  1. Slide 1: 2023 Electric Integrated Resource Plan

    2023 Electric Integrated Resource Plan Technical Advisory Committee Meeting No. 6 Agenda Wednesday, September 28, 2022 Microsoft Teams Virtual Meeting Topic Time Staff Introductions 12:30 John Lyons Supply Side Resource Cost Assumptions, including DER 12:40 IRP Team Variable Energy Resource Integrat

  2. Slide 2: IRP Introduction

    IRP Introduction 2023 Avista Electric IRP TAC 6 – September 28, 2022 John Lyons, Ph.D. Senior Resource Policy Analyst

  3. Slide 3: Meeting Guidelines

    Meeting Guidelines • IRP team is working remotely and is available for questions and comments • Stakeholder feedback form • Responses shared with TAC at meetings, by email and in Appendix • Would a form and/or section on the web site be helpful? • IRP data posted to web site – updated descriptions a

  4. Slide 4: Virtual TAC Meeting Reminders

    Virtual TAC Meeting Reminders • Please mute mics unless commenting or asking a question • Raise hand or use the chat box for questions or comments • Respect the pause • Please try not to speak over the presenter or a speaker • Please state your name before commenting • Public advisory meeting – comm

  5. Slide 5: Integrated Resource Planning

    Integrated Resource Planning The Integrated Resource Plan (IRP): • Required by Idaho and Washington* every other year • Washington requires IRP every four years and update at two years • Guides resource strategy over the next twenty + years • Current and projected load & resource position • Resource

  6. Slide 6: Technical Advisory Committee

    Technical Advisory Committee • Public process of the IRP – input on what to study, how to study, and review of assumptions and results • Wide range of participants involved in all or parts of the process • Please ask questions • Always soliciting new TAC members • Open forum while balancing need to

  7. Slide 7: Remaining 2023 Electric IRP TAC Meeting Schedule

    Remaining 2023 Electric IRP TAC Meeting Schedule • TAC 7: October 11, 2022, 9 am – 3:30 pm • Technical Modeling Workshop: October 20, 2022 • Washington Progress Report Workshop: December 14, 2022 • TAC 8: February 16, 2023 • Public Meeting Gas & Electric IRPs: March 8, 2023 • TAC 9: March 22, 2023 6

  8. Slide 8: Today's Agenda

    Today’s Agenda 12:30 Introductions, John Lyons 12:40 Supply Side Resource Cost Assumptions, Avista IRP Team 1:45 Variable Energy Resource Integration Study Update, Lori Hermanson Break 2:30 All-Source RFP Update, Chris Drake 2:45 Global Climate Change Studies, Impacts to Avista Loads & Resources, Mi

  9. Slide 9: Supply Side Resource Options

    Supply Side Resource Options Resources Considered Avista IRP Team Electric IRP, 6th Technical Advisory Committee Meeting September 28, 2022

  10. Slide 10: Inflation Reduction Act

    Inflation Reduction Act Tom Pardee, Natural Gas Planning Manager Electric IRP, 6th Technical Advisory Committee Meeting September 28, 2022

  11. Slide 11: IRA Overview

    IRA Overview • Signed August 16, 2022, and became Public Law No: 117- 169 • New “technology-neutral” clean electricity production and investment credits • Extension and expansion of the renewable electricity production tax credit (PTC) and energy tax credit (ETC) • Zero-emissions nuclear power produ

  12. Slide 12: IRA Details

    IRA Details • $14,000 in direct consumer rebates for heat pumps or other energy efficient home appliances ($2,000 annual credit against tax liability) • Up to $7,500 in tax credits for new electric vehicles and $4,000 for used electric vehicles • Production Tax Credits – (Geothermal, Wind and Biomas

  13. Slide 13: Not Modeled / Modeled But Covered in TAC 7

    Not Modeled • Renewable Natural Gas (RNG) • Carbon Capture • Synthetic Methane • Biodiesel • Non-Commercial Technologies Modeled But Covered in TAC 7 • Ammonia • Hydrogen 7

  14. Slide 14: Supply Side Resource Options

    Supply Side Resource Options Resources Considered Michael Brutocao, Natural Gas Analyst Electric IRP, 6th Technical Advisory Committee Meeting September 28, 2022

  15. Slide 15: Overview & Considerations

    Overview & Considerations • The assumptions discussed are “today’s” estimates – likely to be periodically revised. • IRP supply-side resources are commercially available technologies with potential for development within or near Avista service territory. • Resource costs vary depending on location,

