Nordique Critical Metals Inc. · TSXV:NQC
Nordique Critical Metals — Investor Presentation (October 2026)
47 slides from Nordique Critical Metals's investor presentation, October 2026
Slide 1: Kwyjibo Rare Earth Project Investor Presentation
KWYJIBO KWYJIBO PROJECT – TECHNICAL PRESENTATION (2026 PEA UPDATE) RARE EARTH PROJECT INVESTOR PRESENTATION OCTOBER 2026 TSXV: NQC | OTC: JORFF | FRA: J6K
Slide 2: Legal Disclaimer
LEGAL DISCLAIMER CAUTIONARY LANGUAGE AND LEGAL DISCLAIMER This presentation of Consolidated Lithium Metals (“Consolidated” or the “Company”) is for information only and shall not constitute an offer to buy, sell, issue or subscribe for, or the solicitation of an offer to buy, sell or issue, or subsc
Slide 3: Agenda
NORDIQUE CRITICAL METALS • AGENDA § NORDIQUE AT A GLANCE § KWYJIBO PROJECT SUMMARY § ENVIRONMENTAL SAFEGUARDS ACROSS THE PROJECT § LOCAL COMMUNITY DEVELOPMENT PARTNERSHIP § MOVING FORWARD TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 3
Slide 4: Nordique Critical Metals at a Glance
NORDIQUE CRITICAL METALS • AT A GLANCE • Nordique Critical Metals Incs (NQC) is a Canadian junior mining exploration company focused on the exploration and development of critical mineral projects in stable jurisdictions. • Lithium properties (6): Nordique is exploring 6 Lithium projects (22,825) ha
Slide 5: Agenda
NORDIQUE CRITICAL METALS • AGENDA § NORDIQUE AT A GLANCE § KWYJIBO PROJECT SUMMARY § ENVIRONMENTAL SAFEGUARDS ACROSS THE PROJECT § LOCAL COMMUNITY DEVELOPMENT PARTNERSHIP § MOVING FORWARD TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 5
Slide 6: Two-Site Development Concept
KWYJIBO • TWO-SITE DEVELOPMENT CONCEPT 1. KWYJIBO UNDERGROUND MINE SITE Underground mine • 2.67 ha surface platform 2. HYDROMET COMPLEX (SHELDRAKE) Crushing • Concentration • Hydrometallurgy • 11.34 ha 1 ACCESS ROAD Dedicated 144 km road connecting both sites NO SURFACE TAILINGS ˃ Mine site: No surf
Slide 7: Mine Surface Footprint (2.67 ha)
KWYJIBO • EMPREINTE EN SURFACE DE LA MINE (2,67 ha) SOURCE : ÉTUDE EEP 2026 POUR LE PROJET KWYJIBO, PRÉPARÉE POUR NORDIQUE MÉTAUX CRITIQUES INC. PAR DRA AMERICAS INC. TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 7
Slide 8: Mine Surface Footprint vs Place Sept-Îles
KWYJIBO • EMPREINTE EN SURFACE DE LA MINE (2,67 ha) vs Place Sept-Îles (5.78 ha) SOURCE : ÉTUDE EEP 2026 POUR LE PROJET KWYJIBO, PRÉPARÉE POUR NORDIQUE MÉTAUX CRITIQUES INC. PAR DRA AMERICAS INC. TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 8
Slide 9: Hydrometallurgical Complex (11.86 ha)
KWYJIBO• HYDROMETALLURGICAL COMPLEX (11.86 ha) SOURCE: 2026 PEA STUDY FOR THE KWYJIBO PROJECT PREPARED FOR NORDIQUE CRITICAL METALS INC. BY DRA AMERICAS INC. TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 9
Slide 10: Pointe-Noire Aluminum Smelter vs Hydromet Complex Footprint
KWYJIBO • POINTE-NOIRE ALUMINUM SMELTER (70 ha) vs HYDROMETALLURGICAL COMPLEX FOOTPRINT (11.86 ha) Engineering assessment underway to optimize the process → Targeting the return of all project residues underground TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 10
Slide 11: Mineral Resource Estimate for Josette Combined Zones
KWYJIBO • MINERAL RESOURCE ESTIMATE FOR JOSETTE COMBINED ZONES Total Critical TREO TREO Nd2O3 + Type Tonnes Tb2O3 Dy2O3 TREO REO Light Heavy Pr2O3 *1000 % % % % % % % Josette North-East Measured 1,409 3.38 1.52 2.27 1.11 0.68 0.019 0.11 Indicated 2,728 3.44 1.54 2.31 1.12 0.69 0.019 0.11 M+I 4,137 3
Slide 12: Compact Underground Mine
