  1. Slide 1: Multi-Asset Canadian Gold Developer

    Slide 1: Multi-Asset Canadian Gold Developer

    MULTI-ASSET CANADIAN GOLD DEVELOPER November 2026 | Corporate Presentation TSX: STLR / OTCQX: STLRF / FSE: O9D

  2. Slide 2: Forward Looking and Cautionary Statements

    Slide 2: Forward Looking and Cautionary Statements

    FORWARD LOOKING AND CAUTIONARY STATEMENTS1,2,3,4,5,11 This presentation contains “forward-looking information” within the meaning of applicable Canadian securities legislation. Forward-looking information includes, but is not limited to the advancement of the Tower Gold Project (“Tower”), Colomac Go

  3. Slide 3: STLLR Advantage

    Slide 3: STLLR Advantage

    SIZE & SCALABILITY STLLR VALUATION ADVANTAGE MINE-BUILDING EXPERIENCE 3

  4. Slide 4: Canadian Project Portfolio

    Slide 4: Canadian Project Portfolio

    CANADIAN PROJECT PORTFOLIO COLOMAC (2,4) 2023 PEA: 290,000 oz annual production over 11.2 years; US$1.59 billion in NPV5% & 56% IRR @ US$2,000/oz gold; 947 sq. km. underexplored greenstone TOWER Northwest Territories THE FLAGSHIP PROJECT (1) 2025 PEA: 273,000 oz annual potential production over 19 y

  5. Slide 5: Significant Combined Mineral Resource Estimates (MRE)

    Slide 5: Significant Combined Mineral Resource Estimates (MRE)

    SIGNIFICANT COMBINED MINERAL RESOURCE ESTIMATES (MRE) TOWER COLOMAC HOLLINGER STLLR 2025 MRE [1] 2023 MRE [2] 2025 MRE [11] COMBINED Ounces @ Grade Ounces @ Grade Ounces @ Grade Ounces @ Grade Indicated 3.7 Moz @ 0.84 g/t Au 2.8 Moz @ 1.45 g/t Au 0.4 Moz @ 0.35 g/t Au 6.9 Moz @ 0.92 g/t Au OPEN PIT

  6. Slide 6: Two Large-Scale Canadian Gold Projects

    Slide 6: Two Large-Scale Canadian Gold Projects

    TWO LARGE-SCALE CANADIAN GOLD PROJECTS CANADIAN GOLD PROJECTS Koz Au/ AuEq. LOM Gold Production - Bars Life of Mine Production Profile (Koz) Koz Au/ AuEq. 500 STLLR - PEA 8000 Only 6 Canadian Gold Projects: 450 FS/PFS 7000 +3.0 Moz PEA Life of mine potential production 400 6000 LOM Gold Production -

  7. Slide 7: Compelling Valuation

    Slide 7: Compelling Valuation

    COMPELLING VALUATION NOTABLE LARGE-SCALE GOLD PROJECTS GOLD DEVELOPERS Comparables Recent Acquisitions 2023-2026 EV/Total EV/LOM Net Takeout Developer Projects Resources Production Study Takeout Value/ (US$/oz) (US$/oz) Year Developer Acquiror Value Total Study (C$M) Resources >250Koz Average Annual

  8. Slide 8: Strong Balance Sheet & Solid Investor Support

    Slide 8: Strong Balance Sheet & Solid Investor Support

    STRONG BALANCE SHEET & SOLID INVESTOR SUPPORT WORKING CAPITAL & STOCK INFORMATION TSX: STLR OTCQX: STLRF FSE: O9D SHAREHOLDER BREAKDOWN Estimated working capital C$26 M Eric Sprott Agnico Eagle Shares outstanding 152.8 M 15% 11% Warrants/Avg. strike price 13.6 M; C$1.71 Institutional Retail/HNW Mana

  9. Slide 9: STLLR Strategy

    Slide 9: STLLR Strategy

    TOWER: DRIVE TO FID • STLLR • • STRATEGY HOLLINGER: CONTINUE ADVANCEMENT • COLOMAC: OPTION PLAY DISTRICT-SCALE UPSIDE • Evaluate strategies and opportunities 9

