Surface Metals Inc. · CSE:SUR
Surface Metals — ACME Lithium — Investor Presentation (March 2024)
22 slides from Surface Metals's investor presentation, March 2024
Slide 1: Powering the Energy Revolution
POWERING THE ENERGY REVOLUTION CORPORATE PRESENTATION March 2024 | CSE: ACME | US OTCQB: ACLHF
Slide 2: Safe Harbor and Forward-Looking Statements
SAFE HARBOR AND FORWARD-LOOKING STATEMENTS DISCLAIMER: This presentation contains information, qualifications, and disclaimers to protect the There is no assurance that any of the milestones stated herein will be met, or that the funds raised investor or potential investor when reviewing information
Slide 3: The Future Starts Here
THE FUTURE STARTS HERE At ACME Lithium, the building blocks for the future are our focus today. We have one of the best portfolios of North American projects in areas known for lithium production, development, and exploration. Two are found in a highly prospective region for lithium production in Cl
Slide 4: An Urgent Need for the Domestic Supply of Lithium
AN URGENT NEED FOR THE DOMESTIC SUPPLY OF LITHIUM “ “To retain a competitive [automotive industry] Global lithium production by source1, million metric tons lithium carbonate equivalent Just a few countries dominate lithium production, but reserves are found around the world. The U.S. and Canadian g
Slide 5: Where Is Lithium Going?
WHERE IS LITHIUM GOING? “ “A worldwide lithium shortage could come as soon as 2025…The world produced 540,000 metric tons of lithium in 2021, and by 2030 the World Economic Forum projects that global demand will reach over 3 million metric tons.” Quote & Source: https://www.emergingtechbrew.com/stor
Slide 6: ACME Lithium Project Claims
ACME LITHIUM PROJECT CLAIMS NEVADA CLAYTON VALLEY Lithium brine project with a 100% interest in 119 claims acquired and under option to acquire, totaling approximately 2,230 acres Recent findings estimating an inferred lithium carbonate equivalent resource of approximately 302,900 metric tons FISH L
Slide 7: Nevada Projects
NEVADA PROJECTS Welcome to Esmeralda County, Nevada, the epicenter of lithium exploration and development in the United States. PROJECT HIGHLIGHTS § A lithium brine project, ACME Lithium has acquired, or is under option to acquire a combined 100% interest in 119 claims totaling approximately 2,230 a
Slide 8: Building Blocks of the Future
BUILDING BLOCKS OF THE FUTURE § ACME’s Clayton Valley project neighbors the Silver Peak lithium mine owned and operated by one of largest lithium producers in the world, Albemarle Corporation (NYSE:ALB) § Silver Peak is the only current lithium production in the U.S. where lithium has been continuou
Slide 9: Clayton Valley Project Overview
CLAYTON VALLEY PROJECT OVERVIEW § ACME’s CC, CCP, JR, and SX Placer Claims in Clayton Valley are found in an area with a rich history and promising future § The claims cover basin-fill sediments and aquifers similar to sediments currently producing lithium brines in the region § ACME recently announ
Slide 10: A Momentous Discovery at Clayton Valley
A MOMENTOUS DISCOVERY AT CLAYTON VALLEY § In February 2024, ACME announced its exploration summary and hydrological evaluation report for its Phase 1 and Phase 2 programs at Clayton Valley § The report estimates an inferred lithium carbonate equivalent (LCE) resource of approximately 302,900 metric
Slide 11: Phase 1 & 2 Drill Program Highlights
PHASE 1 & 2 DRILL PROGRAM HIGHLIGHTS PHASE 1 DRILL PROGRAM § Launched June 2022 based on prospective lithium brine targets defined in Fall 2021 geophysical § First drill hole (DH-1) was completed at 1,400 feet depth below ground surface; core of DH-1 was consistent with known basin stratigraphy § Li
