Canadian Copper, Inc. · CSE:CCI

Canadian Copper — Investor Presentation (August 2023)

17 slides from Canadian Copper's investor presentation, Aug 9, 2023

  1. Slide 1: New Asset, Continued Critical Mineral Growth

    9 AUGUST 2023 New Asset, Continued Critical Mineral Growth COPPER EXPLORATION Excellent Mining Jurisdiction & DEVELOPMENT IN PROLIFIC Net Zero Exploration & Development BATHURST CAMP Strong Asset Base New Brunswick, Canada Growing Copper Resources 1

  2. Slide 2: Disclaimer

    9 AUGUST 2023 DISCLAIMER Forward-Looking Information and Statements consideration applied to them. There is no certainty that the PEA will be realized. This presentation contains “forward-looking information” for purposes of applicable Canadian Mr. Eugene Puritch, P.Eng., FEC, CET, President of P&E

  3. Slide 3: Ownership, Financing & Capitalization

    9 AUGUST 2023 OWNERSHIP, 12% FINANCING & CAPITALIZATION C A P I TA L S T R U C T U R E Share Price (C$) $0.12 49% 39% Current S/O 83.3M Average Volume 50K Market Cap $10.0M Cash $.600M Warrants 7.2M Options 1.6M Fully Diluted 92.1M Retail Investors Founders and Management Puma Exploration Inc. 3

  4. Slide 4: A Compelling Investment Case for Copper

    9 AUGUST 2023 A COMPELLING INVESTMENT CASE FOR COPPER & copper and base metal explorers MARKET DEFICIT GREEN ENERGY TRANSITION DEMAND DIVERSIFICATION • Global copper demand to • Renewable power consumes • Industrial nations exceed supply by six million +4x more copper committed to tonnes by 2030 dec

  5. Slide 5: Canadian Copper's Acquisition Is Accretive to Shareholders

    9 AUGUST 2023 CANADIAN COPPER’S ACQUISITION IS ACCRETIVE TO SHAREHOLDERS Majority ownership of large, Drives synergies with open pit, 18Mt deposit (680 Company deposits in the MlbsCuEq*) region, near two former mines 98% of Murray Brook Mineral Increased leverage to critical Resources are Measured a

  6. Slide 6: Deal Overview

    9 AUGUST 2023 DEAL OVERVIEW • Canadian Copper (“CCI”) to acquire 100% of Votorantim’s (“VOT”) interest in Murray Brook Project (“MB”). • Transaction Summary (680M CuEq for $0.007/CuEqlb!): o $1.0M cash o $2.0M bond assumption o 2M CCI shares, 2M CCI warrants & 0.25% NSR o $2M at commercial productio

  7. Slide 7: Canadian Copper: Pure Play Base Metals, Growing Resources, Safe Jurisdiction

    9 AUGUST 2023 CANADIAN COPPER: PURE PLAY BASE METALS, GROWING RESOURCES, SAFE JURISDICTION GROWING RESOURCE BASE + KEY ASSET PURCHASE + DE-RISK, ACCELERATE, EXPLORE** Before: M&I Growth Now: Murray Brook Deposit** Chester Project* Zinc Copper 810 +575% 43% 40% 120 Metal 100 +20% Contribution CuEq (M

  8. Slide 8: Expanded Project Portfolio

    9 AUGUST 2023 EXPANDED PROJECT PORTFOLIO Bathurst Mining Camp BELLEDUNE DEEP WATER PORT TURGEON PROJECT Estimated 75M lb Cu+ MURRAY BROOK DEPOSIT Chaleurs Bay M+I 18Mt @ 2.73% Zn, 0.47% Cu, 1.0% Pb, 41 g/t Ag, 0.65 g/t Au Caribou Mine Fully available operating BATHURST milling facility, <10km LEGACY