KWYJIBO • COMPACT UNDERGROUND MINE • INITIALLY MINING JOSETTE NORTHEAST 1,060 t/d 10 yr 75% DESIGN MINE RATE MINE LIFE LOM TREO RECOVERY 387 kt/y 3.35% 9.8 kt/year ANNUAL THROUGHPUT LOM TREO GRADE AVERAGE TREO PRODUCTION SOURCE: 2026 PEA STUDY FOR THE KWYJIBO PROJECT PREPARED FOR NORDIQUE CRITICAL M
Slide 13: Processing & Separation of Rare Earths
KWYJIBO • PROCESSING & SEPARATION OF RARE EARTHS MAGNETIC RARE EARTH ORE CRUSH + GRIND HYDROMET → → SEPARATION → → OXIDES 387 kt/y 48 microns 600 gauss + recovery REE extraction ~10 kt/y capacity 95.5% ~45% ~78% REE RECOVERY TO NON-MAG CONCENTRATE MASS PULL TO NON-MAG CONCENTRATE CUMULATIVE TREO+Y H
Slide 14: Simplified Processing Flowchart
KWYJIBO • SIMPLIFIED PROCESSING FLOWCHART SOURCE (PROCESSING): 2026 PEA STUDY FOR THE KWYJIBO PROJECT PREPARED FOR NORDIQUE CRITICAL METALS INC. BY DRA AMERICAS INC. SOURCE (HYDROMETTALURGY): SMH PROCESSING (ERIC LAROCHELLE) TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 14
Slide 15: Simplified Processing Flowchart
KWYJIBO • SIMPLIFIED PROCESSING FLOWCHART Engineering assessment underway to optimize the process → Targeting the return of all project residues underground Engineering assessment underway to optimize the process → Targeting the return of all project residues underground SOURCE (PROCESSING): 2026 PE
Slide 16: Rare Earth Distribution
KWYJIBO • RARE EARTH DISTRIBUTION (Source: Adamas Intelligence | March 2026) Kwyjibo – Distribution of Rare Earth Oxides Kwyjibo – Oxide Contribution to basket value Kwyjibo – Rare Earth Oxides Basket Value Forecast TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 16
Slide 17: Project Production, Costs, Economics
KWYJIBO • PROJECT PRODUCTION | COSTS | ECONOMICS Kwyjibo | Production Parameters Parameter Unit Value Mine life Years 10 Annual throughput Ktpa 387 TREO grade, LOM average % TREO 3.35 TREO recovery, LOM average % 75.0 Annual production, TREO (average1) Ktpa 9.8 Kwyjibo | Capital and Operating Cost E
Slide 18: Project Summary
KWYJIBO • PROJECT SUMMARY Strong PEA economics supported by a compact, infrastructure-led project concept. 46.5% 35.4% 2.0 yr 10 yr PRE-TAX IRR AFTER-TAX IRR AFTER-TAX PAYBACK MINE LIFE ~9.8 kt/y 17.5 CAD $/kg TREO 79.58 CAD $/kg TREO ~35 MW AVERAGE TREO PRODUCTION KWYJIBO PROJECT OPERATING COSTS RA
Slide 19: Agenda
NORDIQUE CRITICAL METALS • AGENDA § NORDIQUE AT A GLANCE § KWYJIBO PROJECT SUMMARY § ENVIRONMENTAL SAFEGUARDS ACROSS THE PROJECT § LOCAL COMMUNITY DEVELOPMENT PARTNERSHIP § MOVING FORWARD TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 19
Slide 20: Project Infrastructure Outside Protected Zones
KWYJIBO • PROJECT INFRASTRUCTURE OUTSIDE PROTECTED ZONES 1. KWYJIBO UNDERGROUND MINE SITE Underground mine • 2.67 ha surface platform 2. HYDROMET COMPLEX (SHELDRAKE) Crushing • Concentration • Hydrometallurgy • 11.86 ha ACCESS ROAD Dedicated 144 km road connecting both sites INFRASTRUCTURE OUTSIDE P
Slide 21: 2018 to 2026 Principal Modifications to the Project
KWYJIBO • 2018 → 2026 • PRINCIPAL MODIFICATIONS MADE TO THE PROJECT 2018 2026 Mine + Crusher + Concentrator at Kwyjibo (21 ha) → No Crusher and Concentrator at Kwyjibo Mine (2.67 ha) Hydromallurgical Complex at Sept-Îles (13.25 ha) → Hydromallurgical Complex at Sheldrake (11.86 ha) Residue storage a
Slide 22: Residue Management Moves Underground
KWYJIBO • RESIDUE MANAGEMENT MOVES UNDERGROUND RESIDUES FROM CONCENTRATOR & HYDROMETALLURGICAL PLANT Magnetic separation residue RETURNED CEMENTED Primary leach residue UNDERGROUND BACKFILL to backfill mined-out workings Phosphorus-bearing process residue 2026 design principle Eliminate permanent su
Slide 23: Residue Management Moves Underground
KWYJIBO • RESIDUE MANAGEMENT MOVES UNDERGROUND RESIDUE FROM CONCENTRATOR & HYDROMETALLURGICAL RETURNED UNDERGROUND AS PASTE BACKFILL TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 23
