Aurora Energy Metals Limited · ASX:1AE

Aurora Energy Metals — London Mines & Money 2022

23 slides from Aurora Energy Metals's conference presentation, Nov 29, 2022

  1. Slide 1: Minerals critical for the energy transition

    Minerals critical for the energy transition London Mines & Money Presentation 29 November – 1 December 2022

  2. Slide 2: Disclaimer

    Disclaimer presentation has been prepared by and issued by Aurora Energy Metals Limited, to assist it in This Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves. The informing interested parties about the Company and its progress. It should not be considered as an in

  3. Slide 3: Investment Summary

    Minerals critical for Investment Unique Uranium & Lithium Focus the energy transition Summary A project with uranium and lithium mineralisation in Sense of urgency in the USA for domestic supply of uranium & separate geological horizons lithium, with bi-partisan support Investment Summary Exploratio

  4. Slide 4: Corporate Overview

    Corporate Overview Well funded advanced explorer with a tight capital structure Capital Structure (on an undiluted basis, as at 23 November 2022) 1AE 142.6m ASX Code Shares on Issue (inc. 26m escrowed) A$33M 8.8m Market Cap (at A$0.225 per share) Options (6m @ $0.20; rest at $0.30) ~A$6.2M ~A$27m En

  5. Slide 5: Board & Management

    Board & Management PETER LESTER GREG COCHRAN ALASDAIR COOKE STEVEN JACKSON Non-Executive Chairman Managing Director Non-Executive Director Company Secretary A mining engineer with over 40 years’ A highly experienced international Mr Cooke has over 30 years’ experience A member of CPA Australia who E

  6. Slide 6: Project Location and Highlights

    Project Location and Highlights Aurora Energy Metals Project • One of the largest, well defined uranium deposit in the USA. • Measured, Indicated & Inferred Uranium Mineral Resource Tesla Gigafactory 1 of 107.3Mt @ 214 ppm U3O8 for 50.6Mlb U3O8. • Confirmed lithium mineralisation in sediments overly

  7. Slide 7: Aurora Energy Metals Project Geological Overview

    Aurora Energy Metals Project (“AEMP”) Geological Overview • On federal land within the McDermitt Caldera, the USA’s largest lithium province. • Uranium Mineral Resource in shallow volcanics with high grade core at unconformity, 18Mt @ 485 ppm U3O8 for 19.2 Mlb U3O8 . • Lithium mineralisation hosted

  8. Slide 8: AEMP – Uranium and Project Infrastructure

    AEMP – Uranium and Project Infrastructure Substation Gas Station • Volcanic-hosted deposit, discovered in 1979, within a historic mining district. • Over 600 drillholes completed, plus extensive metallurgical testwork and studies. • Near surface, flat-lying geometry amenable to very low strip ratio

  9. Slide 9: AEMP – Uranium

    AEMP – Uranium Uranium Processing Plant Tailings Drilling access Aurora deposit Impoundment open pit area Overburden tracks Stockpile Earlier, uranium only conceptual layout • Previous studies demonstrated a conventional open pit mine: • Shallow, low-strip ratio operation. • Overburden potentially f

  10. Slide 10: AEMP – Uranium and Lithium

    AEMP – Uranium and Lithium • Historically, uranium was the only target from the 1970’s, although lithium was known to occur in the area • 1AE’s 2010 diamond core holes were therefore subsequently assayed for lithium, with encouraging results AURORAENERGYMETALS.COM 10

  11. Slide 11: AEMP – Lithium

    AEMP – Lithium • The remaining core, securely stored for 10 years, has now been assayed for lithium, returning encouraging results Note: 2414 ppm Li = 0.520% Li2O AURORAENERGYMETALS.COM 11

  12. Slide 12: AEMP – Lithium

    AEMP – Lithium • The remaining core, securely stored for 10 years, has now been assayed for lithium, returning encouraging results Note: 2431 ppm Li = 0.523% Li2O AURORAENERGYMETALS.COM 12

  13. Slide 13: AEMP – Lithium Exploration Potential

    AEMP – Lithium Exploration Potential • AEMP’s current claim area is similar in size to Jindalee’s McDermitt Lithium Project and the Aurora Uranium Deposit is only a small part of the claim area 5km 5km AURORAENERGYMETALS.COM 13

  14. Slide 14: McDermitt Lithium Project - Jindalee

    McDermitt Lithium Project - Jindalee • Jindalee’s exploration program has demonstrated that lithium is present in wide intersections from close to/at surface to depths of well over 100 metres 5km 5km A typical McDermitt Project Cross Section Aurora Claims Map AURORAENERGYMETALS.COM 14

  15. Slide 15: Plant to be located in Nevada, on private property

    Plant to be located in Nevada, on private property • 410-acre private property purchased in New Claims Nevada for plant and related infrastructure. • Nevada is a top tier mining jurisdiction. Potential Conveyor or • Property serviced by excellent infrastructure Pipeline Route close to the Project. •

  16. Slide 16: Mineral Resource upgrade announced on 23 November 2022

    Mineral Resource upgrade announced on 23 November 2022 Highlights1 • 12.7 Mlb (34%) Increase in Total Uranium Mineral Resource to 50.6 Mlb U3O8. • Maiden Measured Mineral Resource Declared. • Grade of the High-Grade Zone increased by 10%, to 485 ppm U3O8. • 90% of existing Indicated Mineral Resource

  17. Slide 17: Drilling underway

    Drilling underway • Drilling team mobilised 24 October. • Phase 1, 17-hole RC Program for ~3,400m. • Program targeting uranium extension & testing aerial extent of lithium lakebed sediments. • Second, diamond rig mobilised to ensure program completed this year. • BLM approval obtained for remainder

  18. Slide 18: Work Plan – Uranium News flow

    Work Plan – Uranium News flow • Submit Phase 2 DOGAMI diamond drill permit applications for existing uranium resource area (Q4 CY2022). • Complete RC/Diamond drill program testing potential resource extension (Q4 CY2022). • Assays results from drill program (Q4 CY2022 – Q1 CY2023). • Release results

  19. Slide 19: Work Plan – Lithium News flow

    Work Plan – Lithium News flow • Submit Phase 2 DOGAMI RC drill permit applications to extend area of known mineralisation (Q4 CY2022). • Complete RC/Diamond drill program to extend area of known mineralisation (Q4 CY2022). • Assays results from drill program (Q4 CY2022 – Q1 CY2023). • Drill program

  20. Slide 20: Investment Proposition

    Investment Proposition Minerals critical to Large, advanced Accelerated, dual- Deeply experienced, Four key reasons the USA’s energy uranium project with stream work quality management to invest in Aurora transition significant blue sky program underway team Energy Metals lithium potential AURORAENE

  21. Slide 21: Appendices

    Appendices Appendices AURORAENERGYMETALS.COM 21

  22. Slide 22: Uranium Resource Summary

    Uranium Resource Summary 1. High grade zone estimated using a 300 ppm eU3O8 cut-off 2. Low grade zone estimated using a 100 ppm eU3O8 cut-off 3. Appropriate rounding applied JORC Disclaimer: Information in this announcement relating to Exploration Results and Mineral Information in this announcement

  23. Slide 23: Greg Cochran Managing Director & CEO

    Greg Cochran Managing Director & CEO E: info@auroraenergymetals.com Suite 1, 245 Churchill Avenue SUBIACO WA 6008 P: 08 6465 5500 www.auroraenergymetals.com 24

Aurora Energy Metals — London Mines & Money 2022 on 6ix