Turquoise Hill Resources Ltd.

Turquoise Hill Resources — Investor Presentation (April 2018)

31 slides from Turquoise Hill Resources's investor presentation, Apr 9, 2018

  1. Slide 1: Investor Presentation April 2018

    Investor Presentation April 2018 Oyu Tolgoi: world-class asset, development optionality, significant cash flow potential

  2. Slide 2: Forward-looking statements

    Forward-looking statements 2 This presentation includes certain “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbour” provisions of the United States Private Securities Litigation Refor

  3. Slide 3: Turquoise Hill's investment thesis

    Turquoise Hill’s investment thesis 3  World-class asset with long-term development optionality  Significant free cash flow generation expected from underground  Expected benefit from lower copper supply (~2020) and ongoing Jaw crusher – Bin 11 demand growth

  4. Slide 4: Robust long-term production profile

    Robust long-term production profile 4 Copper ('000 tonnes) Gold ('000 ounces) Expected copper production growth 2018 – 2025: +340% 669 622 +150% 612 Expected gold production growth 2018 – 2025: 583 522 521 475 450 397 369 Source: 2016 Oyu Tolgoi Technical Report 260 256 264 Phase 4A Phase 4A product

  5. Slide 5: Significant cash flow expected

    Significant cash flow expected 5 Indicative Oyu Tolgoi Cash Flow $3.00/lb. Copper and $1,300/oz. Gold (Estimated values in billions; see footnotes for assumptions) (Billions) $3.5 $3.0 $2.5 From 2014 – 2017, Oyu $2.0 Tolgoi has generated ~$2.1 billion in $1.5 From 2022 – 2026, operating cash flow $1

  6. Slide 6: Long-term development optionality

    Long-term development optionality 6 Resources 120 Case • ~Year 20, concentrator capacity ~120mtpa • NPV8% $8.8 billion1 • Expansion capex ~$14.9 billion3 Resources 100 Case • ~Year 20, concentrator capacity ~100mtpa • NPV8% $8.9 billion1 • Expansion capex ~$13.5 billion3 Resources 50 Case • Assumes

  7. Slide 7: Long-term copper fundamentals strong

    Long-term copper fundamentals strong 7 Copper mine supply/demand outlook  Small deficit/balanced market Base Primary Demand Avg copper price expected 2018-2019 30 4.50 Forecast 4.00  Ongoing attrition at existing 25 mines driven by declining grade Copper mine supply/demand (millions of tonnes) 3.5

  8. Slide 8: Underground development

    Underground development Bottom of Shaft 2

  9. Slide 9: Underground progress at Q4'17

    Underground progress at Q4’17 9 Workforce Workforce Composition Lateral Development Over Mongolian nationals Since project restart 6,600 89% 7.7 eq. km workers of workforce completed Development Rates Project Spend Mongolian Spend New 3,500 tpd Project spend and Over capital commitments crusher tota

  10. Slide 10: 2016 Resources Case: ~3.3 billion tonnes

    2016 Resources Case: ~3.3 billion tonnes 10 Oyut Open Pit ~860Mt (reserve) 0.44% copper; 0.28 g/t gold Hugo South ~300Mt (resource) Heruga 1.07% copper ~700Mt (resource) 0.06 g/t gold 0.42% copper 0.43 g/t gold; >100Mlb moly Hugo North Lift 1, panels 0,1,2 ~500Mt (reserve) 1.66% copper; 0.35 g/t gol

  11. Slide 11: Underground mining sequence

    Underground mining sequence 11 Panel 0 Panel 2 Panel 1 Initial production – three to five draw Five draw bells per month bells per month Four draw bells per month South North Average grade 2.5% cu  Initial underground production begins with Panel 0  Highest copper grades occur during ramp up excee

  12. Slide 12: Underground development status

    Underground development status 12  7.7 equivalent kilometres completed (January 2016 – end Q4’17) Lateral development  Newly installed 3,500 tonne per day crusher consistently operating above nameplate capacity  Expect ~10.0 kilometres of lateral development in 2018 Shaft 2  Shaft sinking comple

  13. Slide 13: Complete ramp-up expected by 2027

    Complete ramp-up expected by 2027 13 Sustainable underground production Complete convey-to-surface Project First draw Complete concentrator Complete re-start bell firing upgrade ramp-up 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Expansion capital Pre-start Sustaining capital Ex

  14. Slide 14: Hugo North Lift 1 production schedule

    Hugo North Lift 1 production schedule 14 Figure: 2016 Oyu Tolgoi Technical Report.