Slide 24: Agenda
NORDIQUE CRITICAL METALS • AGENDA § NORDIQUE AT A GLANCE § KWYJIBO PROJECT SUMMARY § ENVIRONMENTAL SAFEGUARDS ACROSS THE PROJECT § LOCAL COMMUNITY DEVELOPMENT PARTNERSHIP § MOVING FORWARD TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 24
Slide 25: Potential Partnership with Local Community
KWYJIBO • POTENTIAL PARTNERSHIP WITH LOCAL COMMUNITY Nordique’s objective is to advance Kwyjibo through structured, long-term partnerships with Innu Nations and local communities — extending beyond consultation to meaningful participation as the Project develops. 01 02 03 04 DEVELOPMENT MONITORING P
Slide 26: What the Next Study Phase Must Confirm
KWYJIBO • WHAT THE NEXT STUDY PHASE MUST CONFIRM 01 ENGINEERING 02 ENVIRONMENT 03 PROCESS 04 SOCIAL + PERMITTING Mine design + schedule Baseline programs Metallurgical optimization Structured consultation Road + power design Water + hydrogeology Mass balances Socio-economic baseline Backfill system
Slide 27: Agenda
NORDIQUE CRITICAL METALS • AGENDA § NORDIQUE AT A GLANCE § KWYJIBO PROJECT SUMMARY § ENVIRONMENTAL SAFEGUARDS ACROSS THE PROJECT § LOCAL COMMUNITY DEVELOPMENT PARTNERSHIP § MOVING FORWARD TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 27
Slide 28: From PEA to Feasibility Technical Report
KWYJIBO • FROM PEA TO FEASIBILITY TECHNICAL REPORT 2026 2026–27 2027 2027+ NEXT PEA UPDATE FIELD + TESTWORK + FINANCING FEASIBILITY PERMITTING PROJECT DELIVERY + COMMUNITY CONSULATION Baseline, metallurgy, Infrastructure + Technical concept + design Engineering + updated Environmental review + geoch
Slide 29: Near-Term Project Milestones
KWYJIBO • NEARTERM PROJECT MILESTONES § Ratification of Definite Agreement with SOQUEM (COMPLETED) § Completion of Preliminary Economic Assessment to evaluate technical, economic, and enviromental viability of the Project in 2030 (COMPLETED) § Consultations with the Innu of Takuaikan Uashat mak Mani
Slide 30: Thank You
THANK YOU e: info@nordiquecriticalmetals.com 1000 rue De La Gauchetière Ouest, Suite MZ400, Montréal, Québec H3B 0A2, Canada www.nordiquecriticalmetals.com TSXV: NQC | OTCQB: JORFF | FRA: J6K
Slide 31: Appendix
NORDIQUE CRITICAL METALS • APPENDIX § MANAGEMENT AND BOARD MEMBERS § PROJECT LOCATION AND RESOURCES DETAILS § KWYJIBO SITE AND CORE FACILITY VISIT TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 31
Slide 32: Management & Technical
NORDIQUE CRITICAL METALS • MANAGEMENT & TECHNICAL Experienced in Mineral Exploration, Development, Construction & Operation RICHARD QUESNEL STEVE SIMARD SERGE PERREAULT PRESIDENT & CEO TECHNICAL ADVISOR - ENGINEERING TECHNICAL ADVISOR - GEOLOGY Mr. Quesnel served as President and Chief Mr. Simard, E
Slide 33: Management & Technical
NORDIQUE CRITICAL METALS • MANAGEMENT & TECHNICAL Experienced in Mineral Exploration, Development, Construction & Operation MURRAY BROWN AARON ATIN DR. ANDREAS ROMPEL TECHNICAL ADVISOR - METALLURGY CORPORATE SECRETARY VICE PRESIDENT EXPLORATION Mr. Brown is a senior metallurgist with over Mr. Atin i
Slide 34: Management
NORDIQUE CRITICAL METALS • MANAGEMENT Experienced in Mineral Exploration, Development, Construction & Operation RYAN PTOLEMY CHIEF FINANCIAL OFFICER Mr. Ptolemy is a CPA, CGA and CFA charter holder and obtained a B.A. from Western University. He serves as CFO to a number of public and private compan
Slide 35: Board of Directors
NORDIQUE CRITICAL METALS • BOARD OF DIRECTORS Experienced in Mineral Exploration, Development, Construction & Operation BRETT LYNCH. RICHARD QUESNEL ROBERT BRYCE EXECUTIVE CHAIRMAN PRESIDENT & CEO | DIRECTOR DIRECTOR Mr. Lynch is a highly experienced Mr. Quesnel served as President and Chief Robert
