Slide 1: Q2 2018 Conference Call
Q2 2018 CONFERENCE CALL August 10, 2018
Slide 2: Cautionary Notes
Cautionary Notes SSRM:NASDAQ/TSX PAGE 2
Slide 3: Delivering Growth and Value for Shareholders
Delivering Growth and Value for Shareholders Increased gold equivalent production to +85,000 ounces at lower cash costs Growth in earnings and cash flow Delivered updated Marigold life of mine plan confirming near-term growth Solid quarter at Marigold and Puna, Seabee consistent with guidanc
Slide 4: Marigold Mine: Q2 2018 Results
Marigold Mine: Q2 2018 Results Produced 49,436 oz of gold, a 15% increase compared to Q1 Production of 40,000 to 50,000 ounces of gold expected in Q3 Production of approximately 60,000 ounces of gold expected in Q4 Record ore tonnes stacked of 7.9 M tonnes at higher grade of 0.42 g/t Repor
Slide 5: Seabee Gold Operation: Q2 2018 Results
Seabee Gold Operation: Q2 2018 Results Produced 23,582 oz of gold, in line with Q1 Mining fully transitioned to the higher grade Santoy mine Reported cash costs of $616/oz gold Reported AISC of $854/oz gold Note: Cash costs and AISC are non-GAAP financial measures. Please see "Cautionary Not
Slide 6: Puna Operations: Q2 2018 Results
Puna Operations: Q2 2018 Results Produced 1.0M oz of silver from Pirquitas stockpiles H1 2018 production of 1.9M oz of silver, exceeding guidance Re-commissioned zinc circuit in anticipation of Chinchillas ore H2 2018 Produced 1.5M lbs of zinc Reported cash costs of $14.73/oz silver Repo
Slide 7: Chinchillas Project Development On Track
Chinchillas Project Development On Track Chinchillas site earthworks complete, other construction well advanced Pre-stripping of 1.8M tonnes through end Q2 Stockpile dome construction complete; cladding underway Sustainable ore delivery to the Pirquitas mill anticipated Q4 2018 Pre-stripping
Slide 8: Exploration Activities in Q2 2018
Exploration Activities in Q2 2018 Exploration programs continue to plan Marigold (Red Dot): ~ 28km drilled, proceeding to Phase 2 of the program Marigold (Mackay pit): Encouraging results near current reserve pit outline Seabee (near mine): ~19km surface and underground drilling Seabee (re
Slide 9: SIB Exploration Underway
SIB Exploration Underway Camp mobilized, EM anomaly identified Q2, drilling commenced Q3 SSRM:NASDAQ/TSX PAGE 9
Slide 10: Selected Financial Results
Selected Financial Results Units Q2 2018 Q1 2018 Q2 2017 Gold Sales oz 67,156 62,090 75,335 Silver Sales Moz 1.1 1.1 1.7 Total Gold Equivalent Sales oz 81,595 75,482 98,018 Gold Equivalent Production oz 85,082 78,483 102,933 Revenue $M $104.0 $97.9 $117.0 Income from Mine Operations $M $21.2 $17.2 $
Slide 11: Financial Strength and Cash Growth
Financial Strength and Cash Growth Units Q2 2018 Q1 2018 Cash $M $494 $473 Marketable Securities $M $9 $44 Total Assets $M $1,505 $1,490 Current Liabilities $M $89 $73 Working Capital $M $670 $686 SSRM:NASDAQ/TSX PAGE 11
Slide 12: Creating Value and Growth for Shareholders
Creating Value and Growth for Shareholders Delivered growth in production, earnings and operating cash flow Increased cash balance for eleventh consecutive quarter to $494M Lowered 2018 cash cost guidance at Marigold and Seabee Strong outlook at all three operations Production growth in Q4
Slide 13: SSR Mining Inc.
SSR Mining Inc. www.ssrmining.com Toll-free: +1 888.338.0046 Telephone: +1 604.689.3846 Email: invest@ssrmining.com