After over 50 years of groundwater in contact with ash, water quality does not currently exceed drinking water standards – EPA Science Panel and USACE/ERDC studies after spill conclude metals not readily leaching off ash under site‐specific cond

  12. Slide 12: No Liner or Leachate Collection

    No Liner or Leachate Collection • No Groundwater Plume – Semiannual monitoring over past 10 years – 2 of 40 samples since release in ballfield exceeded arsenic levels – No arsenic exceedances in past 7 months Downgradient Wells

  13. Slide 13: Dike Construction Before Failure

    Dike Construction Before Failure

  14. Slide 14: New Perimeter Dike

    New Perimeter Dike LANDFILLED ASH EARTHEN BERM FOUNDATION IMPROVEMENTS WORKING PLATFORM SANDY SILT TO SILTY SAND HYDRAULICALLY PLACED ASH LOPE PROTECTION

  15. Slide 15: Aerial View of Impoundment

    Aerial View of Impoundment CHURCH SLOUGH BERKSHIRE SLOUGH (WEST EMBAYMENT) (NORTH EMBAYMENT) SWAN POND ROAD PLANT INTAKE CHANNEL CLOSED DREDGE CELL SWAN POND CIRCLE ROAD CLOSED ASH POND DIKE C EMORY RIVER STILLING POND

  16. Slide 16: Phase 3 River System Sampling & Analysis Plan

    Phase 3 River System Sampling & Analysis Plan • Presentations to Follow: – Dennis Callaghan, Environmental Standards – Data Management – Steve Scott, US Army COE/ERDC – Ash Fate & Transport Modeling – Mark Chappell, US Army COE/ERDC – Geochemical Investigations – Mark Greeley, ORNL – Fish Reproducti

  17. Slide 17: Questions?

    QUESTIONS?