  10. Slide 10: Timmins: Tower, Hollinger

    Slide 10: Timmins: Tower, Hollinger

    ST =GOLD TIMMINS TOWER HOLLINGER

  11. Slide 11: Timmins Mining Camp

    Slide 11: Timmins Mining Camp

    TIMMINS MINING CAMP 80 MILLION GOLD OUNCES PRODUCED TOWER HOLLINGER TAILINGS 11

  12. Slide 12: Tower 2025 PEA: Large-Scale Highlights

    Slide 12: Tower 2025 PEA: Large-Scale Highlights

    TOWER 2025 PEA : LARGE-SCALE HIGHLIGHTS (1) Every US$500/oz move in Gold Price: 273,000 oz US$5.0B US$2.5B +/- US$1.0B (C$6.7B) (C$3.3B) Average Annual Potential Production (C$1.4B) After-tax Free Cash Flow LOM @ After-tax NPV5% over 19 years after-tax NPV5% US$3,200/oz Gold @ US$3,200/oz gold 26,03

  13. Slide 13: Tower 2025 PEA: Metrics

    Slide 13: Tower 2025 PEA: Metrics

    TOWER 2025 PEA : METRICS (1) TOWER – INFRASTRUCTURE LAYOUT “Real World”, Defensible Estimates Metrics LOM Total Garrison Area Golden Highway Mine life 19 years Area Average Annual Throughput 9.3Mtpa Waste Piles Strip ratio, including OVB 6.3 Processing Average mill head grade 0.99 g/t Au Facility Av

  14. Slide 14: Tower 2025 MRE

    Slide 14: Tower 2025 MRE

    TOWER 2025 MRE (1) Enhanced Geological Model: From first principles Golden Highway Area Tower OP Block Model (within 2025 PEA mine plan) Expanded UG: Using updated cut-off grades Garrison Area Potential to Expand Further: Mineralization open in all directions (1) 2025 TOWER MRE SUMMARY: Potential In

  15. Slide 15: Tower Jonpol Deposit

    Slide 15: Tower Jonpol Deposit

    TOWER JONPOL DEPOSIT – 2026 DRILL RESULTS MAP JONPOL DEPOSIT (12) High-Grade OP Mineralization 12.46 g/t Au* over 16.17 m (MGA26-281) 13.00 g/t Au* over 22.75 m (MGA26-268) 6.03 g/t Au* over 22.25 m (MGA26-253) 16.52 g/t Au* over 5.85 m (MGA26-248) Potential to Expand Pit Strike Western extension up

  16. Slide 16: Tower Proximity Targets

    Slide 16: Tower Proximity Targets

    TOWER PROXIMITY TARGETS TOWER Gold Pike Cluster of past producing mines • Chartrand • Grunnex • Hislop Mine • Ross Ming LC zone Potential strike extension of the Tower Gold Mineralization Halfway Lake/”Gap” Between Tower and Garrison Buffonta West Extension Higher-grade, past producer 16

  17. Slide 17: Hollinger Near-Term Value Potential

    Slide 17: Hollinger Near-Term Value Potential

    HOLLINGER (11) Hollinger Tailings Project - Mineral Resource Estimate 11 NEAR-TERM VALUE Indicated Inferred POTENTIAL Area Tonnes (Mt) Grade (g/t Au) Contained Gold (oz Au) Tonnes (Mt) Grade (g/t Au) Contained Gold (oz Au) Phase 1 16.1 0.41 212,000 4.1 0.43 56,000 Phase 2 20.2 0.31 200,000 3.6 0.31

