Lundin Gold Inc. · TSX:LUG
Lundin Gold — BMO Global Metals & Mining Conference 2016
28 slides from Lundin Gold's conference presentation, March 2016
Slide 1: Building A Leading High Grade Gold Company
Building A Leading High Grade Gold Company BMO Global Metals & Mining Conference February 28 – March 2 2016
Slide 2: Disclaimers
Disclaimers Forward-Looking Statements Certain information contained in this presentation, including any information relating to the Fruta del Norte Project, and any other statements regarding Lundin Gold’s future expectations, beliefs, goals or prospects constitute forward-looking information withi
Slide 3: Lundin Gold
Lundin Gold ► Vancouver and Quito-based ► Listed on TSX and Nasdaq Stockholm under the trading symbol “LUG” ► Acquired the Fruta del Norte (FDN) project in December 2014 ► Focusing on developing FDN in a manner that is safe for all employees, respects the environment and is beneficial to local commu
Slide 4: Fruta del Norte
Fruta del Norte ► FDN is among the largest and highest grade undeveloped gold projects in the world 7.26 million oz (23.5 million t at 9.59 g/t Au) Indicated and 2.55 million oz (14.5 million t at 5.46 g/t Au) Inferred Substantial potential to expand existing resource ► FDN can move quickly thro
Slide 5: Ecuador: Creating an Attractive Mining Investment Climate
Ecuador: Creating an Attractive Mining Investment Climate ► Policy is shifting towards increasing foreign investment in various aspects of the Ecuadorian economy ► Government led by President Correa is encouraging investment in mining sector and have taken the following positive steps Wood Mackenz
Slide 6: Recent Significant Developments in Mining
Recent Significant Developments in Mining Announcement of Start of Construction of Mirador Copper Project (December 21, 2015) Completion of Fruta del Norte Exploitation Agreement (January 14, 2016) 6
Slide 7: What is an Exploitation Agreement?
What is an Exploitation Agreement? ► Exploitation Agreement defines fiscal terms (royalty, tax, calculation methodology), establishes mining rights, title to concession and a legal framework to finance the project ► Long Term: Lundin Gold has right to develop and produce gold from Fruta del Norte fo
Slide 8: Summary of Fiscal Terms
Summary of Fiscal Terms Previous Project Terms Current Royalty 5 – 8% based on Au price 5% Advanced Royalty $65 million $65 million 1st Installment - $40 M 1st Installment - $25 M 2nd Installment - $25 M 2nd Installment - $20 M 3rd Installment - $20 M Advanced Royalty Recovery Over 10 yr period Over
Slide 9: FDN Location
FDN Location ► Located in southeast Ecuador, bordering Peru ► Nearest city is Loja 4th largest city in Ecuador University town Population of ~180,000 ► Vehicle access from Loja is via 150 km paved highway to Los Encuentros and 40 km gravel road from Los Encuentros to FDN ► Population of Ecuado
Slide 10: Mineral Concessions & Surface Rights
Mineral Concessions & Surface Rights ► Land package consists of 33 mining concessions, 100% owned by Lundin Gold’s wholly owned subsidiary Aurelian Ecuador SA FDN Project area of approximately 4,660 ha and other concession area of approximately 70,500 ha Concessions are subject to a 1% NSR royal
Slide 11: FDN Mineralization
FDN Mineralization ► The orebody is 1,670m along strike x 700m down dip x 150m- 300m wide Amenable to bulk underground mining Crustiforme- Cross-cutting ► Mineralization is characterized by Colloforme mineralization events quartz sulphide & carbonate stockwork veining and brecciation over broad wi
Slide 12: NI 43-101 Mineral Resource
NI 43-101 Mineral Resource ► Current Technical Report confirms high grades and scale; Indicated category accounts for ~74% ► FDN Technical Report resource estimate (October 2014): Category Tonnage Gold Grade Silver Grade Gold Contained Silver Contained (mmt) (g/t) (g/t) (mmoz) (mmoz) Indicated 23.5
Slide 13: Feasibility Study Work Program
Feasibility Study Work Program ► Field work completed ≈14,000 m drilling and field program to support mine and civils engineering Environmental baseline work for EIA ► Strong Feasibility Study engineering team in-house and utilizing AMEC FW, Santiago – lead consultant and metallurgy, process p
Slide 14: Mine Design
Mine Design ► Mine design envisages production of 3,000 - 3,500 tonnes per day ► 2015 field work program provided mine geotechnical and hydro-geological data for mine access options assessment and life-of-mine design ► Mine design and production plan under development using transverse long hole stop
Slide 15: Process
