HIVE Digital Technologies Ltd · TSX:HIVE

HIVE Digital Technologies — Q2 FY2027 Earnings Presentation

70 slides from HIVE Digital Technologies's earnings presentation, November 2026

  1. Slide 1: Q2 F2027 Results Webcast

    Q2 F2027 Results Webcast Quarter Ended September 30, 2026 www.HIVEDigitalTech.com

  2. Slide 2: Disclosures

    Disclosures In this presentation, “HIVE” or the “Company” refers to HIVE Digital Technologies Ltd (TSX: HIVE | NASDAQ: HIVE). Currency: All amounts are in US dollars, unless otherwise indicated. Forward Looking Information. Except for the statements of historical fact, this presentation contains “fo

  3. Slide 3: Macro Recap

    MACRO RECAP Frank Holmes, Executive Chairman 3

  4. Slide 4: DNA of Volatility

    DNA of Volatility Standard Deviation for One Year, as of September 30, 2026 Understanding Risk One-Day Ten-Day S&P 500 ±1% ±2% Gold Bullion ±2% ±5% Nvidia ±2% ±6% Bitcoin ±3% ±9% Strategy ±5% ±13% CoreWeave ±6% ±18% HIVE Digital Technologies Ltd. ±6% ±22% Source: Bloomberg, HIVE Digital Technologies

  5. Slide 5: Leadership Team

    Leadership Team Frank Holmes Darcy Daubaras Executive Chairman CFO Aydin Kilic Craig Tavares President & CEO President & COO, BUZZ HPC Gabriel Ibghy General Counsel Johanna Thörnblad Sweden Country President Gabriel Lamas Paraguay Country President 5

  6. Slide 6: Every Industry Has Its Scams

    EVERY Bad Actors Exist In Every Industry INDUSTRY HAS The Methods Change. The Deception Does Not. ITS SCAMS Precious Metals | China 2020 Cryptocurrency | North Korea 2026 83 metric tons of gold-plated copper bars Hackers stole approximately $6.3 billion in used as collateral for $2.0 million in loan

  7. Slide 7: Who Is HIVE?

    WHO IS HIVE? The world’s first publicly listed digital asset miner on the TSX.V 2017 $1M+ First crypto miner to go public on Average daily revenue, crossed the TSX.V Aug 2026 ~25 EH/s ~100% Installed hashrate ≈ 2% of the Renewable power at every site Bitcoin network Company disclosures: HIVE press r

  8. Slide 8: HIVE Operates In 9 Time Zones, 5 Languages & 3 Continents

    ~5,000 miles distance HIVE Operates In ~5,000 miles 9 Time Zones, distance 5 Languages & 3 continents. www.HIVEDigitalTech.com

  9. Slide 9: HIVE Uses Green Energy

    Paraguay HIVE USES GREEN ENERGY CANADA, SWEDEN AND PARAGUAY Low Electricity Cost Low Temperatures Fast Internet Connection www.HIVEDigitalTech.com Iguazu Falls

  10. Slide 10: Turning Hydroelectric Power into Computing Power

    Itaipu Dam, Paraguay HIVE Is Turning Hydroelectric Power into Computing Power www.HIVEDigitalTech.com

  11. Slide 11: HIVE's Top Institutional Shareholders

    HIVE’s Top Institutional Shareholders Percentage of Shares Outstanding as of 9/30/2026 6.17% Invesco 4.08% Citadel Advisors 3.58% Millennium Management LLC 3.31% Situational Awareness 1.58% Vident Advisory Source: Bloomberg, HIVE Digital Technologies

  12. Slide 12: HIVE's Stock Rises Above The 50-Day Moving Average

    HIVE’s Stock Rises Above The 50-Day Moving Average Stock Price in USD BUZZ HPC Closes USD $220M Sovereign AI GPU Announces Up- Contract with Bell AI Fabric for Cohere Inc. Listing to TSX – June 18th - May 7th Korean Semiconductor Selloff Sparks Broader AI Market Volatility – Early July HIVE Announce

  13. Slide 13: Central Bank of Paraguay Recognizes Bitcoin as an Export

    The Central Bank of Paraguay (Banco Central del Paraguay) Now Recognizes Bitcoin as an Export www.HIVEDigitalTech.com