  18. Slide 18: NWT Colomac

    Slide 18: NWT Colomac

    NWT COLOMAC 18

  19. Slide 19: Colomac 947km2 District-Scale Greenstone

    Slide 19: Colomac 947km2 District-Scale Greenstone

    COLOMAC 947KM2 DISTRICT-SCALE Treasure Island GREENSTONE 200km north of Yellowknife, NWT Northwest Territories, Canada COLOMAC Colomac Centre Area Colomac Main, 24/27 T̨ıłchǫ Nation Lands Goldcrest Grizzly Bear Colomac District-Scale Property Ice Roads (Jan-Mar) All-Season Highway Kim & Cass Area Da

  20. Slide 20: Colomac 2023 PEA Highlights

    Slide 20: Colomac 2023 PEA Highlights

    COLOMAC 2023 PEA HIGHLIGHTS (4) US$1.5B 290,000 oz Au US$2.1B (C$2.0B) (C$2.9B) Average Annual Potential After-tax NPV5% After-tax Free Cash Flow LOM Production over 11.2 years @ US$2,000/oz gold @ US$2,000/oz Gold 56.2% 16,000 tpd US$828 /oz Au After-tax IRR Average Daily Throughput All-In Sustaini

  21. Slide 21: Arctic Economic & Security Corridor (AESC)

    Slide 21: Arctic Economic & Security Corridor (AESC)

    ARCTIC ECONOMIC & SECURITY CORRIDOR (AESC) (13) Consensus corridor by Tł̨ıchǫ government & Yellowknives Dene First Nation 400KM All-Season Road From the Yellowknife to Nunavut, proposed by Tł̨ıchǫ Government, Yellowknives Dene First Nation, GNWT AESC Referred to the Major Projects Office Project of

  22. Slide 22: Colomac Main Deposit

    Slide 22: Colomac Main Deposit

    COLOMAC MAIN 7 km along strike. Metal Factor (g/t Au x thickness). Distribution Long Section (Looking West) DEPOSIT (2)(4) 3.5 3.0 2.5 2.0 1.5 1.0 Zones 96% OP Mineralization In Indicated category Mineralization Open In All Directions Near surface targets with high potential for *Model edge effect e

  23. Slide 23: 24/27: Next Major Deposit?

    Slide 23: 24/27: Next Major Deposit?

    24/27: NEXT MAJOR DEPOSIT? Geophysical survey map: Drill core with visible gold showings: +12 KM Strike Anomaly Higher-Grade, OP Mineralization TFS23-08 (318 g/t) TFS23-06 (502 g/t) 2 KM East of Colomac Main 10.22o z/t Au Over 0.40 m 16.14oz/t Au Over 0.50 m (2) 2023 24/27 Deposit MRE Indicated Infe

  24. Slide 24: ESG

    Slide 24: ESG

    STL GOLD ..

  25. Slide 25: Committed to Collaboration

    Slide 25: Committed to Collaboration

    COMMITTED TO COLLABORATION Tower: Identify and fill the gaps to complete required baseline data; Refinement of Project Description prior to submission. Environment Timmins: Strengthen relationships with local First Nation and Indigenous communities, as well as the Metis Nation of Ontario. Collaborat

  26. Slide 26: Committed to Sustainability

    Slide 26: Committed to Sustainability

    COMMITTED TO SUSTAINABILITY Spyder Lake Reclamation Solar Farm Build With Tł̨ıchǫ Investment Corp. (TIC) The Company completed the Spyder Lake reclamation at Colomac in TIC completed construction of solar farm for the Colomac in 2025. Solar will 2025. This milestone fulfills a portion of the Company

  27. Slide 27: Management & Board

    Slide 27: Management & Board

    STL — oly) MANAGEMENT 2 BOARD -

  28. Slide 28: Management

    Slide 28: Management

    MANAGEMENT Keyvan Salehi Salvatore Curcio John McBride Allan Candelario PRESIDENT & CEO, DIRECTOR CFO VP EXPLORATION VP INVESTOR RELATIONS AND CORPORATE DEVELOPMENT 20+ years of experience in 10+ years of financial, audit 15+ years of exploration, 15+ years of progressive Ontario mining and and assur

