ENBW Energie Baden-Wuerttemberg — EnBW Energie Baden-Württemberg — Investor Presentation (April 2025)
34 slides from ENBW Energie Baden-Wuerttemberg's investor presentation, April 2025

Slide 1: Investor presentation April 2025

Slide 2: EnBW business activities and countries
• Austria, Czech Republic, Denmark, France, Poland, Wind Solar Hydropower Trading Sweden, Switzerland, Türkiye, United Kingdom Thermal District heating Gas (Pumped) Storage Transmission Distribution Water supply electricity/gas electricity/gas B2C/B2B sales E-mobility Home Broadband electricity/gas

Slide 3: Investment highlights
• >93% of share capital constantly held by Baden-Wuerttemberg • Enables us to respond flexibly to market changes and external challenges (Germany’s third-largest state) and OEW (an association of counties) • 71% in FY2024 in line with our target 2024-30: ≥70% share of regulated • >€40 bn of gross in

Slide 4: FY2024 key figures and earnings development
in € bn 6.4 5.5 – 6.3 4.9 4.8 - 5.3 • Revenues: €34.5 bn 3.0 4.6 2.8 2.6 • Retained cash flow: €2.3 bn 2.4 • Gross investments: €6.2 bn 2.2 1.8 0.2 0.3 • Taxonomy-aligned capex: 89% -0.3 -0.3 2020 2021 2022 2023 2024 Guidance Target 2025 2030 • Net debt: €14.2 bn Sustainable Generation Infrastructur

Slide 5: Strategy and 2030 targets
0.7 - 1.0 ≥ 70% 10% 85% ≥ low-risk taxonomy-aligned earnings share 30% capex 1 (adj. EBITDA in Grids and 5.5 - 6.3 Renewables) >40 € bn 2.7 - 3.0 € bn 2.3 - 2.6 60% Net investments2 2024-30: €22 bn Sustainable Generation Infrastructure System Critical Infrastructure Smart Infrastructure for Customer

Slide 6: Decarbonization path and generation portfolio
2012 19% 2024 59% 2030 0% in GW in GW in GW coal from renewables renewables • Clear decarbonization path aligned (2.5 GW) (6.6 GW) end 2028 with 1.5°C pathway; -70% scope 1&2 emissions reduction target by 0.2 wind 2030 validated by SBTi in 2023 1.3 pumped storage 2.3 wind 0.9 hydro • Renewable portf

Slide 7: Segment overview
—EnBW a) Segment overview

Slide 8: Segment overview
• Power generation: • Transmission grid for electricity and gas • Sales of electricity and gas wind, solar, hydro, pumped storage, gas, coal • Distribution grid for electricity and gas • E-mobility • District heating • Water supply • Home battery storage • Gas storage • Broadband • Energy trading Ad

Slide 9: Sustainable Generation Infrastructure
Adj. EBITDA share 54% 25% 29% adj. EBITDA adj. EBITDA share share Hedging 59% (6.6 GW) 63% (~15 TWh) 41% (4.6 GW) 37% (8.6 TWh) • Risk mitigating hedging strategy focused on reducing the installed capacity 2024 generation output 2024 installed capacity 2024 generation output 2024 earnings impact fro

Slide 10: Generation capacity and output mix
10% 3% 13% 21% 1% 25% 41% 28% 11.2 59% 37% 23% 23.3 63% GW TWh 8% 18% 1% 1% 4% Coal Wind 10% 9% 24% Gas Pumped storage Other thermal Run-of-river / hydro Solar Other renewables 10

Slide 11: Offshore wind pipeline
He Dreiht (under construction) • With 960 MW one of the largest offshore wind farms in Germany • Construction well on track with all 64 foundations in only Hier He Dreiht 3 months installed; COD end of 2025 Morven • More than half of capacity secured via PPAs Dreekant Dreekant (site secured) He Drei

Slide 12: Flexible power plants and battery storage
Flexible merchant fuel switch power plants ~2 GW in total • 3 H2-ready dispatchable CCGTs with 1.5 GW in total + grid booster • All under construction with first COD in 2025 • Immediate 55% carbon reduction with switch to natural gas Grid stabilization power plant Marbach • 300 MW, started operation