  14. Slide 14: HIVE First to Build Tier 3 Data Centers and AI Factories

    HIVE was the first to build Tier 1 data centers and long- term Tier 3 A.I. factories Rally del Paraguay (Rally Trans Itapúa) www.HIVEDigitalTech.com

  15. Slide 15: Stargate Is Heading To Paraguay

    HIVE led the way, now Stargate Is Heading To Paraguay www.HIVEDigitalTech.com

  16. Slide 16: ALL-IN Summit 2026

    ALL-IN Summit 2026 Connecting With the Voices Shaping the AI Revolution #1 AI & Technology Podcast Where Innovation Meets Capital On the Ground at the AI Revolution

  17. Slide 17: Blue Midterm Sweep Puts Sovereign Data Centers in Focus

    Blue Midterm Sweep Puts Sovereign Data Centers Like BUZZ in Focus www.HIVEDigitalTech.com Source: The Associated Press

  18. Slide 18: HIVE Exports Compute

    HIVE Exports Compute www.HIVEDigitalTech.com

  19. Slide 19: BUZZ HPC Partners with ProCogia

    HIVE’s BUZZ HPC Partners with ProCogia to Deliver End-to-End Sovereign AI Across Canada, U.S. and Europe September 16, 2026 www.HIVEDigitalTech.com

  20. Slide 20: BUZZ HPC Secures ~$129 Million Financing

    HIVE’s BUZZ HPC Secures ~$129 Million at 9% Fixed-Rate Financing at 80% Loan-to-Cost to Expand Sovereign AI Infrastructure October 28, 2026 www.HIVEDigitalTech.com

  21. Slide 21: Canadian AI Ecosystem & BUZZ AI Factories

    Canadian AI Ecosystem & BUZZ AI Factories Major AI Research Hubs and Sovereign AI Infrastructure in Ontario Birth place of Ethereum BUZZ AI Factories AI Research Institutes & Centers www.HIVEDigitalTech.com

  22. Slide 22: 320 MW GTA Giga Factory

    320 MW GTA Giga Factory $360M ARR Target | 320 MW | 100,000+ GPUs | ~CAD 3.5B capex | H1 2028 District Civil Infra. Water Line Roadway Hundreds of Sustainable Planning Investment Upgrades Improvements Skilled Jobs Liquid Cooling www.HIVEDigitalTech.com 22

  23. Slide 23: HIVE & BUZZ HPC Partnerships

    HIVE & BUZZ HPC Partnerships www.HIVEDigitalTech.com

  24. Slide 24: Expanding Our Industry Reach

    Expanding Our Industry Reach During the Third Quarter ended September 30, 2026 Conferences Attended: Interviews Given: 44 67 www.HIVEDigitalTech.com

  25. Slide 25: Building Lasting Relationships

    Building Lasting Relationships Evan Solomon, Michael Dell, Lai Ching-te, Minister of Artificial Intelligence CEO Dell Technologies President of Taiwan & Digital Innovation www.HIVEDigitalTech.com

  26. Slide 26: Building Industry Partnerships

    Building Industry Partnerships www.HIVEDigitalTech.com

  27. Slide 27: Land & Power — Building the Pipeline

    Land & Power — Building the Pipeline GIGA-FACTORY SITE BODEN, SWEDEN PARAGUAY SUBSTATION PECOS, TEXAS 320 MW 32 MW 100 MW 500 MW 25-acre acquisition Building Purchase $12M IT-load substation build LOI secured — 300 acres complete www.HIVEDigitalTech.com

  28. Slide 28: Macro Forces: The Monroe Doctrine

    Macro Forces: The Monroe Doctrine 1 Billion Consumers The Western Hemisphere holds half of the “Ring of Fire” www.HIVEDigitalTech.com

  29. Slide 29: Latin America's Lithium Triangle Holds 43% of Lithium Resources

    Latin America's Lithium Triangle Holds 43% of the World's Identified Lithium Resources www.HIVEDigitalTech.com

  30. Slide 30: AI Data Centers Driving Demand for Lithium and Critical Metals

    AI Data Centers Are Driving Demand for Lithium + Other Critical Metals Projected Growth in Demand by Percentage, 2024 – 2040 353% 131% 69% 49% 35% 28% Lithium Graphite Nickel Magnet Rare Earths Cobalt Copper Source: UNCTAD, IEA, U.S. Global Investors www.HIVEDigitalTech.com