LUNDINGOLD Process SAG Mill Coarse Ore Stockpile Crushed Ore Stockpile Regrind Scavenger and Cyclone 9 Tailings Flotation Cleaners (3) Thickener ee CIL Circuit Rearing Elution Electrowinning wormage ee Cyanide Concentrate Destruction Thickener Tailings — Concentrate da Thickener Kerry Filter Y Paste
Slide 16: Metallurgical Results
Metallurgical Results Composite Sample Results * ► Gold recovery of 91.7 to 94.2% Au Head Open Cycle Locked Cycle Au ► Approximately 30% of gold to be Grade Au Recovery Au Recovery Concentrate produced as dore (g/t) (%) (%) Grade (g/t) Comp 1 12.1 95.1 94.2 136.7 ► Clean, precious metal rich concent
Slide 17: Environmental
Environmental ► Baseline studies completed ► Mine EIA approved and license received in Q1 2015 ► Amendment of EIA to include plant and associated infrastructure to be submitted to MoE in Q1 2016 to support overall project development timeline ► Strategic Sectors Ministry has committed to support pro
Slide 18: Feasibility Study – Infrastructure
Feasibility Study – Infrastructure ► Power supply negotiations underway ► Site-wide water management plan well advanced ► Site access road fully permitted – detailed design underway ► Logistics study underway – mine construction, operations and product export phases Puerto Bolivar Puerto Guayaquil R
Slide 19: Current Project Schedule
Current Project Schedule 2016 2017 2018 2019 Task Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Feasibility Study Environmental Permitting Finalization of EA Agreement (01/14/16) Submittal of Phase Change Application (06/16) Review of Phase Change Application Approval of Application (08/16) Financ
Slide 20: Community Relations
Community Relations ► Lundin Gold’s vision for community investment is to create shared value for host communities in coordination with local and national governments ► The Company is focused on jointly-identified priorities that align with established community development plans ► The Company seeks
Slide 21: Significant Exploration Upside
Significant Exploration FDN Upside ► 2015 Exploration work focused mainly on key target areas outside of La Zarza concession Castillos (up to 20 km south of FDN) Alejandro ► Geophysics (IP), detailed prospecting and mapping carried out on best anomalies and currently have 5 targets drill ready Rio B
Slide 22: Emperador Target
Emperador Target ► First of several planned targets to be drilled ► Favorable geological & structural model Emperador Target ► Sinter recently found in outcrop (above system) A B ► Coincident IP chargeability anomaly with subtle resistivity ► Favorable soil geochemistry (Au, As) Emperador Schematic
Slide 23: Robles Target
Robles Target ► Strongest gold anomaly to the south (soil, boulders, and outcrop) ► Coincident arsenic anomaly in soils ► Well defined IP resistivity anomaly ► Evidence shows in high level of epithermal system Geology & DTM Robles Robles Gold Soil Geochem. Arsenic Soil Geochem. 7
Slide 24: Chanchito Target
Chanchito Target ► Exceptionally high mercury, and moderate arsenic geochem in soils ► Well defined IP resistivity anomaly ► Apparent important NNE oriented structure ► Evidence shows in high level of epithermal system Gradient Array Resistivity and Gold Geochem. Pole-Dipole Resistivity El Arco Chan
Slide 25: Strong Management Team
Strong Management Team Board of Directors Management Lukas Lundin, Chairman Chester See, CFO Ron Hochstein, President and CEO Tony George, VP Project Development Jim Cambon Nicholas Teasdale, VP Exploration Carmel Daniele Nathan Monash, VP Business Sustainability Ian Gibbs Sheila Colman, VP Legal an
Slide 26: Analyst Coverage
Analyst Coverage ► Currently covered by eight analysts Rating Modeling LoM Avg. Au Target Price Production Mine Life Cash Cost AISC NAV Broker Date (CAD) Rating CAPEX ($M) (koz) (years) ($/oz) ($/oz) ($M) BMO 19-Aug-15 $5.00 Buy $800 321 10 $543 n/a $1,000 GMP 26-Mar-15 $6.75 Buy $745 360 13 $431 $5
Slide 27: Why Lundin Gold?
Why Lundin Gold? ► FDN is among the largest and highest grade undeveloped gold projects in the world, with a resource that can support a large scale gold producer ► Completion of Exploitation Agreement negotiations – de-risks project from a fiscal viewpoint ► FDN is a robust project benefiting from
Slide 28: www.lundingold.com TSX and Nasdaq Stockholm: LUG
Head Office Corporate Office Lundin Gold Inc. Aurelian Ecuador SA Suite 2000, 885 West Georgia Street Av. Amazonas N37-29 y UNP Vancouver, B.C., Canada V6C 3E8 Edificio Eurocenter, Piso 5 +1 (604) 689-7842 Quito, Ecuador +593 (2) 299-6400 www.lundingold.com TSX and Nasdaq Stockholm: LUG Lundin Gold
Lundin Gold — BMO Global Metals & Mining Conference 2016 on 6ix