Metals Exploration Plc · LSE:MTL

Metals Exploration — Manila Mining Club (June 2011)

32 slides from Metals Exploration's conference presentation, Jun 10, 2011

  1. Slide 1: Runruno Today and The Future

    RUNRUNO TODAY AND THE FUTURE Manila Mining Club 10 June J ne 2011

  2. Slide 2: Important Notice

    IMPORTANT NOTICE This presentation has been prepared by the management of Metals Exploration Plc and FCF Minerals Corporation for the benefit of the investing community including, brokers, fund managers, investors and analysts and not for the benefit of any particular person. The information is base

  3. Slide 3: Runruno Project Summary

    RUNRUNO PROJECT SUMMARY Title: Financial or Technical Assistance Agreement Status: Development ready, feasibility study - 2010 Mine life: 10.3 years Payable Production: 1,006,000 ozs Annual Production (ave.): 96,700 ozs (101,800ozs Au years 1-5 92 700 ozs Au years 6 92,700 6-10.3) 10 3) Capital Cost

  4. Slide 4: Regional Location

    “Project is well served by existing g infrastructure.” REGIONAL LOCATION Airfield – Bagabag airfield 5 kms north of Solano Solano Road – upgrade allowed along parts of the road. Currently passable all year. Bayombong Power supply – switch yard in Bayombong will be the origin for the new 69Kv line to

  5. Slide 5: Resources & Reserves

    RESOURCES & RESERVES March 2011 Resource & Reserve Statement Ore Gold Molybdenum Resource Category Mt g/t M Oz ppm M lbs Measured 11.2 1.88 0.68 604 14.9 Indicated 7.0 1.64 0.37 425 6.5 Inferred 7.5 7 5 1.44 1 44 0.35 0 35 253 4.2 4 2 Total 25.7 1.69 1.39 453 25.6 Ore Gold Molybdenum Reserve Categor

  6. Slide 6: Project Description

    PROJECT DESCRIPTION Five key components: • Mine Open Pit and Run of Mine (ROM) Pad; • Process Plant facility consisting of conventional crushing, grinding, flotation, along with BIOX® and gravity recovery; • Tailings Storage Facility (TSF): to ensure materials are properly managed and to reclaim wat

  7. Slide 7: Mine Pit

    MINE PIT • Open pit area - 600m x 1,500m • 1.75 1 75 Mtpa ore - transported by conveyor to the Process Plant. Plant • 9.1 Mtpa overburden - used for the construction of the Tailings Storage Facility and in-pit backfill. • During D i g the th first fi t three th years, waste t material t i l will ill

  8. Slide 8: Process Plant

    PROCESS PLANT  Ore contains free and refractory Gold  Molybdenum circuit and Molybdenite Method to recover moly dissolved during the BIOX® process being  Gold circuit demonstrated by developed extensive testwork including 20t pilot plant Testwork undertaken by Metcon, Burnie, Gravity recovery –

  9. Slide 9: Process Flow Diagram

    NOLES 1. TANKS & EQUPHENT NOT SHOWN 0 scale. CYCLONE we couerwraure THERE |_| PROCESS WATER TAN a (GOLD CORE BARS. 50 co crac PRIMARY TANKS (be (CO THCKENERS) NEUTRALISATION Jaco was (ORCUTT 5 TANKS) coun LOADED CARBON PROCESS WATER eTURN cu orc (7 TANKS) cl Tats FlTRATEN Ya 10 CiRCUT (ASTER

  10. Slide 10: Tailings Storage Facility

    TAILINGS STORAGE FACILITY Tailing Storage Facility (TSF) • Storage of treated tailings in valley adjacent to the Process Plant. • 2 year starter embankment established using pit i pre-strip. i • Dam lifted to final height during initial 3 years of production. • Designed to national and international

  11. Slide 11: Water Supply

    WATER SUPPLY • Water usage will be effectively managed to minimise the amount of water drawn from local rivers and to maximise the water returned from the TSF. • Potable water will be sourced from the Lintungan River and this will be supplied to the Runruno Village and Process Plant. • Process water

  12. Slide 12: Off-Site Infrastructure

    OFF-SITE OFF SITE INFRASTRUCTURE Access Road • Improvement of the Quezon to Runruno Access Road. Power Supply • Estimated average power usage of 13MW. • Access to the power national grid and hydroelectric power stations. • Switch yard located at Bayombong. Bayombong • 36 km dedicated 69 kV Powerline

  13. Slide 13: Current Site Activities

    CURRENT SITE ACTIVITIES  Exploration  Land Acquisition and Small Scale Miners  Environment Management g  Safety and Health  Information, Communication and Education (ICE)  Community Relations and Development