Slide 36: Board of Directors
NORDIQUE CRITICAL METALS • BOARD OF DIRECTORS Experienced in Mineral Exploration, Development, Construction & Operation MAXIME LEMIEUX LLB. DIRECTOR Mr. Lemieux is part of the Corporate Group at MacMillan LLP in Montréal. He is primarily acting for public companies, agents, securities distributors a
Slide 37: Appendix
NORDIQUE CRITICAL METALS • APPENDIX § MANAGEMENT AND BOARD MEMBERS § PROJECT LOCATION AND RESOURCES DETAILS § KWYJIBO SITE AND CORE FACILITY VISIT TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 37
Slide 38: Mineral Resource Estimate
KWYJIBO• MINERAL RESOURCE ESTIMATE MINERAL RESOURCE ESTIMATE SUMMARY | EFFECTIVE JUNE 25, 2026 SOURCE: 2026 PEA STUDY FOR THE KWYJIBO PROJECT PREPARED FOR NORDIQUE CRITICAL METALS INC. BY DRA AMERICAS INC. TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 38
Slide 39: Project Drillhole Locations Josette Northeast | Southwest
KWYJIBO • PROJECT DRILLHOLE LOCATIONS • JOSETTE NORTHEAST | SOUTHWEST KWYJIBO IS CLASSED IN TWO ZONES: JOSETTE SOUTHWEST | JOSETTE NORTHEAST SOURCE: 2018 PEA Study for the Kwyjibo Project prepared for SOQUEM by DRA/Met-Chem # : G02187 TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS
Slide 40: Longitudinals of Horizon Josette
KWYJIBO • LONGITUDINALS OF HORIZON JOSETTE LJ-750 LJ-925 SOURCE : Étude EEP 2018 pour le projet Kwyjibo préparée pour SOQUEM par DRA/Met-Chem n° : G02187 TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 40
Slide 41: Critical Rare Earth Ratio of Major Deposits Worldwide
Critical rare earth ratio of major rare earth deposits worlwide Critical Rare Earth Oxides (CREOs) Pr₂O₃ – Praseodymium oxide Nd₂O₃ – Neodymium oxide Dy₂O₃ – Dysprosium oxide Tb₂O₃ – Terbium oxide Y₂O₃ – Yttrium oxide SOURCE : Étude EEP 2018 pour le projet Kwyjibo préparée pour SOQUEM par DRA/Met-Ch
Slide 42: Cross Section Along Josette Northeast Zone
KWYJIBO • CROSS SECTION ALONG JOSETTE NORTHEAST ZONE SOURCE: 2018 PEA Study for the Kwyjibo Project prepared for SOQUEM by DRA/Met-Chem # : G02187 TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 42
Slide 43: Appendix
NORDIQUE CRITICAL METALS • APPENDIX § MANAGEMENT AND BOARD MEMBERS § PROJECT LOCATION AND RESOURCES DETAILS § KWYJIBO SITE AND CORE FACILITY VISIT TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 43
Slide 44: Surface Site Visit (09/2025)
KWYJIBO • SURFACE SITE VISIT (09/2025) SOURCE: NORDIQUE/SOQUEM visit to the Kwyjibo Exploration Project (September 2025) TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NORDIQUE CRITICAL METALS 44
Slide 45: Nordique/SOQUEM Core Shack Visit (09/2025)
KWYJIBO • NORDIQUE/SOQUEM CORE SHACK VISIT (09/2025) Hole 13-112 | 17 meters @ 6.94% TREO SOURCE: 2018 PEA Study for the Kwyjibo Project prepared for SOQUEM by DRA/Met-Chem # : G02187 SOURCE: NORDIQUE/SOQUEM visit to the Kwyjibo Core Shack (September 2025) TSXV: NQC | OTC: JORFF | FRA: J6K © 2026 NO
Slide 46: Nordique/SOQUEM Core Shack Visit (09/2025)
KWYJIBO • NORDIQUE/SOQUEM CORE SHACK VISIT (09/2025) Hole 13-69A | One of the holes used for metallurgical testing of mineralized magnetite. Hole was drilled near Hole 13-69 which resulted in 26 meters @ 3.10% TREO SOURCE: 2018 PEA Study for the Kwyjibo Project prepared for SOQUEM by DRA/Met-Chem #
Slide 47: Thank You
THANK YOU e: info@nordiquecriticalmetals.com 1000 rue De La Gauchetière Ouest, Suite MZ400, Montréal, Québec H3B 0A2, Canada www.nordiquecriticalmetals.com TSXV: NQC | OTCQB: JORFF | FRA: J6K
Nordique Critical Metals — Investor Presentation (October 2026) on 6ix