  16. Slide 16: Proposed Natural Gas Resource Options

    Proposed Natural Gas Resource Options Peakers Baseload • Simple Cycle Combustion Turbine • Combined Cycle CT (CCCT) (CT) – 312 MW (1x1 w/DF) – CT Frame – 180 MW • Reciprocating Engines – 185 MW Natural gas turbines are modeled using a 30-year life with Avista ownership 10

  17. Slide 17: Renewable Resource Options - Solar

    Renewable Resource Options - Solar All Purchase Power Agreement (PPA) Options Solar • Residential (6 kW AC) • On-System Single Axis Tracking Array – New & existing (100 MW AC) – With & without battery – With & without 100 MW 4-hour lithium-ion battery • Commercial (1 MW AC) – With 100 MW 2-hour lith

  18. Slide 18: Renewable Resource Options - Wind

    Renewable Resource Options - Wind All Purchase Power Agreement (PPA) Options Wind • On-system wind (100 MW) • Off-system wind (100 MW) • Montana wind (100 MW) • Offshore wind (100 MW) – Share of a larger project 12

  19. Slide 19: Other Clean Resource Options

    Other “Clean” Resource Options • Geothermal PPA (20 MW) – Off-system PPA • Biomass (58 MW) – i.e. Kettle Falls 3 or other • Nuclear PPA (100 MW) – Off-system PPA share of a mid-size facility • Renewable Hydrogen – Fuel Cell (25 MW) • Ammonia (74 MW) – Natural Gas Turbine 13

  20. Slide 20: Storage Technologies

    Storage Technologies Lithium-Ion Other Storage Options • Assumes: 86% round trip efficiency (RTE), 15- • Assumes Avista ownership year operating life • 25 MW Vanadium Flow (70% RTE) • Assumes Avista ownership – 4 hours (100 MWh) • 5 MW Distribution Level • 25 MW Zinc Bromide Flow (67% RTE) – 4 hours

  21. Slide 21: Resource Upgrades

    Resource Upgrades • Rathdrum CT [natural gas peaker] – 5 MW by 2055 uprates – 10 MW Inlet Evaporation 15

  22. Slide 22: Supply Side Resource Options: Capital Costs

    Supply Side Resource Options Capital Costs Michael Brutocao, Natural Gas Analyst Electric IRP, 6th Technical Advisory Committee Meeting September 28, 2022

  23. Slide 23: Fueled Generation

    Fueled Generation 17 Nominal $

  24. Slide 24: Geothermal & Nuclear

    Geothermal & Nuclear 18 Nominal $

  25. Slide 25: Storage

    Storage 4 hr Vanadium Flow Battery . 4 hr Zinc Bromide Flow Battery ° 4hr Lithium-Ion Distribution Scale Distribution Scale Shr Lithium-Ion — ’ 1,637 3,002 2025 2030 4hr Lithium-Ion [e) Shr Lithium-Ion 2 800 1,000 1,200 1,400 1,600 ° 2,334 1,800 2,000 2,200 2,400 2,600 2,800 3,000 3,200 Capex $ per

  26. Slide 26: Storage Continued

    Storage Continued 20 Nominal $

  27. Slide 27: Solar + Storage

    Solar + Storage 50 MW/200 MWh Lithium-ion w/Solar (Battery .. 100 MW/200 MWh Lithium-ion w/Solar Battery .. 100 MW/400 MWh Lithium-ion w/Solar (Battery .. Solar Photovoltaic ns Fixed Array (5 MW AC) + Storage (Ba.. Commercial Solar + Storage (Battery 4.324 4821 5,375 500 1,000 1,500 2,000 2,500 3,00

  28. Slide 28: Solar PPA

    Solar PPA Solar Photovoltaic w/Single Axi.. Southern NW Solar Photovoltaic .. Solar Photovoltaic Fixed Array (.. Commercial Solar New Residential Solar Existing Residential Solar 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 Capex $ per kW 2025 ™ 2030 @ 2035 m 204

  29. Slide 29: Wind PPA

    Wind PPA Off Shore Wind (Share) 5,486 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 Capex $ per kW m 2025 m™ 2030 @ 2035 m 2040 2045 Real$ 2020 23 EEE SSE Nominal $ 5,873 6,000 6,500

