Compagnie De Saint-gobain Sa · EURONEXT:SGO

Compagnie De Saint-gobain Sa — Investor Presentation (2025)

42 slides from Compagnie De Saint-gobain Sa's investor presentation, 2025

  1. Slide 1: Macallan - Saint-Gobain Student Contest 2025

    MACALLAN SAINT-GOBAIN STUDENT CONTEST 2025 MIGUEL HERRERO IKER DÍAZ MARCOS HERNÁNDEZ SPAIN ETSA VALLADOLID

  2. Slide 2: ETSA Valladolid Spain

    14 SPAIN ETSA VALLADOLID MIGUEL HERRERO SUGASAGA IKER DÍAZ GONZÁLEZ MARCOS HERNÁNDEZ SANTOS

  3. Slide 3: Site Analysis, Project Details, Bioclimatic Strategies & Technics

    1- SITE ANALYSIS 2- PROJECT DETAILS 3- BIOCLIMATIC STRATEGIES & TECHNICS

  4. Slide 4: 1 | Site Analysis

    VILLEFONTAINE CHIMILIN 1| SITE ANALYSIS

  5. Slide 5: Building A Situation - New Construction

    BUILDING A SITUATION NEW CONSTRUCTION VILLEFONTAINE, LYON NNW N NNE NW NE 1000 < 2 km/ h 2 - 5 km/ h WNW ENE 500 5 - 10 km/ h 10 - 20 km/ h 0 W E 20 - 30 km/ h 30 - 40 km/ h WSW ESE 40 - 50 km/ h SW SE SSW SSE S Located in Villafontaine, next to Les 30 días Grands Ateliers, this building is an 25 dí

  6. Slide 6: Building B Situation - Rehabilitation

    BUILDING B SITUATION REHABILITATION CHIMILIN, LYON 30 días 25 días 20 días 15 días 10 días 5 días 0 días Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic 2 - 5 km/ h 5 - 10 km/ h 10 - 20 km/ h 20 - 30 km/ h 30 - 40 km/ h 40 - 50 km/ h 40 °C 125 mm 30 °C 100 mm 2 7 °C 2 7 °C 2 5 °C 2 2 °C 2 0 °C 20 °C

  7. Slide 7: 2 | Project Details

    2 | PROJECT DETAILS

  8. Slide 8: Building A | New Construction

    BUILDING A | NEW CONSTRUCTION

  9. Slide 9: Building A Concepts - New Construction

    BUILDING A CONCEPTS NEW CONSTRUCTION COMMUNICATION CORES OPENINGS PROTOTYPE VILLAGE COMMUNICATION CORES OPENINGS PROTOTYPE VILLAGE TRANSLUCENT SKIN TRANSLUCENT SKIN INTERPLAY OF SOLIDS AND VOIDS TRANSLUCENT SKIN ATRIUM AS A SPACE ORGANIZER 9

  10. Slide 10: Building A Concepts - New Construction

    BUILDING A CONCEPTS NEW CONSTRUCTION COMMUNICATION CORES OPENINGS PROTOTYPE VILLAGE PROTOTYPE VILLAGE PROTOTYPE VILLAGE FACADE DIFFERENTIATION BY ORIENTATION OPENINGS 10 TRANSLUCENT SKIN

  11. Slide 11: Building A Axonometric View

    BUILDING A AXONOMETRIC VIEW NEW CONSTRUCTION 11

  12. Slide 12: Building A Floor Plans | Ground Floor

    BUILDING A FLOOR PLANS | GROUND FLOOR NEW CONSTRUCTION ACCOMMODATION 1. Accessible single bedroom 2. Eight people bedroom 3. Six people bedroom 4. Single bedroom 5. Double bedroom 6. Bathroom 9. 17. 10. CO-CREATION LABORATORY 7. Office space 8. Mul�-use room 9. Laboratory 10. Prototype area 11. Mee�

  13. Slide 13: Building A Floor Plans | First Floor

    BUILDING A FLOOR PLANS | FIRST FLOOR NEW CONSTRUCTION ACCOMMODATION 8. 1. Accessible single bedroom 2. Eight people bedroom 11. 3. Six people bedroom 11. 4. Single bedroom 5. Double bedroom 6. Bathroom 7. 7. CO-CREATION LABORATORY 7. Office space 8. Mul�-use room 9. Laboratory 10. Prototype area 11.

