Griffin Mining Limited · LSE:GFM

Griffin Mining — Investor Presentation (2003)

24 slides from Griffin Mining's investor presentation, Jul 31, 2003

  1. Slide 1: Griffin Mining

    GRIFFIN MINING

  2. Slide 2: Corporate Overview

    CORPORATE OVERVIEW • London Stock Exchange AIM quoted company • Capital Structure – 103m shares trading at 13p per share with market capitalisation of £13.3m – 10m options at various strike prices up to 20p per share • Cash and tradeable securities of $1.75m • Management team with mining, emerging m

  3. Slide 3: Caijiaying Site - Winter

    CATJTAYING CAIJIAYING SITE - WINTER

  4. Slide 4: Project Area

    PROJECT AREA • Located 200km north west of Beijing accessible via freeway and sealed road • JV Company issued first Exploration Licence under new 1997 Chinese Mining Law in October 1998 • Exploration Licence over 102 sq. km surrounding original licence area granted in June 2000 • JV Company issued f

  5. Slide 5: Regional Geology & Zones of Known Mineralization

    REGIONAL GEOLOGY & ZONES OF KNOWN MINERALIZATION

  6. Slide 6: JORC Code Zone III Resource Statement

    JORC CODE ZONE III RESOURCE STATEMENT • Zinc: Indicated & Inferred Resource – 23.6 m/t @ 8.08 % Zn at a 4% cut off – 10.56 m/t @ 11.63 % Zn at a 7% cut off • Gold – 2.61 m/t @ 6.78 g/t Au at a 3 g/t cut off – 1.675 m/t @ 8.63 g/t Au at a 4 g/t cut off – 1.265 m/t @ 10 g/t Au at a 5% cut off • 1,230,

  7. Slide 7: Caijiaying Long Section

    CAIJIAYING CAIJIAYING LONG SECTION 90 40008 Section 5110E 38-8000 49 400m Section SO00E —- REFERENCE n Ore Blocks (46 GRIFFIN MINING LTD Caijiaying Deposit Fig. 3 Combined Section 5000E and 5110E Showing 4% Zn Ore Outlines with Present and Planned Development

  8. Slide 8: Project Strengths

    PROJECT STRENGTHS • Underground mining operation selected due to low capital cost, long life, high profitability and high rate of return • Metallurgically simple • Connected to grid power, large water resources and gentle terrain • Substantial tax benefits – 0% in years 1 & 2 – 10% in years 3 to 5 –

  9. Slide 9: Caijiaying Zinc Mine – General Arrangement

    CAIJIAYING ZINC MINE – GENERAL ARRANGEMENT

  10. Slide 10: Caijiaying Zinc Mine – Preliminary Site Layout

    CAIJIAYING ZINC MINE – PRELIMINARY SITE LAYOUT

  11. Slide 11: Production & Operating Costs

    PRODUCTION & OPERATING COSTS • Ore processed per annum 200,000 tonnes • To produce 22,000 tonnes of zinc metal • Lowest quartile operating costs at $602 per tonne of zinc produced – Smelter charges per tonne of concentrate $150 – Mining costs per tonne of ore processed $12 – Milling costs per tonne

  12. Slide 12: Major Chinese Zinc Producers

    MAJOR CHINESE ZINC PRODUCERS RANK PRODUCERS PRODUCTION, ‘1000 METAL CONTENT 1 Nonfemet 94,882 2 Huizhe Lead & Zinc Mine 74,720 3 Baiying Nonferrous 61,866 4 China Tin Group 67,295 5 Nanping Nonferrous 60,447 6 Longquan 32,239 7 Wenshandulong Tin Mine 32,130 8 Huidong Lead & Zinc Mine 26,471 9 Baiyin

  13. Slide 13: Projected Operating Results

    PROJECTED OPERATING RESULTS • Plant construction and commissioning $10m • At $950 tonne zinc price (no gold), after tax project profits $4.5m per annum, internal rate of return to project 43% and 2 year capital payback • At $723 tonne zinc price, operating break even (no gold) • Significant financia

  14. Slide 14: History

    HISTORY • Resource discovered by Chinese in 1967 who completed 95,000 metres of diamond drilling • US$3.7 million spent by Griffin subsidiary with 10,000 metres of diamond drilling and 300 metres of underground driving completed. • Programme of exploration, pre-feasibility and development completed

  15. Slide 15: Inspecting Core at Site Office

    INSPECTING CORE AT SITE OFFICE Mladen Ninkov, Chairman, Griffin Mining; Rupert Crowe, CSA; Warren Woodhouse, CSA & Roger Goodwin, Finance Director, Griffin Mining

  16. Slide 16: Trial Decline into Zone III

    TRIAL DECLINE INTO ZONE III

  17. Slide 17: Legal Structure

    LEGAL STRUCTURE • Joint venture company, Hebei Hua’ Ao Mining Development Company Limited, established in 1993 • Chinese partners – The Ministry of Land and Natural Resources – The Zhangjiakou City Government – The Third Geological Brigade • Griffin has a 60% interest (80% until capital payback) – C

  18. Slide 18: Joint Venture Board of Directors & Management

    JOINT VENTURE BOARD OF DIRECTORS & MANAGEMENT From left to right: Mr Jin Shengchang, CFO, JV; Mr Pei Xiaodong, Dir 3 rd Brigade; Mr Jeff Haitian Sun, Chief Rep China, Griffin Mining; Mr Zhao Quanle, Dep Dir MLR & Dir JV; Mr Mladen Ninkov, Chairman Griffin Mining & JV; Mr Zhang Baoyi, Mayor of Zhangj

  19. Slide 19: Exploration Potential

    EXPLORATION POTENTIAL • Potential to add significant gold & zinc reserves by drilling between mineralized Zones II & III • Drilling and other work in Zones II, IV and V indicate significant potential for discoveries of zinc, gold, copper and other metals • Exploration licence over 102 sq. km of high

  20. Slide 20: Regional Geology Showing Epithermal Gold Targets

    REGIONAL GEOLOGY SHOWING EPITHERMAL GOLD TARGETS

  21. Slide 21: Risk Factors

    RISK FACTORS • China political and country risk – Entry into World Trade Organization in 2002 – Overtook the USA to become the largest recipient of foreign direct investment with inflows of $90 billion – Establishment of Shanghai Gold Exchange providing transparent price for gold • Zinc price – Chin

  22. Slide 22: Chinese Zinc Concentrates Import / Export

    CHINESE ZINC CONCENTRATES IMPORT / EXPORT

  23. Slide 23: Chinese Zinc Production 1996 - 2002

    CHINESE ZINC PRODUCTION 1996 - 2002

  24. Slide 24: Summary

    SUMMARY • Management team with clear strategy to deliver value • Company with extensive experience and presence in China • Well structured and legally secure joint venture with foremost issue of exploration and mining licences in China • Zinc & gold resource defined, pre-feasibility study completed