Mining Americas Inc. · TSX:MAI

Mining Americas — Minera Alamos — Mines & Money London 2024

32 slides from Mining Americas's conference presentation, December 2024

  1. Slide 1: Advancing Low Capital Gold Mine Development

    Advancing Low Capital Gold Mine Development Mines & Money London TSX.V: MAI | OTCQX: MAIFF December 2024

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation contains “forward-looking information” within discussion and analysis dated December 31, 2023 (the “MD&A”) 2018; (ii) NI 43-101 Technical Report titled “Preliminary Economic Corporation believes that its market, industry and economic the meaning of applic

  3. Slide 3: Why Invest in Minera Alamos?

    Why Invest in Minera Alamos? 1 – Heap leach and Underground mining expertise We are proven builders – Extensive Mineral Processing experience – Ability to expedite projects & minimize initial CAPEX – Same team that placed 4 mines into production 2 We are gold producers – 1 mining operation in produc

  4. Slide 4: Growth Model

    Growth Model Pushing Growth Along the Mineral Santana Mine Development Lifecycle – In production – Growth Potential High value Copperstone – 6-year initial mine life – Largely Permitted – Exploration Upside Cerro De Oro – 8-year initial mine life – In permitting – Funding secured – Upside Case La Fo

  5. Slide 5: Potential Combined Production Profile

    Potential Combined Production Profile (Annualized Forward Run-rate) Assumes Cerro de Oro 4 Year Production Growth (oz) Permit Receipt in H1 2025 Santana Cerro De Oro Copperstone (Funding package in place) 160,000 and Santana Permit Amendment Copperstone 3 140,000 Copperstone construction running in

  6. Slide 6: Golden Foundations

    Golden Foundations Unveiling Strong Economics in Gold Mining1 Santana ~15 Koz ~200 Koz 10 M Sub $900/oz (mine) Produced to Date Indicated Low Capex Cash Costs in 2022 Cerro ~58 Koz ~790 Koz 28 M $873/oz de Oro Annual Production Inferred Low Capex AISC per 2022 PEA ($1600 gold) (permitting) Coppersto

  7. Slide 7: Low-Cost, Low Capital Intensity

    Low-Cost, Low Capital Intensity Path to Intermediate Production Capital Intensity (US$/OZ)1,2 In addition to Santana, Minera Alamos holds three attractive development projects with comparably low capital intensity – (Copperstone subject to completion of Arrangement Agreement with Sabre Gold Mines Co

  8. Slide 8: Sabre Gold Transaction Highlights

    Sabre Gold Transaction Highlights ✓ Acquisition of Past Producing Copperstone Mine Historic production of 514k oz gold – Potential for near-term mine restart with existing infrastructure. Permitted Plan of Operations in place for the mine ✓ Creation of a Diversified North American Gold Producer Plat

  9. Slide 9: Transaction Summary

    Transaction Summary Proposed • Minera Alamos to acquire Sabre Gold Mines Corp. (“Sabre”) via a Plan of Arrangement Transaction • Pro forma ownership: ~86% Minera Alamos / 14% Sabre1 Consideration • 0.693 Minera Alamos shares per common share of Sabre • Sabre to settle ~C$9.4M of debts outstanding pr

  10. Slide 10: Potential Production and Resource Growth

    Potential Production and Resource Growth Production Growth1 Resource Growth1 – Incremental ~40,000 oz/y of planned production – Approximate 35% increase in Minera Alamos’ total gold resource inventory to almost 1,900,000 ounces. Combined – Complementary low capital intensity project to existing gold

  11. Slide 11: Increased Exposure to Tier 1 Jurisdictions

    Increased Exposure to Tier 1 Jurisdictions Asset NPV by Geography1 M&I Resources by Geography United States Mexico United Mexico 19% 81% States 63% 37% 1 Copperstone Project after-tax NPV (5%) at $2,000/oz Au based on Copperstone 2023 PEA. Minera Alamos NPVs based on select analyst reports. TSX.V: M