  15. Slide 15: CAPEX profile

    CAPEX profile 15 Underground capital spend profile1 ($ billion) $1.3 $1.2 $1.2 $1.0 $0.8 $0.8 $0.5 $0.5 $0.4 $0.4 $0.4 $0.3 $0.3 $0.2 2016e 2016a 2017e 2017a 2018e 2019e 2020e 2021e 2022e 2023e 2024e 2025e 2026e 2027e Expansion capital Sustaining capital Expansion capital of $5.3 billion and sustain

  16. Slide 16: Open-pit operations

    Open-pit operations

  17. Slide 17: Production highlights

    Production highlights 17 All injury frequency rate Concentrator throughput (Per 200,000 hours worked) ('000 tonnes) 41,177 38,152 34,537 27,872 0.47 0.33 0.27 0.22 2014 2015 2016 2017 2014 2015 2016 2017 Industry-leading safety performance Record-setting throughput for 2017 Copper in concentrates Go

  18. Slide 18: Financial highlights

    Financial highlights 18 Revenue Operating cash costs ($'000,000) ($'000,000) $1,736 $1,635 $959 $963 $775 $1,203 $712 $940 2014 2015 2016 2017 2014 2015 2016 2017 2017 revenue reflects lower sales volumes due to reduced grades, Operating cash costs have decreased more than 25% since 2014 partially o

  19. Slide 19: Production and financial guidance

    Production and financial guidance 19 2017 2018 Copper in concentrates 157,400 tonnes (actual) 125,000 – 155,000 tonnes 130,000 – 160,000 tonnes Gold in concentrates 114,000 ounces (actual) 240,000 – 280,000 ounces 100,000 – 140,000 ounces Operating cash costs $712M (actual) $700M $720M Capital expen

  20. Slide 20: Reserves case concentrator performance

    Reserves case concentrator performance 20 Annual concentrator throughput (million tonnes) Million Copper grade Gold grade Cu % grade tonnes Au g/t 45 2.00 41.2 39.7 40.0 40.1 40.0 40.0 40 38.2 37.9 37.0 37.1 35.1 34.5 35 1.50 30 27.9 25 1.00 20.3 20 15 0.50 10 5 0 0.00 2013a 2014a 2015a 2016a 2017a

  21. Slide 21: Managing near-term ore grade challenges

    Managing near-term ore grade challenges 21 Open-pit plan view Phase 7  Phase 4A higher gold grades in second half of Phase 6 2018 Phase 10  Phase 6 continues to be Phase 5 Phase 8 mined in early 2018 and Phase 4 will be mined throughout the year Phase 4A  Phase 4B stripping continues Phase 9 Phas

  22. Slide 22: Oyu Tolgoi – a long-term growth opportunity

    Oyu Tolgoi – a long-term growth opportunity 22  Advancing underground development  Creating long-term development options  Demonstrated productivity and cost improvements  Best copper asset in development

  23. Slide 23: Appendix

    Appendix

  24. Slide 24: Helping expand the Mongolian economy

    Helping expand the Mongolian economy 24 Mongolian Workforce Taxes and Fees In-country Spend >13,000 ~$1.7B ~$7.2B At the end of 2017, the 2010 – 2017, Oyu Tolgoi Between 2010 and 2017, Oyu Tolgoi’s workforce had paid ~ $1.7 billion in Oyu Tolgoi has spent was 13,000+ strong and taxes and royalties t

  25. Slide 25: Reserves Case cash-flow model

    Reserves Case cash-flow model 25 Cash Flow Statement (US$M) Year Total Year Number 1 2 3 4 5 6 7 8 9 10 11 21 31 Year To 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 20 30 40 Gross Revenue 954 923 1,189 1,402 1,735 1,993 3,380 4,434 4,879 4,622 35,422 13,698 8,175 82,806 Realization Costs 263 2

  26. Slide 26: Increasing copper demand from electric vehicles

    Increasing copper demand from electric vehicles 26 Vehicle Type Contained copper From 2017 to 2025 Conventional car 18 – 49 lbs. copper  Copper demand from electric Hybrid electric vehicles 85 lbs. copper vehicles is expected to grow Plug-in hybrid electric 132 lbs. copper roughly six times from ~0

  27. Slide 27: Block cave concept

    Block cave concept 27  Gravity used to exploit deep ore body Block caving  Cave propagation (caveability) depends on in situ stresses and host rock’s ability to fracture  Initial drill, blast and extraction focused on bottom section of ore body via drawpoint to create void  Broken ore removal fr

  28. Slide 28: Oyu Tolgoi at China's doorstep

    Oyu Tolgoi at China’s doorstep 28

  29. Slide 29: Project finance flow of funds

    Project finance flow of funds 29 Shareholder loan At project finance drawdown Payable to Turquoise Hill* Receivable from Oyu Tolgoi* Proceeds: $4.3 billion2 $4.3 billion3 $4.2 billion Shareholder loan Q1’16: $7.0 billion Shareholder loan Q4’17: $3.9 billion Payable to Turquoise Hill* Receivable from

  30. Slide 30: Underground elements

    Underground elements 30 Ground Support Undercut APEX To Drill Drilling Blasting 28m 28m 17m UNDERCUT 17m EXTRACTION 28m Extraction Ore Handling Drawbell Ore Steel Set Pass Drawpoint Extraction Drift Vent IDZ Raise 10 m Drawbell blast 12 m

  31. Slide 31: turquoisehill.com

    turquoisehill.com Turquoise Hill Resources Ltd. Suite 354 - 200 Granville Street Vancouver, BC, Canada V6C 1S4 TRQ: TSX, NYSE & NASDAQ Turquoise Hill is an international mining company focused on the operation and development of the Oyu Tolgoi copper-gold mine in southern Mongolia.