New Murchison Gold Limited · ASX:NMG
New Murchison Gold — Shareholder Meeting (November 2026)
29 slides from New Murchison Gold's shareholder meeting presentation, Nov 24, 2026

Slide 1: CEO Presentation to AGM
rsonal use only Growth Focused Murchison Gold Producer CEO Presentation to AGM 24 November 2026

Slide 2: Important Information
IMPORTANT INFORMATION Important – you must read the following before continuing JORC Compliance Statement – Exploration Results This investor presentation ("Presentation") is dated 20 July 2026 and has been prepared by New Murchison Gold Limited (ACN 950 465 564) (ASX:NMG) (“NMG" or "the Company").

Slide 3: Investment Highlights
INVESTMENT HIGHLIGHTS A profitable gold producer with multiple near-term growth catalysts rsonal use only PRODUCING CASH GENERATING RESOURCE GROWTH1 EXPANDING 65,789oz A$220.4m 353,700oz Multiple Produced trailing 12 months Cash (end of Sept) Resource base +47% increase last 12 months catalysts • Cr

Slide 4: Corporate Snapshot
CORPORATE SNAPSHOT Capital Structure (23 November 2026) Share Price Performance NMG:ASX Current 0.1 200 Share Price A$0.044 0.09 180 0.08 160 Ordinary Shares on Issue 10,967m rsonal use only 0.07 140 Options & Performance Rights 532m 0.06 120 Market Capitalisation (undiluted) $482.58m 0.05 100 Cash

Slide 5: Garden Gully Gold Project
GARDEN GULLY GOLD PROJECT NMG controls a highly prospective 617km² land package surrounding operating mine, Crown Prince, with multiple deposits capable of leveraging existing infrastructure. rsonal use only Crown Prince OPERATING MINE Cash-generating operation • Funding future growth Cloudkicker NE

Slide 6: Crown Prince - Strong Cash Generation
CROWN PRINCE - STRONG CASH GENERATION Commercial production has transformed NMG into a debt-free, cash-generating gold producer with full exposure to record gold prices. rsonal use only OPERATIONAL PERFORMANCE Quarter 10,832 oz Gold Sold ~A$220M Gold in ore sold for September 2026 Quarter 65,789 oz

Slide 7: Crown Prince Open Pit
CROWN PRINCE OPEN PIT Mining and crushing at Crown Prince continues to translate strongly into ore parcel sales Quarters Dry Tonnes Grade (Au) Agreed Recovery Ounces rsonal use only First month – Sept. 2025 31,047 3.3g/t 96.8% 3,231 December 2025 184,746 4.0g/t 95.9% 22,837 March 2026

Slide 8: Exploration & Growth
EXPLORATION & GROWTH rsonal use only 8 newmurchgold.com.au

Slide 9: Updated Mineral Resource Estimate (September 2026)
UPDATED MINERAL RESOURCE ESTIMATE (September 2026) A significant, JORC-compliant update to the Mineral Resource Estimate (MRE) at its flagship Garden Gully Gold Project, located near Meekatharra, Western Australia. rsonal use only • Insitu Mineral Resource Estimate (MRE) increased by 97% to a total

Slide 10: Crown Prince Underground Potential Confirmed
CROWN PRINCE UNDERGROUND POTENTIAL CONFIRMED Extensional drilling program below Crown Prince rsonal use only open pit delivers high grade gold intercepts demonstrating underground potential.* 3.2m at 48.9g/t Au from 330m including 0.35m at 345.5g/t Au from 331.2m Photo: Visible gold within a boudin

Slide 11: Crown Prince Underground Potential Confirmed - High-Grade Intersection
CROWN PRINCE UNDERGROUND POTENTIAL CONFIRMED HIGH-GRADE GOLD INTERSECTION EXTENDS CROWN PRINCE rsonal use only Drilling intersects 14m @ 231.67g/t Au beneath the Crown Prince open pit Highlights • Near mine resource extension drilling at Crown Prince has returned a significant high-grade gold inters

Slide 12: 14m @ 231.67g/t Au in CPRC030
CROWN PRINCE UNDERGROUND POTENTIAL CONFIRMED rsonal use only 14m @ 231.67g/t Au incl. 1m @ 2,860g/t Au in CPRC030 – highest-grade RC sample recorded at Garden Gully Cross-section A–A’ (looking ENE, ±25m) through CPRC030 showing current MRE wireframes (blue solids) and grade on traces. 12 *ASX Announ

Slide 13: Crown Prince Mineral Resource Estimate
CROWN PRINCE MINERAL RESOURCE ESTIMATE Block Model Resource Classification rsonal use only Crown Prince OP MRE – shown with 0.5g/t cutoff and pit shell. Crown Prince UG MRE – shown with 1.2g/t cutoff and pit shell. Deposit Mineral Resource Cut Off Tonnes Grade (g/t AU) Contained Gold (Oz) Measured 0

Slide 14: Extending & Expanding Crown Prince Operations
EXTENDING & EXPANDING CROWN PRINCE OPERATIONS Crown Prince Underground Potential Along Strike Potential rsonal use only Recent drilling and updated interpretations at Cloudkicker indicate the 1,000m strike length between the two deposits remains poorly tested by drilling below 40m vertical depth. Sc

Slide 15: Cloudkicker Deposit Delivers High-Grade Gold Intercepts
CLOUDKICKER DEPOSIT DELIVERS HIGH-GRADE GOLD INTERCEPTS rsonal use only Q3 drilling at Cloudkicker (M51/886) returned positive assays confirming shallow, high-grade gold mineralisation with better grades and widths than recent estimates. Best intersections from this drilling program include: • 10m @

