Orica Limited · ASX:ORI

Orica — Corporate Update (August 2021)

28 slides from Orica's corporate update, Aug 30, 2021

  1. Slide 1: Community Reference Group Meeting

    30 AUGUST 2021 COMMUNITY REFERENCE GROUP MEETING ORICA KOORAGANG ISLAND

  2. Slide 2: Agenda

    KOORAGANG ISLAND CRG MEETING 30 AUGUST 2021 AGENDA 2

  3. Slide 3: Agenda

    Agenda • Welcome, introduction, apologies and acceptance of meeting notes • Site status • Overview of safety, health and environmental performance in the last quarter • Environmental projects update • Community update • Other business • Action review and meeting close 3 General

  4. Slide 4: Welcome and Introductions

    KOORAGANG ISLAND CRG MEETING 30 AUGUST 2021 WELCOME AND INTRODUCTIONS 4

  5. Slide 5: Welcome and introductions

    Welcome and introductions Orica • Paul Hastie • Nicole Masson • Antony Taylor • Nathan Robinson Apologies 5 General

  6. Slide 6: Acceptance of Meeting Notes

    KOORAGANG ISLAND CRG MEETING 30 AUGUST 2021 ACCEPTANCE OF MEETING NOTES 6

  7. Slide 7: Acceptance of meeting notes

    Acceptance of meeting notes Meeting notes for the 31 May 2021 meeting were sent by email on 30 July 2021. 7 General

  8. Slide 8: Site Status

    KOORAGANG ISLAND CRG MEETING 30 AUGUST 2021 SITE STATUS PAUL HASTIE 8

  9. Slide 9: Overview of SHE Performance

    KOORAGANG ISLAND CRG MEETING 30 AUGUST 2021 OVERVIEW OF SHE PERFORMANCE ANTONY TAYLOR 9

  10. Slide 10: June to August 2021

    June to August 2021 Injuries 3 x first aid injuries (rolled ankle, cut on right arm and a minor burn to thumb Environmental compliance 1 x automatic effluent sampler failed to take sample 1 x stormwater auto sampler failed to take sample during discharge Community complaints 1 x noise complaint from

  11. Slide 11: Environmental Projects Update

    KOORAGANG ISLAND CRG MEETING 30 AUGUST 2021 ENVIRONMENTAL PROJECTS UPDATE NATHAN ROBINSON 11

  12. Slide 12: NAP1 Stack Replacement

    NAP1 Stack Replacement 12 General

  13. Slide 13: NAP1 Stack Replacement

    NAP1 Stack Replacement 13 General

  14. Slide 14: NAP1 Stack Replacement

    NAP1 Stack Replacement Construction status • Pile installation complete • Pile cap completed • COVID related delays 14 General

  15. Slide 15: Prill Tower Scrubber

    Prill Tower Scrubber Current Key environmental benefits fans Improved air quality • Outlet particulates PM2.5 <5 mg/Nm3 Effluent • Currently determining projected benefit as part of design phase Preliminary only 15 General

  16. Slide 16: Prill Tower Scrubber

    Prill Tower Scrubber Benefits – improved air quality and lower nitrogen loads on the Hunter River Status • Design phase progressing - noise attenuation has been a key issue identified and addressed in design • Modification application and supporting EA submitted in August to DPIE • Targeting develop

  17. Slide 17: Prill Tower Scrubber

    Prill Tower Scrubber Predicted air emissions performance Scenarios modelled - based on indicative real time data for outlet concentrations to the Prill Tower Scrubber, the inlet concentrations are anticipated to be below: • Scenario 2A - 20mg/Nm3 approximately 99% of the time (typical) 17 General

  18. Slide 18: Prill Tower Scrubber

    Prill Tower Scrubber Predicted reductions in particulate levels • Scenario 2A – typical inlet concentrations 98% 18 General

  19. Slide 19: Nitrates effluent pond replacement

    Nitrates effluent pond replacement BENEFIT – Environmental risk reduction/loss of containment Status • Development approval obtained • No change to manufacturing process • Project involves replacement of an inground effluent pond with a fully bunded tank • Project likely to commence in early 2022 su

  20. Slide 20: Effluent Monitoring Station Relocation

    Effluent Monitoring Station Relocation Impact – Improved reliability and security of monitoring Proposed monitoring location Current monitoring location Status • Draft EPL variation issued by EPA to allow cutover • Sampling station building installed on site and being fitted out • Anticipate ready f

  21. Slide 21: Community Update

    KOORAGANG ISLAND CRG MEETING 30 AUGUST 2021 COMMUNITY UPDATE NICOLE MASSON 21

  22. Slide 22: Community newsletter

    Community newsletter Issue 3 delivered Tuesday 24 August 2021 to Stockton and Fern Bay. Deliveries to other suburbs will occur after lockdown is lifted. 22 General

  23. Slide 23: Community Investment Program

    Community Investment Program Jenny’s Place: put a $10,000 grant towards the purchase of a new van. The vehicle will enable the transportation of families as well as the distribution of important items including food and clothing. Bayway Village Men’s Shed: put a $6,000 grant towards the purchase of

  24. Slide 24: Community Investment Program

    Community Investment Program Stockton RSL Sub Branch used a $3,700 grant to install a second flag pole at the Stockton war memorial. Stockton Public School unveiled its new garden. The area features a variety of play equipment to get kids moving but also plenty of space where students can sit and ha

  25. Slide 25: Community Investment Program

    Community Investment Program Soul Café will receive $30,000 a year for two years to employ a dedicated social worker. 25 General

  26. Slide 26: Other Business

    KOORAGANG ISLAND CRG MEETING 30 AUGUST 021 OTHER BUSINESS ALL 26

  27. Slide 27: Action Review

    KOORAGANG ISLAND CRG MEETING 30 AUGUST 2021 ACTION REVIEW NICOLE MASSON 27

  28. Slide 28: Actions

    Actions No outstanding actions. 28 General