Orica Limited · ASX:ORI
Orica — Corporate Update (August 2021)
28 slides from Orica's corporate update, Aug 30, 2021
Slide 1: Community Reference Group Meeting
30 AUGUST 2021 COMMUNITY REFERENCE GROUP MEETING ORICA KOORAGANG ISLAND
Slide 2: Agenda
KOORAGANG ISLAND CRG MEETING 30 AUGUST 2021 AGENDA 2
Slide 3: Agenda
Agenda • Welcome, introduction, apologies and acceptance of meeting notes • Site status • Overview of safety, health and environmental performance in the last quarter • Environmental projects update • Community update • Other business • Action review and meeting close 3 General
Slide 4: Welcome and Introductions
KOORAGANG ISLAND CRG MEETING 30 AUGUST 2021 WELCOME AND INTRODUCTIONS 4
Slide 5: Welcome and introductions
Welcome and introductions Orica • Paul Hastie • Nicole Masson • Antony Taylor • Nathan Robinson Apologies 5 General
Slide 6: Acceptance of Meeting Notes
KOORAGANG ISLAND CRG MEETING 30 AUGUST 2021 ACCEPTANCE OF MEETING NOTES 6
Slide 7: Acceptance of meeting notes
Acceptance of meeting notes Meeting notes for the 31 May 2021 meeting were sent by email on 30 July 2021. 7 General
Slide 8: Site Status
KOORAGANG ISLAND CRG MEETING 30 AUGUST 2021 SITE STATUS PAUL HASTIE 8
Slide 9: Overview of SHE Performance
KOORAGANG ISLAND CRG MEETING 30 AUGUST 2021 OVERVIEW OF SHE PERFORMANCE ANTONY TAYLOR 9
Slide 10: June to August 2021
June to August 2021 Injuries 3 x first aid injuries (rolled ankle, cut on right arm and a minor burn to thumb Environmental compliance 1 x automatic effluent sampler failed to take sample 1 x stormwater auto sampler failed to take sample during discharge Community complaints 1 x noise complaint from
Slide 11: Environmental Projects Update
KOORAGANG ISLAND CRG MEETING 30 AUGUST 2021 ENVIRONMENTAL PROJECTS UPDATE NATHAN ROBINSON 11
Slide 12: NAP1 Stack Replacement
NAP1 Stack Replacement 12 General
Slide 13: NAP1 Stack Replacement
NAP1 Stack Replacement 13 General
Slide 14: NAP1 Stack Replacement
NAP1 Stack Replacement Construction status • Pile installation complete • Pile cap completed • COVID related delays 14 General
Slide 15: Prill Tower Scrubber
Prill Tower Scrubber Current Key environmental benefits fans Improved air quality • Outlet particulates PM2.5 <5 mg/Nm3 Effluent • Currently determining projected benefit as part of design phase Preliminary only 15 General
Slide 16: Prill Tower Scrubber
Prill Tower Scrubber Benefits – improved air quality and lower nitrogen loads on the Hunter River Status • Design phase progressing - noise attenuation has been a key issue identified and addressed in design • Modification application and supporting EA submitted in August to DPIE • Targeting develop
Slide 17: Prill Tower Scrubber
Prill Tower Scrubber Predicted air emissions performance Scenarios modelled - based on indicative real time data for outlet concentrations to the Prill Tower Scrubber, the inlet concentrations are anticipated to be below: • Scenario 2A - 20mg/Nm3 approximately 99% of the time (typical) 17 General
Slide 18: Prill Tower Scrubber
Prill Tower Scrubber Predicted reductions in particulate levels • Scenario 2A – typical inlet concentrations 98% 18 General
Slide 19: Nitrates effluent pond replacement
Nitrates effluent pond replacement BENEFIT – Environmental risk reduction/loss of containment Status • Development approval obtained • No change to manufacturing process • Project involves replacement of an inground effluent pond with a fully bunded tank • Project likely to commence in early 2022 su
Slide 20: Effluent Monitoring Station Relocation
Effluent Monitoring Station Relocation Impact – Improved reliability and security of monitoring Proposed monitoring location Current monitoring location Status • Draft EPL variation issued by EPA to allow cutover • Sampling station building installed on site and being fitted out • Anticipate ready f
Slide 21: Community Update
KOORAGANG ISLAND CRG MEETING 30 AUGUST 2021 COMMUNITY UPDATE NICOLE MASSON 21
Slide 22: Community newsletter
Community newsletter Issue 3 delivered Tuesday 24 August 2021 to Stockton and Fern Bay. Deliveries to other suburbs will occur after lockdown is lifted. 22 General
Slide 23: Community Investment Program
Community Investment Program Jenny’s Place: put a $10,000 grant towards the purchase of a new van. The vehicle will enable the transportation of families as well as the distribution of important items including food and clothing. Bayway Village Men’s Shed: put a $6,000 grant towards the purchase of
Slide 24: Community Investment Program
Community Investment Program Stockton RSL Sub Branch used a $3,700 grant to install a second flag pole at the Stockton war memorial. Stockton Public School unveiled its new garden. The area features a variety of play equipment to get kids moving but also plenty of space where students can sit and ha
Slide 25: Community Investment Program
Community Investment Program Soul Café will receive $30,000 a year for two years to employ a dedicated social worker. 25 General
Slide 26: Other Business
KOORAGANG ISLAND CRG MEETING 30 AUGUST 021 OTHER BUSINESS ALL 26
Slide 27: Action Review
KOORAGANG ISLAND CRG MEETING 30 AUGUST 2021 ACTION REVIEW NICOLE MASSON 27
Slide 28: Actions
Actions No outstanding actions. 28 General