Slide 16: Cloudkicker, Production Growth
CLOUDKICKER, PRODUCTION GROWTH Cloudkicker highlights NMG’s capacity to quickly rsonal use only turn exploration success into production by leveraging existing infrastructure. +20koz Additional Gold Production Over the next 12-18 months • Immediately adjacent to Crown Prince • Utilises established m

Slide 17: Cloudkicker Mineral Resource Estimate
CLOUDKICKER MINERAL RESOURCE ESTIMATE Block Model Resource Classification rsonal use only Cloudkicker OP MRE – shown with 0.5g/t cutoff and pit shell Deposit Mineral Resource Cut Off Tonnes Grade (g/t AU) Contained Gold (Oz) Indicated 0.5g/t 341,000 2.3 25,100 Cloudkicker Inferred 0.5g/t 159,000 1.2

Slide 18: Lydia, Nearby & Incremental Growth
LYDIA, NEARBY & INCREMENTAL GROWTH Recent results confirm Lydia's high-grade deposits sitting on the doorstep of Crown Prince Operations. rsonal use only High-grade standout hits such as 24.36g/t and 14.53g/t Au provide good scope for increasing the overall resource grade we currently have. Lydia Ma

Slide 19: Lydia Main Long Section
LYDIA MAIN LONG SECTION Plunging shoots in NNE-SSS plane of mineralisation rsonal use only Lydia Main long section (looking 284°) covers about 430m along a 014° trend, with mineralisation traced from surface (~481mRL) to ~275mRL, more than 200m below surface. The section defines a large, continuous

Slide 20: Lydia & Abbotts Mineral Resource Estimate
LYDIA & ABBOTTS MINERAL RESOURCE ESTIMATE Block Model Resource Classification Block Model rsonal use only Resource Classification Lydia OP MRE – shown with 0.5g/t cutoff and pit shell Mineral Grade (g/t Contained Deposit Cut Off Tonnes Resource AU) Gold (Oz) Measured 0.5g/t 2,000 17.1 1,100 Indicate

Slide 21: Further Exploration Potential
FURTHER EXPLORATION POTENTIAL Highly strategic belt-scale tenure holding rsonal use only • NMG’s projects are located in the highly prospective Abbotts Greenstone Belt, near Meekatharra, Western Australia. ◦ The Abernethy shear zone is a major regional structure which runs through the eastern part o

Slide 22: Airstrip & Abernethy Shear Zone
AIRSTRIP & ABERNETHY SHEAR ZONE Gold mineralisation along a corridor approximate 5km long Airstrip is located on the Abernethy Shear zone, on the eastern limb of the Abbotts rsonal use only greenstone belt, where drilling has now intersected gold mineralisation along a corridor approximately 5km lon

Slide 23: Airstrip Mineralised Strike Length ~730m
AIRSTRIP MINERALISED STRIKE LENGTH ~730M Airstrip East strike more than doubled rsonal use only • Drilling at Airstrip East delivers: ◦ 20m @ 2.51 g/t Au returned from 50m, including 2m @ 9.83 g/t Au from 53m (APSRC118). ◦ New zone is located 275m east of NGGSRC984 which returned 20m @3.36 g/t Au fr

Slide 24: Delivering on Strategy
DELIVERING ON STRATEGY Management has transitioned NMG from explorer to cash-generating producer while continuing to grow the resource base and development pipeline. rsonal use only 2024 2025 2026 Next DELIVERING RESULTS REMAINING RESOURCES 353 koz RESOURCE GROWTH RESOURCE CROWN PRINCE GOLD PRODUCTI

Slide 25: Thank You
Thank You rsonal use only 25 newmurchgold.com.au newmurchgold.com.au

Slide 26: Appendix A - Group Mineral Resource Estimate
Appendix A Group Mineral Resource Estimate, depleted to 30 June 2026 Deposit Mineral Resource Cut Off Tonnes Grade (g/t AU) Contained Gold (Oz) rsonal use only Measured 0.5g/t 263,000 3.5 29,400 Indicated 0.5g/t 360,000 3.3 37,900 Crown Prince OP Inferred 0.5g/t 14,000 0.8 400 Stockpiles 190,000 0.8

Slide 27: Appendix B - Crown Prince Ore Reserve Estimate
Appendix B Crown Prince Ore Reserve Estimate at 30 June 2026 rsonal use only Contained Gold (oz Cut-off Grade (g/t Deposit Category Tonnes (t) Grade (g/t Au) Au) Au) Crown Prince OP Probable 640,000 3.1 65,000 0.7 Cloudkicker OP Probable 310,000 2.2 21,000 0.7 Crown Prince stockpiles Proven 190,000

Slide 28: Competent Person Statement
Competent Person Statement Exploration Results Information in this Announcement that relates to results is based upon work undertaken by Mr Alexander Johnston a Competent Person who is a Member of the Australian rsonal use only Institute of Geoscientists (AIG). Mr Johnston has sufficient experience

Slide 29: Contact Details
rsonal use only Alex Passmore | CEO (08) 9389 6927 info@newmurchgold.com.au Level 1, 16 Ord St West Perth WA 6005
Source: ASX announcement, Nov 24, 2026
More decks from New Murchison Gold Limited
JMM Noosa Investor Lunch July 202622 slides · Jul 20, 2026
RIU Conference (February 2026)21 slides · Feb 16, 2026
Shareholder Meeting (August 2025)32 slides · Aug 15, 2025
Investor Presentation (May 2025)32 slides · May 2025
Investor Presentation (February 2025)30 slides · February 2025
Investor Presentation (November 2024)24 slides · November 2024