  14. Slide 14: Exploration Model

    EXPLORATION MODEL Pierre Perroud Photograph by P Runruno – 1.5 Mozs Inferred, Indicated & Measured Cripple Creek – 23 Mozs historic production “In short, the Runruno gold deposit is remarkable in terms of its shared characteristics with other alkaline epithermal deposits, including Cripple Creek, Co

  15. Slide 15: Exploration

    EXPLORATION  Gold-in-soil anomalies scattered over the sampled area – similar i il tto CCripple i l Creek’s historic mines  Aeromagnetics flown  Soil sampling ongoing, clear anomalies defined  Gold and copper targets  Demonstrated potential to expand on current resource base • Step out and targ

  16. Slide 16: Environmental Management

    ENVIRONMENTAL MANAGEMENT Rehabilitation • Slope Stabilization  soil filled bags  coco-matting Before  silt fencing • Revegetation  napier grass (endemic) After 6 months  vetiver grass (propagated) • Drainage Canal Maintenance After 2 months

  17. Slide 17: Environmental Monitoring: Water Quality Monitoring

    ENVIRONMENTAL MONITORING Water Quality Monitoring

  18. Slide 18: Environmental Monitoring: Stream Flow and Groundwater Discharge

    ENVIRONMENTAL MONITORING S Stream Flow Fl and dGGroundwater d Discharge Di h Monitoring M i i

  19. Slide 19: Environmental Monitoring: Air Quality and Ambient Noise

    ENVIRONMENTAL MONITORING Air Quality and Ambient Noise Monitoring

  20. Slide 20: Mining Forest Program

    MINING FOREST PROGRAM Reforestation program • Memorandum of Agreement with surface owner owner, FCF, FCF DENR, DENR NVSU • Reforested area: 43.03 hectares as of March 2011 • 2008, 2009 2008 2009, 2010: 1st Runner Up Best Mining Forest Program , PMEIA (Exploration Category) Tree Planting Activities

  21. Slide 21: Safety and Health

    SAFETY AND HEALTH Safety Statistics The Project maintained a Zero Non Lost Time Accident (NLTA). Safety induction is conducted to all new employees and visitors. Regular safety meetings discussions on safety concerns

  22. Slide 22: Information, Communication and Education (ICE)

    INFORMATION, INFORMATION COMMUNICATION AND EDUCATION (ICE) FCF performs Information, Communication and Education (ICE) campaigns  To shape desirable social opinion about the company and its current activities. activities  To provide social understanding of the mines and geosciences, encourage on t

  23. Slide 23: Information, Communication and Education (ICE)

    INFORMATION, INFORMATION COMMUNICATION AND EDUCATION (ICE)  C Community it Engagements E t  Trainings and Seminars  FCF Chronicle Bi-Monthly Publication

  24. Slide 24: Community Responsibility: Livelihood Projects

    COMMUNITY RESPONSIBILITY Livelihood Projects Runo Craft Banana Chip Making Junk Shop Hammock Making Soft Broom Making Basic Sewing Course

  25. Slide 25: Community Responsibility: Education

    COMMUNITY RESPONSIBILITY Education

  26. Slide 26: Community Responsibility: Basic Infrastructure Development

    COMMUNITY RESPONSIBILITY Basic Infrastructure Development p Hanging Bridge Daycare Center Community Clinic Waiting Shed Tire Path Irrigation Canal

  27. Slide 27: The Future - Construction

    fcf minerals THE FUTURE - CONSTRUCTION

  28. Slide 28: Simplified Corporate Structure

    SIMPLIFIED CORPORATE STRUCTURE METALS EXPLORATION PLC ((MEP)) 100% Foreign Owned- London Based FCF C Minerals C Corp.- 85% 8 MEP 15% CMI – optioned to MEP 100% Runruno Financial or Technical Assistance Agreement Capital Structure: Significant Shareholders:**  Ticker Symbol: LSE : MTL  Solomon Capi

  29. Slide 29: Construction Philosophy

    CONSTRUCTION PHILOSOPHY • Strong experienced owners team • GMP – EPC executioni philosophy hil h ffor hi highest h risk i k most technical h i l area – Process P Plant. Pl  Appoint an Engineer / Constructor with demonstrated performance.  Incentivise by sharing upside i.e. Cost savings. • Develop

  30. Slide 30: Timetable

    TIMETABLE Milestones Achievements Forthcoming Scoping Study  Completed in November 2008 - FTAA awarded for Runruno Project  November 2010 - Independent Resource verification  Completed in November 2009 - Environmental Compliance Certificate (ECC)  Granted in February 2010 - Feasibility Study  D

  31. Slide 31: fcf

    fcf minerals

  32. Slide 32: Thank You

    fcf minerals Thank You.