Aurum Resources Limited · ASX:AUE

Aurum Resources — Australian Gold Conference 2025

28 slides from Aurum Resources's conference presentation, Oct 15, 2025

  1. Slide 1: Côte d'Ivoire's Rising Gold Explorer/Developer

    COTE DIVOIRE’S For personal use only RISING GOLD EXPLORER/DEVELOPER Lesson one: public RAPIDLY speaking ADVANCING BOUNDIALI (2.41MOZ) & NAPIÉ (0.87MOZ) GOLD PROJECTS 14 OCTOBER 2025 www.aurumres.com.au | ASX:AUE

  2. Slide 2: Disclaimer and Compliance Statement

    Disc la im e r This p re se n ta tio n p re p a re d b y Au ru m Re so u rc e s Ltd (“C o m p a n y”) d o e s n o t p u rp o rt to c o n ta in a ll th e in fo rm a tio n th a t a C O MPLIANC E STATEMENT p ro sp e c tive in ve sto r m a y re q u ire in c o n n e c tio n w ith a n y p o te n tia l in

  3. Slide 3: Aurum Resources: What Aurum has?

    Au ru m Re so u rc e s: Wh a t Au ru m h a s? For personal use only Two a d va n c e d 12 se lf-o wn e d A te a m with C le a r Fa vo u ra b le g o ld p ro je c ts a n d o p e ra te d DD tra c k re c o rd in De ve lo p m e n t Ju risd ic tio n 3.28 Mo z Au rig s (drilling for ourselves) C ô te d ’Iv

  4. Slide 4: Building a Gold Resource Inventory Rapidly

    Bu ild in g a G o ld Re so u rc e In ve n to ry Ra p id ly “Through a dual strategy of organic growth and strategic acquisition, Aurum has grown from 0 oz to 3.28 Moz gold resources in just over 20 months, thanks to our cost-effective self-owned drilling fleet and diligent operating team.” 3.28Moz 3

  5. Slide 5: Corporate Overview

    Corporate Overview CAPITAL STRUCTURE (ASX:AUE) A$0.675 343M A$232M ~A$42M* ~A$190M For personal use only Share Price (10 Oct 2025) Shares on Issue1 Market Capitalisation *Cash + shares unaudited Enterprise Value 30 September 2025 DIRECTORS MAJOR SHAREHOLDERS TROY FLANNERY Board & Management 11.16% N

  6. Slide 6: Aurum's 3.28Moz Gold Resources in Côte d'Ivoire

    Au ru m ’s 3.28Mo z G o ld Re so u rc e s in C ô te d 'Ivo ire • 3.28Moz gold resource in Côte d'Ivoire, West For personal use only Africa: • Boundiali – 2.41Moz Gold Project • Napié - 0.87Moz Gold Project • Exploration upside (2,757 km2): Gold mineralisation remains open at all deposits, with many

  7. Slide 7: Boundiali and Napié: Two Project Growth Engines

    Bo u n d ia li a n d Na p ié : Two Pro je c t G ro wth En g in e Strategic, prospective land package For personal use only • Boundiali is located within the same greenstone belt as: • Syama gold mine (11.5Moz) Resolute • Sissingué gold complex (~1 Moz) Perseus • Koné gold project (6Moz) Montage Gold

  8. Slide 8: Boundiali: Growing Flagship 2.41Moz Gold Project

    Bo u n d ia li: G ro win g Fla g sh ip 2.41Mo z G o ld Pro je c t Simple “Drill to Build” Strategy • Seven (7) permits for 1469.7km2 For personal use only • Gold Resources stand at 2.41Moz @ 1.0 g/t Au: • Indicated Resources 26Mt at 1.1 g/t Au for 920,000 ounces • Inferred Resources 51Mt at 0.9 g/t

  9. Slide 9: BD Gold JV Project: Multiple targets still to be drill tested

    BD Gold JV Project: Multiple targets still to be drill tested 14km By 3km Nyangboue Gold Corridor • 1.1Moz discovered so far from drilling at three For personal use only deposits (BDT1, BDT2 and BDT3) • Gold mineralisation hosted in a thick, north-south trending sandstone unit • Gold mineralisation

  10. Slide 10: BD Gold JV Project: Example cross sections

    For personal use only BD Gold JV Project: Example cross sections BDT1 Cross Section BDT2 Cross Section BDT3 Cross Section AURUM RESOURCES 10 Refer to page 2 for reference to results reported previously and published on ASX platform

  11. Slide 11: BM Gold JV Project: Multiple targets still to be drill tested

    BM Gold JV Project: Multiple targets still to be drill tested Fast Growing and Underexplored • 0.9Moz discovered so far from drilling at two deposits For personal use only (BMT1 and BMT3) • Gold mineralisation can occur as plunging high-grade shoots hosted in NNE trending shear zones • Gold minerali

  12. Slide 12: BM Gold JV Project: Example cross sections

    For personal use only BM Gold JV Project: Example cross sections BMT3 Cross Section AURUM RESOURCES 12 Refer to page 2 for reference to results reported previously and published on ASX platform

  13. Slide 13: BST Gold Project: Shallow resource primed for growth

    BST Gold Project: Shallow resource primed for growth Multiple Drill -Ready Targets • 0.36Moz defined so far from shallow drilling at BST1 For personal use only • Gold mineralisation is hosted in a thick, north-south trending sandstone/conglomerate package • Gold mineralisation remains open in all di