  31. Slide 31: Land is $1 of Every $100 of AI Capex

    Land is $1 of every $100 of AI capex An Illustrative $100 of AI capex, split across the supply chain

  32. Slide 32: Financial Results

    FINANCIAL RESULTS Darcy Daubaras, CFO 32

  33. Slide 33: Tickers: Issued and Outstanding Basic

    Tickers: Options: TSX.TO: HIVE 2.6 M Nasdaq: HIVE Colombia Exchange: RSUs: HIVECO 15.6 M Issued and Outstanding Basic Warrants: Common Shares: 276 M 3.0 M *As of September 30, 2026. Shareholder Data Based On Public Filings 33

  34. Slide 34: Q2'27 Financial Highlights

    Q2’27 Financial Highlights $ 84.9 M Total Revenue $ 24.8 M Adj. EBITDA $ 76.0 M Bitcoin Mining Revenue ($ 22.1 M) EBITDA ($ 78.7 M) Net Loss $ 8.9 M HPC/AI Revenue 269 Bitcoin in Treasury $ 30.2 M Gross Operating Margin

  35. Slide 35: Q2 2027 Financial Results

    Q2 2027 Financial Results $ 84.9 M 1,070 Bitcoin Revenue $ 24.8 M (Equivalent) Produced Adjusted EBITDA 35

  36. Slide 36: Healthy Balance Sheet

    ($M, as of September 30, 2026) Healthy Balance Sheet Strong liquidity position supporting continued growth investment $ 139.0 M Cash on Hand $ 22.6 M Digital Currencies Amounts Receivable $ 18.6 M $ 213.4 M Total Current Assets & Prepaids $ 11.0 M Investments $ 137.8 M Total Current Liabilities Sour

  37. Slide 37: Positive Gross Operating Margin YoY

    Positive Gross Operating Margin1 YoY Gross Operating Margin ($M) YoY (Q2 2026 – Q2 2027) $45 $42.4 $40 $35 $30.2 BASIC LOSS PER $30 SHARE: $25 Three Months ended $20 September 30 $15 2025 2026 $10 ($0.07) ($0.29) $5 $0 Q2 2026 Q2 2027 SEP-2025 SEP-2026 1 Gross Operating Margin calculated as total re

  38. Slide 38: Revenue and Gross Operating Margin YoY

    Revenue and Gross Operating Margin1 YoY YoY (Q2 2026 – Q2 2027) Revenue ($M) Gross Operating Margin ($M) $100 $45 $42.4 $90 $87.3 $84.9 $40 $80 $35 $70 $30.2 $30 $60 $25 $50 $20 $40 $15 $30 $20 $10 $10 $5 49% 36% Gross Op Margin Gross Op Margin $0 $0 Q2 2026 Q2 2027 Q2 2026 Q2 2027 SEP-2025 SEP-2026

  39. Slide 39: Revenue and Gross Operating Margin QoQ

    Revenue and Gross Operating Margin1 QoQ QoQ (Q1 2027 – Q2 2027) Revenue ($M) Gross Operating Margin ($M) $90 $35 $30.2 $30 $84.9 $25 $24.2 $20 $80 $79.1 $15 $10 $5 31% 36% Gross Op Margin Gross Op Margin $70 $0 Q1 2027 Q2 2027 Q1 2027 Q2 2027 JUN-2026 SEP-2026 JUN-2026 SEP-2026 1 Gross Operating Mar

  40. Slide 40: Financial Metrics: Earnings YoY

    Financial Metrics: Earnings YoY YoY (Q2 2026 – Q2 2027) Adjusted EBITDA, ($M) Net Income (Loss), ($M) $35 $0 $31.5 $30 -$10 $24.8 -$20 ($15.8) $25 -$30 $20 -$40 $15 -$50 -$60 $10 -$70 $5 -$80 ($78.7) $0 -$90 Q2 2026 Q2 2027 Q2 2026 Q2 2027 SEP-2025 SEP-2026 SEP-2025 SEP-2026 40

  41. Slide 41: Financial Metrics: Earnings QoQ

    Financial Metrics: Earnings QoQ QoQ (Q1 2027 – Q2 2027) Adjusted EBITDA, ($M) Net Loss, ($M) $30 $0 $24.8 -$20 $25 -$40 $20 -$60 $15 $13.4 -$80 ($78.7) -$100 $10 -$120 $5 -$140 ($142.9) $0 -$160 Q1 2027 Q2 2027 Q1 2027 Q2 2027 JUN-2026 SEP-2026 JUN-2026 SEP-2026 41

