Australian Pacific Coal Limited · ASX:AQC
Australian Pacific Coal — Investor Presentation (April 2018)
17 slides from Australian Pacific Coal's investor presentation, Apr 3, 2018
Slide 1: Australian Pacific Coal Corporate Presentation
For personal use only Australian Pacific Coal Corporate Presentation April 2018
Slide 2: Disclaimer
Disclaimer This presentation and all attachments and appendices (‘the presentation’) has been prepared by the management of Australian Pacific Coal Limited (‘Australian Pacific Coal’ or ‘the Company’) in connection with meetings For personal use only with investment banks, financial intermediaries a
Slide 3: Competent Persons Statement
Competent Persons Statement Marketable Reserves Note For personal use only The Dartbrook Marketable Coal Reserve of 370Mt is derived from a run of mine Coal Reserve of 470 Mt estimated in accordance with JORC 2012 with a predicted overall yield of 78%. The 370Mt Marketable Coal Reserve is included i
Slide 4: Company Overview
Company Overview Australian Pacific Coal (ASX:AQC) owns coal assets in Dartbrook Coal Resource1 (Mt) For personal use only Queensland and New South Wales, with the key asset being the Dartbrook Coal Mine (Dartbrook) located in Measured Indicated Inferred Total the well renowned Hunter Valley of Ne
Slide 5: Board & Management
For personal use only Board & Management Management John Robinson Mr Andrew Roach Chief Executive officer & Managing Director Chief Financial Officer & Company Secretary Mr Robinson has led numerous public and private Mr Roach has over 10 years' experience in the equity acquisitions in the mining, p
Slide 6: Investment Highlights
Investment Highlights Size and quality of • Coal Resource 2,534 Mt and Coal Reserve 370 Mt For personal use only 1 the Dartbrook Mine • Well understood geology and mining conditions, similar to neighbouring mines • Prior ~12 year operating history with high quality thermal coal exports to Asia • Cur
Slide 7: Location of QLD Assets
Location of QLD Assets Mt Hillalong1 For personal use only The Mount Hillalong project targets the Rangal and Fort Cooper coal measures in the northern Bowen Basin. The project offers prospectivity for proving underground resources of metallurgical coal in the Rangals and open cut coal in the Fort C
Slide 8: Dartbrook: Hunter Valley Location
Dartbrook: Hunter Valley Location Dartbrook is located in the upper Hunter Valley For personal use only in New South Wales, Australia. Muswellbrook is the closest major town, approximately 10 km to the southeast. The town of Aberdeen lies approximately 4.5 km northeast of Dartbrook. Dartbrook is
Slide 9: Pre-Feasibility Study Completed
Pre-Feasibility Study Completed 1 Study Snapshot Unit Owner Contractor Operator Case The Open Cut Prefeasibility Study (OC PFS), For personal use only Case completed by AQC in March 20181, confirms the technical and financial capability as a nominally 10 Mtpa run of mine operation for 25 years. Pr
Slide 10: Stable, Low Cost of Production
Stable, Low Cost of Production Annual Production and ROM Strip Ratio (Life of Mine) Production profile shows ramp-up For personal use only 50,000 10.0x achieved by year 4 of coal mining 45,000 9.0x ROM coal production sustained around Strip Ratio (waste bcm / ROM t) 40,000 8.0x 10 Mtpa over life
Slide 11: High Quality Thermal Coal
High Quality Thermal Coal The Dartbrook Mine can produce two high As Received Basis Dartbrook Dartbrook For personal use only (unless stated Premium Product Standard Product energy coal products: otherwise) ‒ “Premium” thermal coal (~12% ash) ‒ “Standard” thermal Coal (~19% ash) Specific Energy 6,
Slide 12: Marketability & Logistics
Marketability & Logistics Dartbrook previously exported 25 Mt of coal For personal use only primarily to Japanese and Korean markets The demand for coal with similar qualities to Dartbrook's high energy coal continues to play a major role in the global energy markets Close proximity to the Por
Slide 13: Existing Infrastructure
Existing Infrastructure CHPP has been well maintained and is in For personal use only good condition since Dartbrook was placed on a care and maintenance basis in 2006/2007. Surface infrastructure includes power, water and office facilities. Existing on-site Train Load Out facility and rail lo
Slide 14: Community & Benefits
For personal use only Community & Benefits Dartbrook’s development will deliver substantial benefits to the local and wider community, including over 550 direct full time jobs during its 25 year operational life. It will also significantly benefit various levels of government, including an estim
Slide 15: Outlook for the Hunter Valley
Outlook for the Hunter Valley Dartbrook coal is typical of other high quality Hunter Valley coals which are currently sold into the global For personal use only seaborne export market. Demand for this high quality product is projected to steadily increase steadily as markets focus on High Energy L
Slide 16: Indicative Dartbrook Open Cut Timeline
Indicative Dartbrook Open Cut Timeline CUT only 1H 2019 2020 - 2022 DFS phase Construction use 2H 2022 1H 2018 2H 2020 First Coal Open Cut PFS Review and Approvals OPEN 1H 2017 1H 2019 EIS and For personal Dartbrook DFS complete Acquisition 2017 2018 2019 2020 2021 2022 2023 16 Note: Calendar Year b
Slide 17: Company Contact Information
For personal use only Company Contact Information ASX code: AQC General Enquiries: Head Office: Andrew Roach Level 4, 10 Felix Street Company Secretary Brisbane QLD 4000 Email: cosec@aqcltd.com Phone: +61 7 3221 0679 Fax: +61 7 3229 9323 Media Enquiries: Website: www.aqcltd.com Chris Ford Email: med