  30. Slide 30: Upgrades & Biomass

    Upgrades & Biomass 24 Nominal $

  31. Slide 31: Supply Side Resource Options: Levelized Costs

    Supply Side Resource Options Levelized Costs Michael Brutocao, Natural Gas Analyst Electric IRP, 6th Technical Advisory Committee Meeting September 28, 2022

  32. Slide 32: Natural Gas Fixed & Variable Costs – nominal $ (Idaho)

    Natural Gas Fixed & Variable Costs – nominal $ (Idaho) 26

  33. Slide 33: Natural Gas Fixed & Variable Costs – nominal $ (Washington)

    Natural Gas Fixed & Variable Costs – nominal $ (Washington) 27

  34. Slide 34: Facility Upgrade Cost Analysis – nominal $

    Facility Upgrade Cost Analysis – nominal $ 28

  35. Slide 35: Storage Cost Analysis – nominal $

    Storage Cost Analysis – nominal $ 29

  36. Slide 36: Fueled Generation Fixed Cost (Levelized) - Idaho

    Fueled Generation Fixed Cost (Levelized) - Idaho Nominal $ 30

  37. Slide 37: Fueled Generation Fixed Cost (Levelized) - Washington

    Fueled Generation Fixed Cost (Levelized) - Washington Nominal $ 31

  38. Slide 38: Geothermal/Nuclear Implied Energy Payment (Levelized)

    Geothermal/Nuclear Implied Energy Payment (Levelized) Nominal $ 32

  39. Slide 39: Storage Fixed Cost (Levelized)

    Storage Fixed Cost (Levelized) Nominal $ 33

  40. Slide 40: Storage Fixed Cost (Levelized) Continued

    Storage Fixed Cost (Levelized) Continued… Nominal $ 34

  41. Slide 41: Storage Implied Capacity Payment (Levelized)

    Storage Implied Capacity Payment (Levelized) Nominal $ 35

  42. Slide 42: Solar PPA Price/Implied Energy Payment (Levelized)

    Solar PPA Price/Implied Energy Payment (Levelized) Nominal $ 36

  43. Slide 43: Wind PPA Price/Implied Energy Payment (Levelized)

    Wind PPA Price/Implied Energy Payment (Levelized) Nominal $ 37

  44. Slide 44: Upgrades & Biomass Fixed Cost (Levelized)

    Upgrades & Biomass Fixed Cost (Levelized) Nominal $ 38

  45. Slide 45: Excel Workbook – Methodology and Navigation

    Supply Side Resource Options Excel Workbook – Methodology and Navigation Michael Brutocao, Natural Gas Analyst Electric IRP, 6th Technical Advisory Committee Meeting September 28, 2022

  46. Slide 46: Variable Energy Resources Integration Study Update

    Variable Energy Resources Integration Study Update 2023 Avista Electric IRP TAC 6 – September 28, 2022 Lori Hermanson, Senior Power Supply Analyst

  47. Slide 47: VER Integration Study – Purpose and Overview

    VER Integration Study – Purpose and Overview • Consistent application supporting varying analyses • Integrated Resource Planning • Resource acquisition processes (e.g., RFP) • Transmission tariff rates • PURPA avoided cost calculations • Define “Consumptive Capacity” (CC) associated with incremental

  48. Slide 48: VER Integration Study Scope

    VER Integration Study Scope • Included • Consumptive capacity and its costs • Impacts of EIM (”fast”) markets • Potential future portfolio VER buildouts • Sensitivity scenarios • Not included • Alternative capacity resources (e.g. batteries) • New utility-controlled storage • VER-driven investments

  49. Slide 49: Assumptions for ADSS Modeling

    Assumptions for ADSS Modeling • Base case assumptions for all portfolio mixes (2-4 hours per run) • 13 VER portfolios (base + 12) • Include EIM regional diversity • Include carbon costs (CCA) • Modeling sensitivities for 400 MW wind case • Addresses next 10+ years of PRS • Hydro (low/base/high) • Ma

  50. Slide 50: VER Study Workplan Overview

    VER Study Workplan Overview • Phase I Results – Energy Strategies • VER scenarios and profiles – completed • VER reserve analysis – completed • VER Work group presentation– completed • Slides and recording of presentation on IRP website • Production Cost Modeling (Avista ADSS) – 1Q23 • Phase II Deli