Slide 13: System Critical Infrastructure
Adj. EBITDA share 46% ~180,000 km 3 12 ~780 power & gas grids TSO players DSO players electricity & gas concessions of Netze BW (our DSO) €2.2 bn ~46% €3.3 bn 12,811 adj. EBITDA 2024 adj. EBITDA share capex 2024 employees >1,200 km SuedLink Ultranet Hydrogen core grid main electricity grids key elec

Slide 14: SuedLink, Ultranet and hydrogen grid projects
SuedLink1 (under construction) • One of the largest energy infrastructure projects in Germany • 700 km, 100% underground, high-voltage • Transmits 2 x 2 GW of wind power • ~130 km currently under construction; COD 2028 Corridor A-Nord Ultranet1 (under construction) • 340 km, 100% overhead, high-volt

Slide 15: Smart Infrastructure for Customers
Adj. EBITDA 7% share Gas >6,000 >800,000 Electricity Fast-charging points Charging-points across 0.7 31 in Germany 2024 Europe (roaming) ~5.5 m ~135 TWh >3 m 2024 sales volumes2 Downloads of EnBW customers1 mobility+ app EBITDA break-even Electricity Gas 104 20% 4.8 DC market share3 Adj. EBITDA 2024

Slide 16: E-mobility charging network
Most popular >3 million • EBITDA break-even in 2024 e-mobility app downloads of EnBW mobility+ app in Germany • Ranked as the winner in consumer tests as Germany’s largest and best >800,000 electromobility supplier and rated as VERY GOOD as a charging network charging points across Europe in the “En

Slide 17: Funding
—EnBW Funding

Slide 18: Funding strategy and green bonds
€2.5 - 3 bn p.a. • Refinancing of maturing liabilities on average • Funding of corporate growth • EnBW’s assets are typically characterized by long life cycles up to 30 years • Decision based on market demand, maturity profile & interest levels • First green bond issued in 2018 Outstanding green bon

Slide 19: Debt portfolio by currency and instrument
in % 16 32 3 4 1 5 1 4 Currency Fixed/ 3 ~€16.1 bn mix1 floating mix 72 90 97 Public senior Promissory Notes Public hybrid EUR CHF GBP Fix Private placement USPP AUD USD JPY Floating As of 31 December 2024. | 1 May not add up to 100% due to rounding. 19

Slide 20: Maturity profile and green bonds ratio
in € bn As of 31 December 2024 Senior bonds Green First call dates of hybrid bonds bonds ratio: 2.610 54% 2.0 1.7 1.8 0.56 1.5 0.51 1.48 0.54 1.2 1.0 1.0 0.7 0.7 1.55 0.6 1.22 0.53 0.57 1.0 0.29 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 ≥2040 1 First call date: green

Slide 21: Credit and ESG ratings
AA Baa1 / Leader stable2 B Prime status 23.6 A- / Medium risk stable2 A-3 Leadership 1 As of March 2025. | 2 Moody’s: latest update and credit opinion from 22 October 2024; S&P: latest update from 23 September 2024 and latest full analysis from 23 August 2024. | 3 CDP Climate Change rating. 21

Slide 22: FY 2024 overview
—EnBW a FY 2024 overview

Slide 23: Adjusted EBITDA FY2024
in € m 6,365 €4.6 – 5.2 bn Guidance 2024 - Pumped storage earnings contribution below exceptionally high level 4,903 in the previous year 2,901 1,408 1,225 1,746 71% low-risk - Return to normalized earnings with reduced volatility in energy markets 55% low-risk earnings earnings -23% 2,243 1,772 + H

Slide 24: Investments FY2024
in € m Net cash investments Co-financing/divestments 6,242 1% 10% 4,903 23% Sustainable Generation Infrastructure Renewable Energies 5,197 2,740 €6.2 bn Thermal Generation and Trading FY 2024 System Critical Infrastructure 13% Smart Infrastructure for Customers +27% Other/consolidation 2,163 54% 1,0

Slide 25: From adjusted EBITDA to net profit and dividend
in € m 4,903 in € 29% -1,726 Dividend payout ratio 3,178 195 3,090 -282 1.60 -899 1.50 -688 1,504 +7% Adj. EBITDA Adj. Adj. EBIT Adj. investment Adj. financial Adj. EBT Adj. income tax Adj. share Adj. net profit FY 2023 FY 20242 FY 2024 amortization & FY 2024 result result FY 2024 attributable to FY