  42. Slide 42: Executive Update

    EXECUTIVE UPDATE Aydin Kilic President & CEO 42

  43. Slide 43: FQ2'27 Financial Highlights — Sept 30, 2026

    FQ2’27 Financial Highlights — Sept 30, 2026 $84.9M $30.2M $19.5M TOTAL REVENUE GROSS OPERATING MARGIN EARNINGS FROM OPERATIONS ¹ -3% YoY · +7% QoQ 36% of revenue (ex-depreciation) Net Of $10.7M of G&A $24.8M $78.7M $102M ADJUSTED EBITDA NET LOSS DEPRECIATION & NON -CASH IMPAIRMENT non-GAAP; see reco

  44. Slide 44: FQ2'27 Financial Highlights — Sept 30, 2026

    FQ2’27 Financial Highlights — Sept 30, 2026 $84.9M 36% $30.2M TOTAL REVENUE GROSS OPERATING MARGIN GROSS OPERATING MARGIN +7% QoQ · -3% YoY $76.0M 34% $25.7M BITCOIN MINING REVENUE GROSS MINING MARGIN GROSS MINING MARGIN 1,070 BTC mined · avg. $71,003/BTC $8.8M 51% $4.5M HPC / AI REVENUE GROSS HPC M

  45. Slide 45: $160M+ Cash & Bitcoin on the Balance Sheet

    $160M+ Cash & Bitcoin on the Balance Sheet AS OF SEPT 30, 2026 $139.0M $22.6M CASH ON BALANCE SHEET DIGITAL ASSETS BALANCE SHEET 5

  46. Slide 46: Operating Margins: Today

    Operating Margins: Today $40M HPC ARR 50% $20M TODAY: $110k Daily Revenue GROSS HPC MARGIN ANNUALIZED GROSS HPC MARGIN TODAY $300M BTC ARR 34% $100M 30% GMM Non-GAAP; Refer to 10Q GROSS MINING MARGIN ANNUALIZED GROSS MINING MARGIN +6% QoQ · −7% YoY Non-GAAP; Refer to 10Q 6

  47. Slide 47: HIVE Global Power Footprint: 860 MW

    HIVE Global Power Footprint: 860 MW Power is the scarcest asset in AI infrastructure. HIVE has 860 MW secured. Location MW Status Power Use HPC New Brunswick 70 MW Active BTC -> HPC Bitcoin Mining Global Lachute 30 MW Active BTC Mining MW Toronto Airport (TOR1) 7 MW Active BTC -> HPC Big Boden 32 MW

  48. Slide 48: Positive Data Center Outlook in Ontario

    Positive Data Center Outlook in Ontario The Ford government will approve its first swath of new AI data centres “sooner rather than later,” Doug Ford, Ontario Premier: "Through our new data centre playbook, our government is choosing to build the economy of the future that generate billions in econo

  49. Slide 49: Project Progress: Done, Underway, Next

    Project Progress: Done, Underway, Next Done Underway Next NEXT Big Boden, Sweden Definitive lease with the 25 MW IT · Tier III retrofit 32 MW building Tier III fit-test complete IG off-taker LOI, June 25, Definitive lease ~$200M retrofit, service IG off-taker purchased (~$12M) 2026 H2’27 Service tar

  50. Slide 50: TOR1: Toronto Airport

    7 MW TOR1: Toronto Airport $8M ARR as colo · 5 MW IT load · OR ~$80M ARR as GPU cloud • Acquired September 2025 at 5 MW IT Load site near Toronto Pearson, mining BTC today • Identified by management as attractive for government and military AI • Tier III conversion planned ~$40M retrofit estimate pe

  51. Slide 51: 320 MW GTA Giga Factory

    320 MW GTA Giga Factory $360M ARR target · 320 MW Utility Load · 240 MW IT Load · 100,000+ GPUs · ~CAD $3.5B capex · H1 2028 • Anchor asset for BUZZ HPC: 320 MW utility capacity designed to operate 100,000+ GPUs • Land secured: 25 acres ≈ $58M CAD total land cost with 320 MW power allocation • Toron

