Slide 1: Welcome - Benvenuti
May 16th 2007 Welcome Benvenuti
Slide 2: Evolution of the Grottaglie Plant - April 2005
EVOLUTION OF THE GROTTAGLIE PLANT - APRIL 2005 EXISTING EXPANSION AREA AREA
Slide 3: Evolution of the Grottaglie Plant - April 2006
EVOLUTION OF THE GROTTAGLIE PLANT – APRIL 2006
Slide 4: Grottaglie Workflow
GROTTAGLIE WORKFLOW Stringer Loading Automatic Skin Lay-Up Surface Preparation Tacking Drill & Fill Mandrel Preparation Bagging NDI Completion & Inspection Autoclave Cure Ring Installation Floor Installation Cell De-Bagging Trim & Drill Systems Installation Shipping
Slide 5: March 2007 First Delivery
», -/ . . / AleniaComposite March 2007 First Delivery A Finmeecanica Company = —=_” =
Slide 6: Grottaglie Airport March 22, 2007
GROTTAGLIE AIRPORT March 22, 2007
Slide 7: Boeing 787 Work Package - Fuselage
Boeing 787 Work Package - Fuselage
Slide 8: FAL
ALENIA Foggia ALENIA Grottaglie Fully automated green field plant ( 65000 sqm) INTEGRATION SITE in South Carolina (50% ALENIA) FULLY EQUIPPED SECTIONS BOEING FAL
Slide 9: Foggia Plant Main Events
Foggia Plant Main Events 1982 Plant start-up as machining unit 1983 Carbon fiber production start 1989 Plant full conversion to carbon fiber production 1990 Design and research activity located at Foggia plant 1993 B777 outboard flap production start 1995 ATR 42-72 composite empennages production st
Slide 10: Pomigliano Plant Map
Pomigliano Plant Map Production Layout N 36 Panels C130-J Paint 35 Bonding B787 ATR Panels Sez.1541 Frames & ATR Barrel - Frames Shear Ties Sez.15 29 C27-J Stg. B787 C130-J Plug C27-J Ctr Barrel Barrel Joint 32 Frames & C27-J Rear ATR Fuselage Assembly Shear Ties B767 Flaps Barrel 30 24 C27-J Cockpi
Slide 11: Nola Plant
Nola Plant MECHANICAL CELL HIGH SPEED MILLING MCHN SHEET METAL FABRICATION SURFACE TREATS CN _ LONG GANTRIES MACHINING SHOP BROTJE FMS ASSEMBLY SHOP PRESETTING SAFA