  51. Slide 51: Phase I Results – Reserves

    Phase | Results — Reserves VER Profile Operating Reserves Around-the-Clock Average Baseline +0MW iz = tee aseline ME Up Reg mm Dn iF EE Up LF Wind +400 MW ie tm Dn Fest ©) Up_FestErr Solar +400 MW a —— ae 600 400 200 200 400 600 AVISTA

  52. Slide 52: IRP TAC - RFP Update

    Avista Utilities IRP TAC - RFP Update 2023 Electric IRP 6th Technical Advisory Committee Meeting September 28, 2022 Chris Drake, Wholesale Marketing Manager

  53. Slide 53: 2022 All Source RFP Target Timeline

    2022 All Source RFP Target Timeline Design and Release • February 18, 2022 – Avista releases All Source RFP • February 28, 2022 – Bidders’ conference Preliminary Information • March 25, 2022 – RFP bids due • April 25, 2022 – Summary of Proposals posted Short-list • June 10, 2022 – Short-listed Bid s

  54. Slide 54: 2022 All Source RFP and Proposal Highlights

    2022 All Source RFP and Proposal Highlights Request for Responses Proposals • 21 developers Wind • Shortfalls in 2026 • 11 technology (flexible CODs) types Biomass Solar • 162 MW winter • 32 proposals with capacity options • 127 MW summer • 56 total projects to Energy capacity analyze DR Program Sto

  55. Slide 55: 2022 RFP Responses

    Resource Type # of Proposals Total Capacity (MW)1 2022 RFP Wind 12 1804.7 Responses Wind + Storage 6 856.2 Wind Wind + Solar 1 404 Wind + Solar + 4 2159.8 Storage Number of Solar 6 749.9 Solar Proposals and Solar + Storage 7 660 Capacity by Battery 6 643 Storage Type Pumped Storage Hydro 3 393.3 Bio

  56. Slide 56: Independent Evaluator (IE) – Sapere Consulting

    Independent Evaluator (IE) – Sapere Consulting • IE’s role includes, but not limited to, the following: • Professional assistance in design and evaluation • Ensure RFP is conducted in accordance with Idaho and Washington resource acquisition rules • Ensure process is fair and transparent • Assess Av

  57. Slide 57: Evaluation Process – Short List Selection

    Evaluation Process – Short List Selection Initial Screen Evaluation Scoring Matrix Weighting 20% 40% 5% 20% 10% 5% 100% Risk Financial Energy Non-Energy Price Risk Electric Factors Environmental2 Total Score Management Impact1,2 Impact2 Financial Analysis of Price to include Potential for Energy sec

  58. Slide 58: Equity Considerations

    Equity Considerations Develop, strengthen, and support policies and procedures that distribute and prioritize resources to historically and currently marginalized customers, including tribes. • RFP Stakeholder Input • Draft RFP filed with Washington Utilities and Transportation Commission (UTC) and

  59. Slide 59: Evaluation Process – Detailed Proposals

    Evaluation Process – Detailed Proposals Proposal 1 • Short list identified based on natural break points in scoring matrix Proposal 6 • June 10, 2022 Proposal 2 • Detailed proposals due from Short-listed Bidders • July 18, 2022 Portfolio Approach • Price refresh after Inflation Reduction Act Proposa

  60. Slide 60: Thank you...

    Thank you... AVISTA

  61. Slide 61: IRP Climate Change Analysis

    IRP Climate Change Analysis Impact of forecasted streamflow and temperature changes on hydrogeneration and load Mike Hermanson, Senior Power Supply Analyst Electric IRP, 6th Technical Advisory Committee Meeting September 28, 2022

  62. Slide 62: Overview

    Overview • Data sources and methodology • Hydrogeneration • Load forecast • Peak load forecast • Use in IRP Modeling 2

  63. Slide 63: Data Sources

    Data Sources • Climate and Hydrology Datasets for RMJOC Long-Term Planning Studies: Second Edition • River Management Joint Operating Committee (RMJOC) - BPA, US Army Corps of Engineers, US Bureau of Reclamation • Research Team - University of Washington, Oregon State University • Part I – Unregulat

  64. Slide 64: Global Climate Models

    Global Climate Models • Global Climate Models (GCMs) • Coarse resolution ranging from 75 to 300 km grid size • Provides projections of temperature and precipitation • Multiple Representative Concentration Pathways (RCP 4.5, RCP 6, RCP 8.5) • 10 GCM models used in study - CanESM2 (Canada) - CCSM4 (US

