Tocvan Ventures Corp. · CSE:TOC
Tocvan Ventures — Investor Presentation (March 2022)
16 slides from Tocvan Ventures's investor presentation, March 2022
Slide 1: Developing Gold-Silver Projects in Mexico
DEVELOPING GOLD-SILVER PROJECTS IN MEXICO March 2022 CSE: TOC | OTCQB: TCVNF | FSE: TV3
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS Statements in this corporate presentation contain forward looking information including expectations of future production and commodity prices, drilling and exploration plans, timing and amounts of capital expenditures and future expenditure levels. Readers are cautioned t
Slide 3: Mission Statement
MISSION STATEMENT IDENTIFY undervalued advanced stage targets with the potential for large scale mineral resources. CREATE shareholder value through acquisitions and strategic partnerships. ADVANCE our project portfolio with technical tact and aggressive drill targeting. BUILD our team from the stre
Slide 4: Why TOC?
WHY TOC? Gold-Silver Focused 100% interest in two oxide gold projects 32 MM Shares Outstanding Options: 1.68 MM, avg. $0.38 CAD Warrants: 1.37 MM, avg. $0.72 CAD Proven Technical Team with Local Expertise Brodie A. Sutherland – President & CEO P.Geo with over 15 years of industry experience explorin
Slide 5: Why Mexico? Sonora State
WHY MEXICO? Ranked 1st in Latin America Exploration Investment1 $600 MM USD Annually. Mexico accounts for 23% of investment in Latin America exploration. Top 10 Global Gold Producer2 102 tonnes annually Ranked 1st in Global Silver Production3 6,120 tonnes annually 1 – Chilean Copper Commision 2 - Go
Slide 6: Quality Projects Quality Jurisdiction
Quality Projects Quality Jurisdiction • PILAR • 22,700m drilled to date • Oxide Au-Ag • 94.6m @ 1.6 g/t Au • incl. 9.2 m @ 10.8 g/t Au and 38 g/t Ag • >90% Au Recovery; 84% Ag Recovery • EL PICACHO • 24 km2 of brownfields exploration • 18 km SW of San Francisco Mine • 6 km of prospective trends • Fu
Slide 7: Pilar – Targeting Near-Term Production
PILAR – Targeting Near-Term Production Local Comparable Reserves: Santana (Au) 383k oz Au @ 0.59 g/t 50 km to the east Hermosillo 5.1 Moz Ag @ 8.2 g/t 0.65 g/t Au (Bulk sample avg.) 50 k ounces per year Au Recovery 70% +500k oz Au Resource Bulk Test Mine: La Colorada (Au-Ag) Argonaut – La Colorada 5
Slide 8: Phase I & II – Drilling
Phase I & II – Drilling Phase I - Highlights JES20-36: 24.4m @ 2.5 g/t Au and 73 g/t Ag incl. 1.5 m @ 33.4 g/t Au and 1,090 g/t Ag JES20-32: 94.6m @ 1.6 g/t Au incl. 9.2 m @ 10.8 g/t Au and 38 g/t Ag JES20-33: 41.2m @ 1.1 g/t Au incl. 3.1 m @ 6.0 g/t Au and 12 g/t Ag Phase II - Highlights JES21-38:
Slide 9: Oxide Gold – Amenable to Low Cost Heap Leach
Oxide Gold – Amenable to Low Cost Heap Leach Preliminary Metallurgical Work Bottle Roll – 48hr Retention Time low-grade composite 0.63 g/t Au – 91% Recovery 7 g/t Ag – 70% Recovery mid-grade composite 1.2 g/t Au – 92% Recovery 12 g/t Ag – 84% Recovery Table of JES20-32 results From (m) To (m) Interv
Slide 10: 2022 Trench Results
2022 Trench Results • Four Trenches completed • All contained oxide gold-silver • Samples submitted for column leach study Trench - Highlights T-21-2: 19.5m @ 0.61 g/t Au incl. 2.7 m @ 3.0 g/t Au and 20 g/t Ag T-21-3: 19.8m @ 0.73 g/t Au incl. 8.6 m @ 1.3 g/t Au and 12 g/t Ag
Slide 11: 2022 Surface Results
2022 Surface Results Au-Ag over a 1.2 km trend 2022 Surface - Highlights Main Zone (100m extension): • 9.2 g/t Au and 279 g/t Ag 4-T (100m extension): • 6.6 g/t Au and 433 g/t Ag • 4.9 g/t Au and 32 g/t Ag NEW Vein Target (250m strike): • 1.3 g/t Au and 524 g/t Ag • 1.3 g/t Au and 94 g/t Ag • 1.1 g/
Slide 12: El Picacho
EL PICACHO Project - Highlights Multi-million ounce potential • 24 km2 area to explore • 6 km of prospective trend defined so far Infrastructure • 18 km from San Francisco Mine (3 Moz Au) • Road accessible from Hermosillo (2.5 hrs) • National Railine 3 km to east • Fully permitted: • 2 km trenching
Slide 13: Drill Target
PICACHO PROJECT - SAN RAMON TARGET SAN FRANCISCO MINE 4-Lane Highway National Railroad Low angle fault/ contact with Jurassic sediments Underground Working: 600m 10 samples from 0.41 to 8.2 g/t Au DRILL TARGET Underground Drive 70m long: 28 samples from 0.29 to 21.8 g/t Au
Slide 14: Our Vision
OUR VISION Develop into a leading mineral exploration and development company in Mexico and beyond. Continue to add shareholder value through exploration and development of quality gold-silver assets in an established mining jurisdiction. PILAR • Continued Discovery and Expansion through Drilling •
Slide 15: Development Timeline
DEVELOPMENT TIMELINE EXPANSION ESTABLISHMENT Phase III Drilling Phase I Drilling Advance Metallurgy RESOURCE DEFINITION Maiden Resource Calculation 2021 Q2-Q3 2022 2020 Q4 2022 Q2 EXPANSION ENGINEERING STUDIES Phase II Drilling BULK TEST MINING Prelim Metallurgy PICACHO AQUISITION DRILL TARGETING DI
Slide 16: Thank You
THANK YOU CONTACT US CSE: TOC | OTCQB: TCVNF | FSE: TV3 TOCVAN VENTURES CORP. Brodie A. Sutherland, P.Geo. Telephone: 403-829-9877 Email: bsutherland@tocvan.ca