Slide 26: Retained cash flow
in € m 4,903 -53% -147 4,832 -937 -382 -48 3,030 -359 -758 2,272 Adjusted EBITDA Non-cash items Taxes paid Payments in Dividends Others FFO Declared RCF RCF FY 2024 in adj. EBITDA relation to received & dividends FY 2024 FY 2023 ALM model1 interests paid/received 1 Asset Liability Management Model:

Slide 27: Net debt and debt repayment potential
in € bn +22% • Debt repayment potential achieved at 5.2 top end of 13 – 16% 0.2 14.2 target range for 2024 -0.8 11.7 with 16% and in line with the long-term 0.2 target of ≥15%2 -2.3 • Commitment to maintain solid investment grade ratings Net debt RCF Adjusted Net cash CTA1 Others Net debt 31.12.2023

Slide 28: Guidance 2025
in € bn • Contribution of wind and solar assets commissioned during 2025 2.6 2.4 - 2.7 • Normalized price levels on energy markets 4.8 – 5.3 2.2 2.3 - 2.6 • Higher earnings from grids thanks to 2024: 4.91 substantial investments in previous years • Emerging dynamics in the B2B and B2C 0.3 0.25 - 0.3

Slide 29: Nuclear and pension provisions
in € m • In 2024, pension provisions amounting to approximately €820 m were transferred to another CTA due to regulatory requirements Nuclear and • The funding of the CTA in this regard was carried out without burdening the financial assets pension provisions • Compared to 2023, full coverage is now

Slide 30: Key financials and guidance
in € m FY 2023 FY 2024 Guidance FY 2025 Adj. EBITDA 6,365 4,903 4,800 – 5,300 % low-risk (renewables & grid) earnings 55% 71% ≥70% Sustainable Generation Infrastructure 4,6481 2,633 2,400 – 2,700 Renewables Energies 1,7461 1,225 1,100 – 1,300 Thermal Generation and Trading 2,9011 1,408 System Critic

Slide 31: ESG key figures and targets
FY 2023 FY 2024 Targets Environment CO2 emissions (million t CO2eq) Scope 1 10.9 8.9 2030: -70 to 75%1: 2035: -83%1 Scope 2 0.8 0.7 2030: -70 to 75%1: 2035: -83%1 Scope 3 34.0 30.4 2030: -23 to 37%1; 2035: -41%1 CO2 intensity (in g/kWh) 347 272 2025: 380 - 440; 2030: 90 - 110 Coal-based revenues (%)

Slide 32: Financial calendar and IR contacts
8 May 2025, 10:00 a.m. (CEST) 13 May 2025, 2:00 p.m. (CEST) 8 August 2025, 2:00 p.m. (CEST) SVP Finance, M&A Head of Investor Relations Senior Manager and Investor Relations Investor Relations 13 November 2025, 2:00 p.m. (CET) +49 721 63 16 102 +49 721 63 12 210 +49 721 63 12 060 ma.muench@enbw.com

Slide 33: Disclaimer
No offer or investment recommendation Forward-looking statements This presentation is prepared for information purposes only. It does not constitute an offer, an invitation or a This presentation, which has been prepared by EnBW, includes statements that are, or may be deemed to be, recommendation t

Slide 34: Investor Relations contact
Investor Relations investor.relations@enbw.com +49 721 63-12060 Durlacher Allee 93 76131 Karlsruhe, Germany Companies registered office: Karlsruhe, Germany Local court Mannheim ⋅ HRB no. 107956 Chairman of the Supervisory Board: Lutz Feldmann Board of management: Dr. Georg Stamatelopoulos (Chairman)
Source: Internet Archive copy of enbw.com
More decks from ENBW Energie Baden-Wuerttemberg AG
9M 2026 Earnings Presentation20 slides · Nov 12, 2026
Investor Presentation (November 2026)56 slides · November 2026
Investor Presentation (October 2026)65 slides · October 2026
Investor Presentation (September 2026)65 slides · September 2026
6M 2026 Earnings Presentation24 slides · Aug 7, 2026
Q1 2026 Earnings Presentation20 slides · May 12, 2026