Slide 12: An Emerging Technology
AN EMERGING TECHNOLOGY DIRECT LITHIUM EXTRACTION DLE is the technology we expect to use at Clayton Valley to process lithium. It is a low-cost and sustainable technology that extracts lithium from brine water. § DLE is a more efficient process compared to traditional lithium extraction by selectivel
Slide 13: Fish Lake Valley Project Overview
FISH LAKE VALLEY PROJECT OVERVIEW EAGLE BATTERY METALS OPTION AGREEMENT ACME has entered into an option agreement with Eagle Battery Metals Corp. (“EBM”) to grant EBM the sole option to acquire 100% interest in 207 mining claims held, totaling approximately 4,139 acres UP TO 1418 PPM SURFACE LITHIUM
Slide 14: Geophysics and Next Steps at Fish Lake Valley
GEOPHYSICS AND NEXT STEPS AT FISH LAKE VALLEY Findings indicate the project is drill-ready and drilling has been recommended to determine the relationship between the different interpreted concentrations of clay sediments and the presence of lithium. GRAVITY SURVEY HYBRID-SOURCE AUDIO-MAGNETOTELLURI
Slide 15: Field Review and Sampling at Fish Lake Valley
FIELD REVIEW AND SAMPLING AT FISH LAKE VALLEY Phase 1 and 2 Field Reviews and Sampling indicate a mineral process was active during deposition of the underlying sediments. PHASE 2 GEOLOGICAL FIELD WORK § Launched in Q4 2022 with a focus on traverses along a major drainage area where higher lithium v
Slide 16: Manitoba Projects
MANITOBA PROJECTS The Bird River Greenstone Belt in southeastern Manitoba, Canada: A global area of focus and opportunity for emerging and developing lithium projects. REGIONAL HIGHLIGHTS § The region hosts hundreds of individual pegmatite bodies, many of which are classified as complex rare-element
Slide 17: Shatford and Birse Lake Projects Overview
SHATFORD AND BIRSE LAKE PROJECTS OVERVIEW § Located in the southern limb of the Bird River Greenstone Belt, ACME’s Shatford and Birse Lake project claims are comprised of 31 claims, totaling approximately 14,079 acres § The claims straddle a 15-kilometer structural trend of the Greer-Shatford Shear
Slide 18: Manitoba Winter 2023 Drill Program
MANITOBA WINTER 2023 DRILL PROGRAM Drilling commenced at Shatford and Birse Lake in January 2023 based on findings from the Summer Exploration Program and the Winter 2023 Drill Program was completed in April 2023. HIGHLIGHTS § Exploration agreement signed with the Sagkeeng First Nation § Drill targe
Slide 19: Cat-Euclid Lake Project Overview
CAT-EUCLID LAKE PROJECT OVERVIEW § 6 claims totaling approximately 2,930 acres in the northern limb of the Bird River Greenstone Belt § The claims straddle the prospective Cat-Euclid Lake shear zone and extend along southeasterly trend of known pegmatite occurrences § World leading lithium producer
Slide 20: Management Team & Advisory Board
MANAGEMENT TEAM & ADVISORY BOARD STEPHEN HANSON VIVIAN KATSURIS YANNIS TSITOS ZARA KANJI DIRECTOR, PRESIDENT AND CEO DIRECTOR DIRECTOR CHIEF FINANCIAL OFFICER AND CORPORATE SECRETARY Originally a physicist-geophysicist Over 28 years of finance and A specialist in corporate with nearly 30 years of ex
Slide 21: Capital Overview
CAPITAL OVERVIEW CSE ACME OTCQB ACLHF SHARES ISSUED AND OUTSTANDING 60,927,727 WARRANTS 8,773,343 OPTIONS 3,550,000 FULLY DILUTED 73,296,070 LEGAL AUDITOR TRANSFER AGENT Owen Bird Law Corporation Charlton & Company, Odyssey Trust Company Bentall 3 Suite 2900, 595 Burrard Street Chartered Professiona
Slide 22: Contact Us
CONTACT US 1-604-564-9045 INFO@ACMELITHIUM.COM INVESTOR INQUIRIES ANTHONY SIMONE SIMONE CAPITAL 1-416-881-9045 ACME LITHIUM US INC. 318 N CARSON ST #208 CARSON CITY, NV 89701 USA 318 – 1199 WEST PENDER ST VANCOUVER, BC V6E 2R1 CSE: ACME | OTCQB: ACLHF 22