  65. Slide 65: Representative Concentration Pathways

    Representative Concentration Pathways • Description by Intergovernmental Panel on Climate Change (IPCC) • RCP2.6 – stringent mitigation scenario • RCP4.5 & RCP6.0 – intermediate scenarios • RCP8.5 – very high GHG emissions • RMJOCII Study evaluated RCP4.5 and RCP8.5 • RCP4.5 and RCP6.0 similar withi

  66. Slide 66: Downscaling Techniques

    Downscaling Techniques • Downscale GCM data to finer resolution necessary to model hydrology • Statistical methods to represent variation within large grid size Typical GCM Grid Size • Two methods used (BCSD, MACA) - Bias Corrected Spatial Disaggregation - Multivariate Adaptive Constructed Analog Do

  67. Slide 67: Modeling Climate Change Impacts on Hydrogeneration

    Modeling Climate Change Impacts on Hydrogeneration • Hydrologic models • Downscaled temperature and precipitation is input to hydrologic models. • Hydrologic models use soil, geology, slope, vegetation, aspect, snow cover, etc. to model how precipitation translates into runoff and streamflow. • 2 di

  68. Slide 68: Modeling Climate Change Impacts on Hydrogeneration

    Modeling Climate Change Impacts on Hydrogeneration 8

  69. Slide 69: Modeling Climate Change Impacts on Hydrogeneration

    Modeling Climate Change Impacts on Hydrogeneration • Comparison of hydrogeneration used for previous IRP to estimated hydrogeneration based on stream flows from climate change modeling. • Previous IRP utilized modeled regulated flows for water years 1929- 2008 provided by BPA. • BPA selected 19 of t

  70. Slide 70: Modeling Recent 30-Year Hydrogeneration

    Modeling Recent 30-Year Hydrogeneration • BPA is moving to using recent 30-year period for planning purposes. • BPA is finalizing 90-year (1928-2018) regulated flow data set and is not yet available. • Utilized actual river flow data for 2009-2021in regression models utilized for climate change mode

  71. Slide 71: Results

    Results Comparison of Annual (aMW) Climate Change Climate Change 80-Year Hydro Recent 30-Year RCP8.5 RCP4.5 (1929-2008) (1991-2021) (2019-2049) (2019-2049) Mean 598 595 628 645 Median 597 585 620 636 Standard 142 137 149 169 Deviation 10th 424 437 454 447 Percentile • Recent 30-year shows slight dec

  72. Slide 72: Results: Comparison of Monthly (aMW)

    Results Comparison of Monthly (aMW) • Total 12

  73. Slide 73: Results: Variability of Climate Models

    Results Variability of Climate Models • Total 13

  74. Slide 74: Results: 2019-2049 Trend

    2019-2049 Trend February 1000 January 1000 me ——Febuaryrcr as —Febmarynce as —sanuary cr 8s —Jarwary cP 45 i £ + Linear (February RCP 4.5) Uinoar anuary RCP ES) Linear Uanuary RCP 45) er0z Broz Lr0z 9r02 $702 r0z eroz zr0z bro oroz coz Bc0z 007 coz coz ve0z coz z00z beoz coz 6z0z 802 1202 9202 soz 2

  75. Slide 75: Results: 2019-2049 Trend

    Results 2019-2049 Trend June May eroz Broz Ly0z oroz sr0z 02 eroz z0z boo. oroz coz 002 002 9e0z seoz ve0z ee0z zeoz seo, coz 6202 e202 1202 zoe scoz ad ezoz zoe izoz oz0z e102 wor Linear {une RCP 8} ~ Linear une REP 8.5) rence tune ner as “tinear (August RPS} + Linear (August RCP 45) guste 8s Augus

  76. Slide 76: Results: 2019-2049 Trend

    Results 2019-2049 Trend October September oraz Broz zoe 9r0z sroz woz eroe zr0z boo. voz coz Be02 coz coz 002 veoz ee0z z00z beoe. coz ezoz e202 wee ezoz coz ve02 ez0z zee voz zoe 8102 as ++ Linaar (December RCP 85) a3 43 — december Rem 85 December REP AS Year December 300 200 100 eroz 8r0z voz roe

  77. Slide 77: Results: Comparison of RCP4.5 and RCP8.5

    Results Comparison of RCP4.5 and RCP8.5 for 2019-2049 • Total 17

  78. Slide 78: Climate Change Impacts to Load

    Climate Change Impacts to Load • Daily max and min temperature for Spokane airport through 2049 that correspond to the 19 BPA scenarios. • Load forecasting model utilizes monthly heating degree days (HDDs) and cooling degree days (CDDs) as inputs to econometric model. • Utilized the median average d