  12. Slide 12: Copperstone Mine

    13.8 square miles of surface area Held by Sabre Gold Copperstone Mine 546 unpatented mining claims California Arizona, U.S. Lake Havasu City 1987-1993 Open pit mining with 2,500 tpd of combined whole ore and heap leaching resulted in total production of 514,000 oz of gold from 5,600,000 Copperstone

  13. Slide 13: Copperstone Mine Overview

    Copperstone Mine Overview PEA – The recent 2023 Preliminary Economic Assessment (PEA) provides a revised start-up mine plan (initial 6 years of production) for the Copperstone project, including revised resource estimates, mining methods, mining dilution and recovery assumptions. – 160,000 m of dril

  14. Slide 14: Copperstone 2023 PEA Summary

    Copperstone 2023 PEA Summary After-Tax $1800/oz Au $2000/oz Au 71% NPV (5%) US$61.8 million US$89.3 million IRR 50.5% 71.1% Payback Period 1.8 years 1.3 years Strong IRR After-Tax @ $2,000/oz Au Summary Ave. Annual Production 40,000 oz gold 40,000 oz gold US $36M Pre-Production Capital US$36.3 milli

  15. Slide 15: Copperstone Mine Overview

    Copperstone Mine Overview Utilization of existing Minera owned Mill – Relocation of a portion of the grinding and flotation equipment already owned by Minera Alamos to be utilized at the Copperstone project. This includes the major equipment items required for reactivation of the crushing, grinding,

  16. Slide 16: Copperstone Resource Statement

    Copperstone Resource Statement Mineral Resource Estimate Resource Category Cut-Off Grade Tonnes Average Grade Contained Au (All Zones) Au (g/t) (t) Au (g/t) (oz) Measured 3.15 750,000 8.12 196,000 Indicated 3.15 457,000 7.09 104,000 Total Measured and 3.15 1,207,000 7.74 300,000 Indicated Inferred 3

  17. Slide 17: Minera Alamos Snapshot

    Minera Alamos Snapshot Capital Structure1,4 Shareholder Distribution $C 149M $C 142M 48.2% Retail & Other Market Capitalization Enterprise Value 20.8% High Net Worth Individuals 10.0% Other Institutions 8.0% Aegis Financial 7.0% Donald Smith Family Trust Common Shares Outstanding 499 M 6.0% Manageme

  18. Slide 18: Santana Project

    ~ 15,000 oz gold produced ~6,000 oz of recoverable inventory on pad Sonora State +30,000 m of drilling to date v Grid power nearby and access road available Hermosillo Santana Project La Colorada (Argonaut Gold) San Antonio 100% Owned, Sonora State de La Huerta June 2021 Mining operations commenced

  19. Slide 19: Santana Mine Expansion

    Santana Mine Expansion Mining – Direct mining cash costs of C$1180/oz in 2022 Leaching – Leach kinetics continue to track very favourably, with areas under active leach achieving 70% recoveries in 30-45 days and increasing Outlook – Slow 2023 production as a result of advancing waste mining activiti

  20. Slide 20: Cerro De Oro

    Cerro De Oro 100% Owned (No Royalties), Zacatecas State 70+ holes, 2 gold zones, 1 potential large pit 2020 Open in multiple Project Acquisition directions and at depth 2022 Cerro de Oro Surface rights in place Highway access and Aranzazu Mine 2022 grid power nearby [Aura Minerals] PEA release Noche

  21. Slide 21: Cerro de Oro – Minera's Next Mine

    Cerro de Oro – Minera’s Next Mine Economic Key Highlights Production – 8+ year initial mine life – Average annual gold production of ~60,000oz – Life of Mine AISC of $873/oz – 0.3:1 Strip ratio – US$28 M Capex including 30% contingency Low Capital Intensity – Recent Santana build informs capital cos