  52. Slide 52: 70 MW New Brunswick Campus

    70 MW New Brunswick Campus $85M ARR target · 50 MW IT load · conversion target 2027 • 70 MW energized and mining BTC today, earning while the HPC conversion advances • Grand Falls Network Upgrade underway dedicated 100 Gbps / 400 Gbps carrier fiber, delivery from Q3 2026 • Campus expansion : 64-acre

  53. Slide 53: Dual Engines: Today

    Dual Engines: Today $340M Dual Engine ARR ENGINE 1 · BITCOIN MINING ENGINE 2 · HPC / AI · BUZZ HPC $300M $40M ARR · FQ2 and since Q2 ARR live · ~$110k per day 5,500+ GPUs 11.0 23.8 16 J/TH $185M $600M $1B+ BTC mined per EH/s · October fleet efficiency ARR contracted TCV signed in TCV demand day aver

  54. Slide 54: 2026: $600M of GPU Cloud Contracts

    2026: $600M of GPU Cloud Contracts $40M ARR Live -> $185M ARR Contracted FEB 2026 · LIVE SINCE MAY JUN 2026 · DEPLOY Q4’26 AUG 2026 · DEPLOY Q4’26 Bell AI Fabric · B200 cluster Bell AI Fabric × Cohere · GB200 IG enterprise · GB300 $30M TCV · 2-year $225M TCV¹ · 3-year $350M TCV · 5-year 504 NVIDIA B

  55. Slide 55: HPC Revenue Roadmap

    HPC Revenue Roadmap Identified pipeline including $185M ARR contracted today GPU CLOUD HPC COLOCATION SITE GPUs LIVE FUNDED ARR SITE IT MW TIMING CAPEX ARR Quebec 850 H100/H200 Now Yes $15M Big Boden 25 2027 ~$200M⁴ $45M Stockholm 4,200 A-series Now Yes $10M New Brunswick 50 2027 n/d $85M Manitoba 5

  56. Slide 56: Dual Engines: Outlook

    Dual Engines: Outlook $500M combined ARR Target for Calendar Q1 2027 ENGINE 1 · BITCOIN MINING ENGINE 2 · HPC / AI · BUZZ HPC $300M $200M ARR · 24 EH/s at 16 J/TH · ARR target C1’27 · ~10,500 GPUs live (varies with hashprice) 11.0 23.8 16 J/TH $185M $600M $280M BTC mined per EH/s · October Fleet eff

  57. Slide 57: Looking Beyond: GPU Cloud Potential

    Looking Beyond: GPU Cloud Potential G P U C LO U D ▲ CLOUD STANDARDS H P C C O LO C AT I O N SITE GPUs TIMING ARR SITE IT MW TIMING ARR Quebec 850 H100/H200 Now $15M Big Boden 25 2027 $45M Stockholm 4,200 A-series Now $10M New Brunswick 50 2027 $85M Manitoba 504 B200 Now $15M Little Boden 5 2027 $7M

  58. Slide 58: EBITDA Outlook

    EBITDA Outlook SIGNED TODAY ARR / basis EBITDA % EBITDA ($M) GPU AI Cloud - signed $280M ARR 80% $225 HPC Colo - Boden lease3 $45M ARR 80% $35 Bitcoin Mining + BTC $300M ARR 34% $100 Projected ARR $625M ARR $350M 1. GPU AI Cloud and HPC Colocation at ~80% illustrative EBITDA margin (75–80% managemen

  59. Slide 59: Funded Through the Next Cluster

    Funded Through the Next Cluster 1 · NET CAPITAL RAISED IN 2026 2 · GPU FINANCING TERMS ANNOUNCED: COHERE DEAL $200M $129M of 2026 funding across two instruments · no shares issued GPU LOAN COMMITTED: FUNDS FROM LENDER WITH ESCROW AGENT $245M 0% coupon 3 year Term 9% Interest 125% capped calls April:

  60. Slide 60: Anatomy of a GPU Deal: Cohere via Bell

    Anatomy of a GPU Deal: Cohere via Bell $225M contract -> 80% financed at 9.0% fixed -> debt repaid inside the contract -> HIVE owns the GPUs 1 CONTRACT 2 HARDWARE 3 FINANCING $225M $165M $129M TCV · 3-year fixed term GB200 cluster cost 80% loan-to-cost · 9.0% fixed · 3 years Fully amortizing, no res