  14. Slide 14: Building A Floor Plans | Second Floor

    BUILDING A FLOORS PLANS | SECOND FLOOR NEW CONSTRUCTION ACCOMMODATION 6. 13. 6. 1. Accessible single bedroom 2. Eight people bedroom 3. Six people bedroom 1. 1. 4. Single bedroom 5. Double bedroom 6. Bathroom 3. 3. 4. 4. 2. 2. CO-CREATION LABORATORY 7. Office space 8. Mul�-use room 3. 3. 9. Laborato

  15. Slide 15: Building A Sections

    BUILDING A SECTIONS NEW CONSTRUCTION 15

  16. Slide 16: Building A Views

    BUILDING A VIEWS NEW CONSTRUCTION 16

  17. Slide 17: Building A Rooms

    BUILDING A ROOMS NEW CONSTRUCTION The housing units are arranged around a common corridor. Inside, collec�ve rooms are proposed without compromising private space, allowing residents to have their own workspace and living area. 17

  18. Slide 18: Building B | Rehabilitation

    Zz iS) KR = = ca <x a Lu ac BUILDING B |

  19. Slide 19: Building B Concepts - Rehabilitation

    BUILDING B CONCEPTS REHABILITATION OPENINGS PROTOTYPE VILLAGE TRANSLUCENT SKIN TRANSLUCENT SKIN NEW SPACES EXISTING BUILDING ENCLOSURE 19

  20. Slide 20: Building B Axonometric View

    BUILDING B AXONOMETRIC VIEW REHABILITATION 20

  21. Slide 21: Building B Floor Plans | Ground Floor

    BUILDING B FLOOR PLANS | GROUND FLOOR REHABILITATION 21

  22. Slide 22: Building B Floor Plans | First Floor

    BUILDING B FLOOR PLANS | FIRST FLOOR REHABILITATION 22

  23. Slide 23: Building B Views - Rehabilitation

    BUILDING B VIEWS REHABILITATION By covering the exis�ng building in Chimilin, we create a series of new transi�on spaces between the interior and exterior. Similarly, we make the roof accessible for use, crea�ng new social spaces. This new system could func�on independently from the building’s inter

  24. Slide 24: Building B Sections - Rehabilitation

    BUILDING B SECTIONS REHABILITATION By covering the exis�ng building in Chimilin, we create a series of new transi�on spaces between the interior and exterior. Similarly, we make the roof accessible for use, crea�ng new social spaces. This new system could func�on independently from the building’s in

  25. Slide 25: Building B Sections - Rehabilitation

    BUILDING B SECTIONS REHABILITATION The Chimillin building uses the same translucent second skin system as the Villafontaine building. This system ensures that both buildings share a similar bioclima�c approach. 25

  26. Slide 26: 3 | Bioclimatic Strategies & Technics

    3 | BIOCLIMATIC STRATEGIES & TECHNICS

  27. Slide 27: CO2 Cycle

    CO2 CYCLE 3 | BIOCLIMATIC STRATEGIES Sustainable forest <CO2 CO2 <CO2 CO2 CO2 secuestration Timber stores CO2 through forests CO2 Local economies Last life, Biomass CO2 Recycle CO2 CO2 CO2 CO2 CO2 Km 0 resources Km 0 resources 27

  28. Slide 28: Natural Heating/Cooling | Winter

    NATURAL HEATING/COOLING | WINTER 3 | BIOCLIMATIC STRATEGIES In winter, the translucent skin allows solar radia�on to pass through, passively hea�ng the building like a Trombe wall. 28

  29. Slide 29: Natural Heating/Cooling | Summer

    NATURAL HEATING/COOLING | SUMMER 3 | BIOCLIMATIC STRATEGIES In summer, the atrium acts like a solar chimney, cooling the building. 29