  14. Slide 14: Boundiali PFS – On track for delivery in Q1 2026

    Boundiali PFS – On track for delivery in Q1 2026 BD Met work: Free milling +95% gold recovery • Easy to crush: Ore is likely suitable for a single-stage SAG mill For personal use only circuit • Gravity gold recovery: Gold can be recovered at 50% to 60% using gravity methods at a 106µm grind • Relati

  15. Slide 15: Napié Gold Project: ~26km of undrilled gold-bearing shear

    Napié Gold Project: ~26km of undrilled g old -bearing shear Over 93% of the MRE is shallower than 150m • 0.87Moz discovered so far from drilling at two deposits (Tchaga and For personal use only Gogbala) • Gold mineralisation hosted in en-echelon quartz veins, stringers and vein breccias. Quartz vei

  16. Slide 16: Napié Gold Project: Plan view (Tchaga)

    For personal use only Napié Gold Project: Plan view (Tchaga) AURUM RESOURCES 16 Refer to page 2 for reference to results reported previously and published on ASX platform

  17. Slide 17: Napié Gold Project: Long section (Tchaga)

    For personal use only Napié Gold Project: Long section (Tchaga) AURUM RESOURCES 17 Refer to page 2 for reference to results reported previously and published on ASX platform

  18. Slide 18: Napié Gold Project: Cross section (Tchaga)

    For personal use only Napié Gold Project: Cross section (Tchaga) AURUM RESOURCES 18 Refer to page 2 for reference to results reported previously and published on ASX platform

  19. Slide 19: Côte d'Ivoire – Growing Gold Producer

    Côte d'Ivoire – Growing Gold Producer 8 For personal use only Stable Extensive Underexplored Proven Eight operating Excellent Birimian jurisdiction Gold mines infrastructure Political Gold-bearing rocks World-class For mine development >1.5Moz pa (Barrick, Extensive network of governance with approx

  20. Slide 20: Aurum working closely with authorities and communities

    Aurum solely sponsored PINK OCTOBER For personal use only Aurum closely working with authorities and communities We care about our shareholders and look after all stakeholders Boundiali Exploration Camp The Aurum-built Napié bridge AURUM RESOURCES 20

  21. Slide 21: Why Invest in Aurum Resources?

    Why Invest in Aurum Resources? • 3.28Moz Gold Resource: Combined resource across Boundiali and Napié projects • Exploration Upside: Both projects have potential to grow resources through drilling For personal use only • Cost-Effective Exploration: In-house diamond drilling fleet reduces drilling cos

  22. Slide 22: Want to know more about Aurum?

    Want to know more about Aurum? Contact us + 61 8 6559 1792 For personal use only Troy Flannery Non-Executive Chairman Email: contact@aurumres.com.au Dr Caigen Wang Managing Director Email: caigen.wang@aurumres.com.au Mark Strizek Executive Director Email: mark.strizek@aurumres.com.au www.aurumres.co

  23. Slide 23: Appendix

    For personal use only Appendix Ehouinsou Kacou Fabrice Ouattara Yaya (MAusIMM) Senior Exploration Geologist Exploration Manager AURUM RESOURCES 23

  24. Slide 24: Napié Project: Underexplored, offering significant potential for growth

    Napié Project: Underexplored, offering significant potential for growth For personal use only AURUM RESOURCES 24 Refer to page 2 for reference to results reported previously and published on ASX platform

  25. Slide 25: West Africa - Destination of Choice

    West Africa - Destination of Choice ANNUAL Au PRODUCTION DISCOVERIES BY REGION BY AREA ANNUAL GOLD PRODUCTION BY REGION 2010-2021 IN MILLIONS OF OUNCES, FOR 2021 For personal use only 67Moz EXPLORATION CONSTRUCTION PRODUCTION Largest number of discoveries Low capital intensity with industry- 16Moz W

  26. Slide 26: West Africa - Destination of Choice (continued)

    West Africa - Destination of Choice (continued) ANNUAL Au GOLD PRODUCTION PROJECT BY REGION CONSTRUCTION GOLD PROJECT CONSTRUCTION Based on 44 primary gold projects built since 2010 Capital intensity calculated as development capital costs For personal use only divided by M&I resource as per the fea

  27. Slide 27: Aurum's Projects

    Aurum’s Projects The flagship 2.41Moz Boundiali Gold Project is comprised of seven neighbouring tenements: Aurum-Major Start Plus SARL’s (“MSP”) partnership BM gold project JV 80% interest • Aurum pays FCFA7 million (~A$19,000) for the 35% registered share capital of MSP, which has FCFA20 million fo

  28. Slide 28: Aurum Mineral Resources JORC 2012

    Aurum Mineral Resources JORC 2012 Boundiali Statement of Mineral Resources by Deposit as at 30 September 2025, for BST1, BDT1, BDT2, BDT3, BMT1 and BMT3 deposits with 0.4 g/t Au cut off above 300m depth, and 1 g/t below 300m depth 1 For personal use only Napié Mineral Resource Estimate; On 14 June 2

Aurum Resources — Australian Gold Conference 2025 on 6ix