  22. Slide 22: Cerro de Oro PEA Summary

    Cerro de Oro PEA Summary After-Tax NPV (5%) US$150.5 million IRR Payback Period 111% 11 months 111% Strong IRR After-Tax at $1600/oz Au Summary Ave. Annual Production 58,400 oz gold US $28M Pre-Production Capital US$28 million (including 30% contingency) Sustaining Capital US$14.7 million LOM Averag

  23. Slide 23: La Fortuna Project

    La Fortuna Project Durango State 100% owned, Durango State 2016 Project Acquisition 2018 Positive PEA Announced 2020 Federal Permits Received TSX.V: MAI | OTCQX: MAIFF | mineraalamos.com 23

  24. Slide 24: La Fortuna PEA Economic Summary

    La Fortuna PEA Economic Summary After-Tax NPV (7.5%) US$69.8M IRR Payback Period 93% 11 months 93% Strong IRR After-Tax Summary Average Annual Production 43k oz Au, 220K oz Ag 1,000 t Cu (50k oz AuEq) Pre-Production Capital US$26.9M LOM Average AISC Mine US$440/oz 5 years $1,250/oz Mill Throughput (

  25. Slide 25: 2025 Outlook

    2025 Outlook Flexible Sequencing – Preparing for dual track development H1 2025 Current Expectations / Assumptions – Cerro De Oro Permits – Copperstone - submit final documents for addition of leaching facilities to existing processing at site – Rehabilitate and installation of larger mill equipment

  26. Slide 26: Appendices

    Appendices TSX.V: MAI | OTCQX: MAIFF | mineraalamos.com 26

  27. Slide 27: Board of Directors / Operating Team

    Board of Directors / Operating Team Rich Diversity of Technical Expertise Darren Koningen Doug Ramshaw Kevin Small Ruben Padilla Bruce Durham P.Eng. B.Sc. Mining Geology P.Eng. P.Geo. P.Geo. CEO, Director President, Director Independent Director Independent Director Independent Director 30 years of

  28. Slide 28: Santana Mineral Resource Estimate

    Santana Mineral Resource Estimate Resource Category Cut-Off Grade Tonnes Average Grade Contained Au (All Zones) Au (g/t) (t) Au (g/t) (oz) Measured 0.15 6,540,000 0.65 136,000 Indicated 0.15 3,070,000 0.64 62,000 Total Measured and 0.15 9,610,000 0.65 198,000 Indicated Inferred 0.15 5,510,000 0.58 1

  29. Slide 29: Cerro De Oro Mineral Resource Estimate

    Cerro De Oro Mineral Resource Estimate Resource Category Cut-Off Grade Tonnes Average Grade Contained Au (Oxide Zone) Au (g/t) (t) Au (g/t) (oz) Inferred 0.15 67,000,000 0.37 790,000 Notes: – The independent and QP for the mineral resource estimates, as defined by NI 43 101, is Scott Zelligan, P.Geo

  30. Slide 30: La Fortuna Mineral Resource Estimate

    La Fortuna Mineral Resource Estimate Resource Cut-Off Tonnes Average Grade Contained Metal Category Grade Au (g/t) (t) Au (g/t) Ag (g/t) Cu (%) Au (oz) Ag (oz) Cu (t) Measured 1.0 1,755,400 2.96 17.5 0.23 167,100 987,800 4,000 Indicated 1.0 1,714,300 2.59 15.5 0.21 142,800 854,400 3,600 Total M&I 1.

  31. Slide 31: Cerro de Oro Funding Package Highlights

    Cerro de Oro Funding Package Executed With Auramet Highlights $15M $10M Of Definitive Documentation* Loan Facility Royalty Package – US$25 Million single source solution – 3-year term (PEA payback of less – 2.75% NSR for initial construction capex than 1 yr at $1600 gold) – Available on receipt of p

  32. Slide 32: Thank you

    Thank you For more information contact us: info@mineraalamos.com /MineraAlamos /MineraAlamos @MineraAlamos @MineraAlamos mineraalamos.com

Minera Alamos — Mines & Money London 2024 on 6ix