  30. Slide 30: Canadian Well | Winter

    CANADIAN WELL | WINTER 3 | BIOCLIMATIC STRATEGIES 9 ºC 15 ºC The building op�mizes thermal comfort and efficiency with a Canadian well, which naturally regulates air temperature. 30

  31. Slide 31: Canadian Well | Summer

    CANADIAN WELL | SUMMER 3 | BIOCLIMATIC STRATEGIES 23 ºC 15 ºC The building op�mizes thermal comfort and efficiency with a Canadian well, which naturally regulates air temperature. 31

  32. Slide 32: Natural Lighting

    NATURAL LIGHTING 3 | BIOCLIMATIC STRATEGIES The translucent roof harnesses sunlight and adjusts its opacity for be�er light control. 32

  33. Slide 33: Thermal Mass Slab

    THERMAL MASS SLAB 3 | BIOCLIMATIC STRATEGIES SUMMER WINTER 33

  34. Slide 34: Rainwater Recycling

    RAINWATER RECYCLING 3 | BIOCLIMATIC STRATEGIES 34

  35. Slide 35: Sun Control

    SUN CONTROL 3 | BIOCLIMATIC STRATEGIES 35

  36. Slide 36: Renewable Energies

    RENEWABLE ENERGIES 3 | BIOCLIMATIC STRATEGIES BIOMASS PHYTOREMEDIATION WIND SOLAR 36

  37. Slide 37: Renewable Energies - Biomass

    RENEWABLE ENERGIES 3 | BIOCLIMATIC STRATEGIES BIOMASS The biomass used comes from wood waste from Les Grands Ateliers, transformed into energy. This system reduces material waste and improves the building's thermal efficiency, ensuring a more sustainable opera�on PHYTOREMEDIATION WIND SOLAR 37

  38. Slide 38: Renewable Energies - Phytoremediation

    RENEWABLE ENERGIES 3 | BIOCLIMATIC STRATEGIES BIOMASS PHYTOREMEDIATION Grey water is treated in ponds through phytoremedia�on, where plants and microorganisms naturally filter and degrade contaminants. This improves water quality, allowing for its reuse or discharge with no significant environmental

  39. Slide 39: Renewable Energies - Wind

    RENEWABLE ENERGIES 3 | BIOCLIMATIC STRATEGIES BIOMASS PHYTOREMEDIATION WIND A series of wind turbines have been installed along the access road to the building, with the purpose of capturing wind energy and STORING it for use in future energy demands. SOLAR 39

  40. Slide 40: Renewable Energies - Solar

    RENEWABLE ENERGIES 3 | BIOCLIMATIC STRATEGIES BIOMASS PHYTOREMEDIATION WIND SOLAR Solar capture is op�mized with south- facing photovoltaic panels, integrated into the building to generate shade and reduce hea�ng. Addi�onally, panels are distributed across the plot to maximize energy collec�on, whic

  41. Slide 41: Construction & Technical Approach

    9º NAME: LYON 80 21º LOCATION: FRA 60 WEEKDAYS: 00:00 - 24:00 Hrs WINTER WINTER WEEKENDS: THERMAL MASS SLAB00:00 - 24:00 Hrs WINTER SOUTH FACADE 40 WES RAINWATER RECYCLING 15º POSITION: 45.7°, 5.1° 20 © Weather Tool 0 CONSTRUCTION & TECHNICAL APPROACH % THERMAL MASS EFFECTS Before After % PASSIVE SO

  42. Slide 42: Construction & Technical Approach

    CONSTRUCTION & TECHNICAL APPROACH 3 | TECHNICAL APPROACH Monthly energy output from fix-angle PV system: 2.PLACO® RAIL PLANET FUTURE 70 3.RIGITONE® EDGE 12/25 Q Ac�v'Air® 5.PLACO® BA 15 1200 1 7.PLACO® PPM 15 1200 8.PLACO® STUD PLANET FUTURE 70 2 3 4 5 6 7 1.ACUTEX,HIGH�DENSITY RIGID MINERAL WOOL PA

Compagnie De Saint-gobain — Investor Presentation (2025) on 6ix