  29. Slide 29: Board

    Slide 29: Board

    BOARD Keyvan Salehi Morris Prychidny Angela Chu Rodney M. Cooper Mandy Wong President & CEO Chair Director Director Director 20+ years of experience in 35+ years of experience in the Seasoned executive with Professional engineer, and +15 years of executive finance Ontario mining and corporate mining

  30. Slide 30: The STLLR Advantage

    Slide 30: The STLLR Advantage

    SIZE & SCALABILITY THE STLLR VALUATION ADVANTAGE MINE-DEVELOPMENT EXPERIENCE 3

  31. Slide 31: Appendices

    Slide 31: Appendices

    APPENDICES 24

  32. Slide 32: Colomac 2023 PEA Mine Plan

    Slide 32: Colomac 2023 PEA Mine Plan

    COLOMAC Koz g/t Au 2023 PEA MINE 350 Potential Production & Grade Profile 2.00 PLAN(4) 300 250 1.50 290Koz/year over 11.2 years LOM (grading 1.28 g/t Au) 200 6.0M tonnes per annum throughput 1.00 150 96.3% gold recovery 64% conversion 100 0.50 from MRE to PEA mine plan C$654M Initial Capex; US$828/o

  33. Slide 33: Tower 2025 PEA Capex & Opex

    Slide 33: Tower 2025 PEA Capex & Opex

    TOWER CAPEX BREAKDOWN Capex Item Initial (C$M) Sustaining (C$M) Infrastructure $123 $12 2025 PEA(1) Power & Electrical $214 Water Management, TMF & Earthworks $135 $108 Surface Operations $29 Open Pit Mining $355 $769 CAPEX & OPEX UG Mining $834 Processing (including the mill) $265 General Services

  34. Slide 34: Tower Mineral Resource Estimate

    Slide 34: Tower Mineral Resource Estimate

    TOWER Indicated Inferred Deposit Method Ounces Au Ounces Au Tonnes (Kt) Grade Au (g/t) Tonnes (Kt) Grade Au (g/t) (oz) (oz) MINERAL Golden Highway Area OP 4,294 1.32 182,200 1,640 1.61 84,900 55 Zone UG 108 1.68 5,800 245 1.77 13,900 RESOURCE OP 3,958 1.95 248,200 10,416 1.27 425,300 Westaway UG 1,1

  35. Slide 35: Colomac 2023 Mineral Resource Estimate

    Slide 35: Colomac 2023 Mineral Resource Estimate

    COLOMAC INDICATED INFERRED Mining Tonnes Grade Tonnes Grade method (000s) (g/t Au) Ounces (oz) (000s) (g/t Au) Ounces (oz) 2023 MINERAL OP UG 59,945 10,486 1.45 1.73 2,804,000 583,000 11,070 13,364 2.33 2.03 830,000 872,000 RESOURCE Colomac Total OP+UG 70,432 1.50 3,387,000 24,434 2.17 1,702,000 EST

  36. Slide 36: Tower & Colomac Preliminary Economics

    Slide 36: Tower & Colomac Preliminary Economics

    TOWER 2025 PEA COLOMAC 2023 PEA TOWER & COLOMAC LT Gold Price Mine Life (US$/oz) (Years) $2,500 19 $1,600 11 PRELIMINARY Total Mineralized Matrial (Mt) 177 67 Mined Total Waste Mined ECONOMICS(1)(4)* (Mt) 941 554 (waste + OVB) Strip Ratio (incl OVB) (w:o) 6.3 9.04 Head Grade (g/t) 0.99 1.57 Operatio

  37. Slide 37: End Notes

    Slide 37: End Notes

    END NOTES 1. For more information on the 2025 Tower Gold Project PEA and MRE respectively, please refer to the Technical Report titled “Preliminary Economic Assessment NI 43-101 Technical Report Tower Gold Project” dated June 30, 2025 available on STLLR Gold’s profile on SEDAR+ www.sedarplus.ca and t

  38. Slide 38: Investors

    Slide 38: Investors

    Investors investors@stllrgold.com +1 (416) 863-2105 TSX: STLR / OTCQX: STLRF / FSE: O9D 38