ENBW Energie Baden-Wuerttemberg AG · XETR:EBK
ENBW Energie Baden-Wuerttemberg — EnBW Energie Baden-Württemberg — Investor Day (September 2013)
16 slides from ENBW Energie Baden-Wuerttemberg's investor day presentation, Sep 13, 2013

Slide 1: EnBW 2020: Expansion of Transmission Grids
EnBW 2020 Expansion of Transmission Grids Dr. Hans-Josef Zimmer – Chief Technical Officer Capital Market Day Karlsruhe, 13 September 2013 Energy needs new impetus

Slide 2: Agenda
EnBW Capital Market Day 13 September 2013 Agenda 1. Contribution of EnBW AG to the Germany’s “Energiewende“ 2. TransnetBW GmbH 3. Expansion of Transmission Grids 4. Direct Current Electricity Grids 5. Conclusions 2

Slide 3: Contribution of EnBW AG to Germany's Energiewende
EnBW Capital Market Day 13 September 2013 1. Contribution of EnBW AG to Germany’s “Energiewende“ Our Mission: high grid quality and safe generation Expansion of renewable energy generation › Onshore and offshore wind and hydropower in Germany and Turkey Development › Efficient, safe, reliable and co

Slide 4: TransnetBW GmbH (1/3)
EnBW Capital Market Day 13 September 2013 2. TransnetBW GmbH (1/3) EnBW’s ITO-certified transmission grid operator TransnetBW GmbH › 100% subsidiary of EnBW AG › Certified independent transmission grid operator (ITO-model) › Annual revenue: € 5.5 billion TenneT TSO GmbH › Employees: 380 50Hertz › Su

Slide 5: TransnetBW GmbH (2/3): The link between generation and consumption
EnBW Capital Market Day 13 September 2013 2. TransnetBW GmbH (2/3) The link between generation and consumption Responsibilities and duties: › Planning, construction and functioning of the transmission grids › Guarantee of supply security › System management and accounting grid management › Retention

Slide 6: TransnetBW GmbH (3/3): Volatile power generation impacts grid stability
EnBW Capital Market Day 13 September 2013 2. TransnetBW GmbH (3/3) Volatile power generation impacts grid stability Main challenges for the grids: › Increasingly volatile power generation environment impacts grid stability 2015 GW › Increasing number of grid stabilisation 50 interventions 40 › Many

Slide 7: Electricity grids are the backbone of the German Energiewende
EnBW Capital Market Day 13 September 2013 3. Expansion of Transmission Grids (1/5) Electricity grids are the backbone of the German “Energiewende” Investments through to 2020 in Germany EnBW´s Solutions (€ bn) 40 › New grids: new transmission lines can bridge the distance between focal point of prod

Slide 8: Economic growth of TransnetBW in regulated environment
EnBW Capital Market Day 13 September 2013 3. Expansion of Transmission Grids (2/5) Economic growth of TransnetBW in regulated environment New Grids – New Technologies – New Partnerships › Attractive, sustainable returns through improved framework requirements in the second regulation period › Expans

Slide 9: Investments TransnetBW through to 2022 ca. € 2.7 bn
EnBW Capital Market Day 13 September 2013 3. Expansion of Transmission Grids (3/5) Investments TransnetBW through to 2022 ca. € 2.7 bn Expansion TransnetBW-Transmission-Grid through to 2020 1 AC grid reinforcement “Badische Rheinschiene” › Grid section: 121 km › Scheduled completion: 2017 2 AC grid

Slide 10: Partnership with Amprion in Corridor A Ultranet
EnBW Capital Market Day 13 September 2013 3. Expansion of Transmission Grids (4/5) Partnership with Amprion in Corridor A “ULTRANET” › Construction of a DC power circuit that includes a converter station; Corridor A Emden (Ost) (Osterath – Philippsburg; length 340 km) › Transport capacity: 2.0 GW ›

Slide 11: Partnership with TenneT TSO in Corridor C
EnBW Capital Market Day 13 September 2013 3. Expansion of Transmission Grids (4/5) Partnership with TenneT TSO in Corridor C › Construction of three DC power circuits Wilster including converter stations Brunsbüttel Kreis Segeberg (Corridor C) › Transport capacity: up to 3.9 GW › Project partner Ten

Slide 12: German Incentive Regulation
EnBW Capital Market Day 13 September 2013 3. Expansion of Transmission Grids (5/5) German Incentive Regulation › The German Incentive Regulation has been in place since 2009 Regulatory › The second five-year period will start in 2014 framework › Guaranteed regulatory interest on incurred capital › 2

Slide 13: Direct Current Electricity Grids: Technology
EnBW Capital Market Day 13 September 2013 4. Direct Current Electricity Grids (1/2) Technology Technical Base Areas of Application › Transmission of high tension electricity over › Connecting up islands long distances with minimal losses › Crossing oceans › Coupling of AC systems with various levels

Slide 14: Direct Current Electricity Grids: Risks and possible countermeasures
EnBW Capital Market Day 13 September 2013 4. Direct Current Electricity Grids (2/2) Risks and possible countermeasures Risks Countermeasures › Size and performance capacity of the › Advance feasibility study completed converter (pilot character) › Study/engineering phases during › Shift of DC and AC

Slide 15: Conclusions: Investments with headroom-conserving participation models
EnBW Capital Market Day 13 September 2013 5. Conclusions (1/2) Investments with headroom-conserving participation models › Strategic features of the transmission grid: › A unique selling point for the EnBW (100% subsidiary) › Central player in the shaping of the “Energiewende” with › permanent conce

Slide 16: TransnetBW transmission grid expansion projects
EnBW Capital Market Day 13 September 2013 5. Conclusions (2/2) TransnetBW transmission grid expansion projects › Timeframe: 2013 – 2022 › Investment totalling approx. € 2.7 bn, of which: › AC-lines and transformers: ca. € 0.9 bn › DC-lines: ca. € 1.2 bn › DC-AC converters: ca. € 0.6 bn › Main projec
Source: Internet Archive copy of enbw.com
More decks from ENBW Energie Baden-Wuerttemberg AG
9M 2026 Earnings Presentation20 slides · Nov 12, 2026
Investor Presentation (November 2026)56 slides · November 2026
Investor Presentation (October 2026)65 slides · October 2026
Investor Presentation (September 2026)65 slides · September 2026
6M 2026 Earnings Presentation24 slides · Aug 7, 2026
Q1 2026 Earnings Presentation20 slides · May 12, 2026