  61. Slide 61: Most Secured MW per $ of Market Cap

    Most Secured MW per $ of Market Cap HPC ARR target in line with miner peers valued 6–13x higher · IREN and NBIS in blue are the integrated-cloud comps TICKER MARKET CAP LTM REVENUE MW SECURED 2-YR FWD HPC ARR HIVE $0.5B $329M 860 $700M WULF $5.7B $191M 841 ~$970M CIFR $3.0B $146M 907 ~$750M HUT $6.3

  62. Slide 62: Signed Contracts: ~$1.4B EV Near Term

    Signed Contracts: ~$1.4B EV Near Term SIGNED TODAY ARR / basis Multiple Comp anchor Value ($M) GPU AI Cloud - signed $185M ARR 3.4x1 GPU median: 3.4x $640 HPC Colo - Boden lease3 $45M ARR 6.7x2 HPC median: 6.7x $300 Bitcoin Mining + BTC $300M ARR — MARA / CLSK $500 Signed-Contract EV $530M ARR 2.7x

  63. Slide 63: Sum-of-the-Parts: GPU Cloud + GTA Gigafactory

    Sum-of-the-Parts: GPU Cloud + GTA Gigafactory Signed Base case — conservative multiples on target ARR SEGMENT DRIVER MULTIPLE VALUE ($M) $3.9B GPU AI Cloud HPC Colo incl. GTA ($360M) $200M ARR target $500M ARR target 2.0x base case 6.0x base case $400 $3,000 IMPLIED EV — BASE CASE 7.4x upside vs. $5

  64. Slide 64: Follow HIVE on Social Media

    Follow HIVE on Social Media @HIVEDigitalTech @HIVEDigitalTech @hivedigitaltechnologies Visit our website at www.hivedigitaltechnologies.com

  65. Slide 65: Appendix

    Appendix Vas!

  66. Slide 66: SOTP Valuation: Peer Multiples

    SOTP Valuation: Peer Multiples Ticker EV ($M) ARR Tgt / LTM Rev EV / Base Peer Median HIVE @ Median MARA $2,442 $868 2.8x CLSK $2,362 $740 3.2x Multiples for MINING → HIVE $300M Rev 3.0x $900 CRWV3 $54,315 $18,500 2.9x • Mining NBIS3 $38,163 $8,000 4.8x • GPU IREN4 WYFI5 $8,601 $676 $4,380 $170 2.0x

  67. Slide 67: Mining Margin at 24 EH/s + 16 J/TH

    Mining Margin at 24 EH/s + 16 J/TH October 2026 actual: 23.8 EH/s average · $37.90 realized hashprice · ~$900k/day · 339.8 BTC mined — tracking the $80k column Metric $70k BTC $80k BTC $90k BTC Hashprice $32 HP $37 HP $41 HP Daily Revenue $770k $880k $990k Bitcoin Mined per Day ² 11.0 11.0 11.0 Dail

  68. Slide 68: 32 MW Boden Data Center Purchase

    32 MW Boden Data Center Purchase $45M ARR target · 25 MW IT load · H2 2027 • HIVE’s original GPU super-site - operated 130,000 GPUs in the Ethereum mining era • HIVE operating since 2018 jurisdiction, Tier I data center operational + investments in community • Fit-test for Tier III complete; enginee

  69. Slide 69: Canadian AI Compute Access Fund: Buzz x ProCogia

    Canadian AI Compute Access Fund: Buzz x ProCogia GOVERNMENT OF CANADA · ISED AI COMPUTE ACCESS FUND · COVERS UP TO 2/3 OF CANADIAN COMPUTE COSTS COMPUTE SUPPLIER FUND RECIPIENT BUYS DEDICATED GPU CAPACITY Sovereign Tier-III Applied-AI delivery: DELIVERS AI SERVICES TO CLIENTS GPU infrastructure LLMs

  70. Slide 70: São Paulo to Yguazú

    São Paulo Yguazú 1h 50m Nonstop flight, São Paulo (GRU) → Foz do Iguaçu (IGU) · multiple daily frequencies 846 km / 526 mi Direct air distance — shorter than SFO → Seattle ~1 hour Drive from IGU to the Yguazú campus via Ciudad del Este Same day Map stylized, not to survey scale. Board in São Paulo a

HIVE Digital Technologies — Q2 FY2027 Earnings Presentation on 6ix