  9. Slide 9: Murray Brook Situated Between Two Former Producing Mines and a Mill

    9 AUGUST 2023 MURRAY BROOK SITUATED BETWEEN TWO FORMER PRODUCING MINES AND A MILL 9

  10. Slide 10: Cheaper to Buy Than Find

    9 AUGUST 2023 CHEAPER TO BUY THAN FIND How much would it cost to replicate Murray Brook resources? Chester Resource Estimate in 2022 Cost to Add Murray Brook Mineral Resource Increased by 50M lbs CuEq Add +680MM lbs CuEq @ 1.6% Cu Exploration budget = $500K Required exploration Budget = $6.8M Discov

  11. Slide 11: Recoveries, Material Handling, US/CAD$: Will Increase Project Return

    9 AUGUST 2023 RECOVERIES, MATERIAL HANDLING, US/CAD$: WILL INCREASE PROJECT RETURN McIlvenna Bay Murray Brook (Open Pit)* (Underground)** Canadian Copper Market Cap = C$8M Foran Mining Market Cap = C$800M Daily Throughput (tpd) 6,000tpd Daily Throughput (tpd) 4,200tpd Annual Throughput Annual Throug

  12. Slide 12: Path to Value Enhancement

    9 AUGUST 2023 PATH TO VALUE ENHANCEMENT PROJECT WORK SINCE 2013 PEA INCLUDES* • Seven Met Holes • Four Geotech • New Met Testing $3M in Capital • Haulage Study & • Ground Water 6 Months to • Slope Stability Complete • TSF Study • ABA Testing RECOVERY OPTIMIZATION** -2% +57% 100 +86% 89 87 2013 PEA M

  13. Slide 13: Project Advancement Schedule

    9 AUGUST 2023 PROJECT ADVANCEMENT SCHEDULE WORK Q3/23 Q4/23 Q1/24 Q2/24 Q3/24 Q4/24 2025 New Mineral Resource <3MON Estimate New PEA <6–9MON <3MON Exploration <3MON Met. Optimization <6 MON Permitting Review <6 MON Present Development Plan to Provincial Government 13

  14. Slide 14: Potential at Depth

    9 AUGUST 2023 POTENTIAL AT DEPTH 1 6 15 02 6 9 01 2- 06 -1 4 12 -5 7- 01 9- 7 12 12 2- 11 01 B2 01 3 0 12 - 20 1 B2 0 B2 B2 1- B2 M M MB2012-156 NE 39 B2 01 M B2 0 M B M M SW A’ 57 1- M A 61 -6 3 1- 01 M 9 -1 01 B2 -7 12 12 2 0 B2 0 B2 M 01 B2 M B2 M 3.81%Cu over 25.05m M M Incl. 5.48% over 10.35m 7

  15. Slide 15: Near-Surface Targets

    9 AUGUST 2023 NEAR-SURFACE TARGETS 2 MB2019-02 MB2018-03 MB2012-65 0.82%Cu over 34.0m 0.79%Cu, 2.95% Pb-Zn, 29 0.81%Cu, 2.20% Pb-Zn, 33 g/t Incl. 1.42%Cu, 0.15g/t g/t Ag over 99.6m Ag, 0.55 g/t Au over 81.8m Au over 16.3m Incl. 3.04% over 19.0m Incl. 4.07% over 11.0m Cu (%) OPEN 2 8 Zn (%) 0 9- 15 0

  16. Slide 16: MB Two Year Plan

    9 AUGUST 2023 MB TWO YEAR PLAN Integrate valuable engineering studies to new PEA Additional met testing: target metal recovery improvements Complete trade-offs in PEA – toll milling, material handling Test western & eastern extensions – 5,000 meters Review regional exploration targets across 18km pr

  17. Slide 17: Appendix A: 2013 Mineral Resource

    9 AUGUST 2023 APPENDIX A: 2013 MINERAL RESOURCE 18 *MB PEA 2013

Canadian Copper — Investor Presentation (August 2023) on 6ix