  79. Slide 79: Climate Change Impacts to Load

    Climate Change Impacts to Load • Heating Degree Days Baseline Data 19

  80. Slide 80: Climate Change Impacts to Load

    Climate Change Impacts to Load 20

  81. Slide 81: Climate Change Impacts to Load

    Climate Change Impacts to Load 21

  82. Slide 82: Climate Change Impacts to Load

    Climate Change Impacts to Load • Cooling Degree Days Baseline Data 22

  83. Slide 83: Climate Change Impacts to Load

    Climate Change Impacts to Load 23

  84. Slide 84: Climate Change Impacts to Load

    Climate Change Impacts to Load 24

  85. Slide 85: Impacts to Load

    Impacts to Load Changes in monthly load- RCP4.5 (aMW) • Load forecast utilizes 20-year rolling average which phases into the climate change forecast. Changes in monthly load- RCP8.5 (aMW) 25

  86. Slide 86: Climate Change Impacts to Peak Load

    Climate Change Impacts to Peak Load • Peak load model utilizes minimum/maximum daily average temperature for each month. • Median of minimum/maximum average daily temperature for each month of all models. • Summer and winter peak is the highest/lowest for each time period. • Winter peak is based on

  87. Slide 87: Climate Change Impacts to Peak Load

    Climate Change Impacts to Peak Load 27

  88. Slide 88: Climate Change Impacts to Peak Load

    Climate Change Impacts to Peak Load 28

  89. Slide 89: Climate Change Impacts to Peak Load

    Climate Change Impacts to Peak Load 29

  90. Slide 90: Climate Change Impacts to Peak Load

    Climate Change Impacts to Peak Load 30

  91. Slide 91: Climate Change Impacts to Peak Load

    Climate Change Impacts to Peak Load 31

  92. Slide 92: Climate Change Impacts to Peak Load

    Climate Change Impacts to Peak Load 32

  93. Slide 93: Climate Change Impacts to Peak Load

    Climate Change Impacts to Peak Load 33

  94. Slide 94: Climate Change Impacts to Peak Load

    Climate Change Impacts to Peak Load • Capacity of gas turbines decreases as temperature increases. • Will increased maximum temperatures reduce capacity during extreme heat events? 34

  95. Slide 95: Climate Change Impacts to Peak Load

    Climate Change Impacts to Peak Load • Historical yearly maximum temperatures similar to median yearly maximum modeled temperatures • No difference in thermal capacity when comparing historical data to median of climate models 35

  96. Slide 96: Climate Change Impacts to Peak Load

    Climate Change Impacts to Peak Load • Thermal capacity is reduced by 22 MW at the 95th percentile of yearly maximum, maximum temperatures 36

  97. Slide 97: Climate Modeling and Peak Load Risk

    Climate Modeling and Peak Load Risk • Capacity risk is addressed with the planning reserve margin. • Given the variance of the climate change models, what is the risk associated with climate change at the extremes of the modeling, and does that risk increase over the planning horizon? 37

  98. Slide 98: Climate Change – Net Impact

    Climate Change – Net Impact Difference from current 80 year hydro record Month 30 Yr RCP4.5 RCP8.5 January 6 137 139 February 50 218 203 March 50 201 202 April 11 74 96 May -54 23 24 June -36 -58 -92 July -125 -127 -189 August -17 -36 -69 September -33 6 -11 October 0 34 21 November 14 76 80 Decembe

  99. Slide 99: Climate Change – Net Impact

    Climate Change – Net Impact Summer Peak Comparison (MW) Winter Peak Comparison (MW) Scenario 2023 2048 Scenario 2023 2048 Baseline 2299 Baseline 2319 RCP8.5 2375 RCP8.5 2294 1668 1720 RCP4.5 2363 RCP4.5 2306 5th% of RCP4.5 2470 5th% of RCP4.5 2367 39

  100. Slide 100: IRP Climate Change Approach

    IRP Climate Change Approach • Use RCP4.5 Scenario • Description by Intergovernmental Panel on Climate Change (IPCC) - RCP2.6 – stringent mitigation scenario - RCP4.5 & RCP6.0 – intermediate scenarios - RCP8.5 – very high GHG emissions • RCP4.5 & RCP6.0 are similar in IRP planning horizon • Hydrogene