Caledonia Mining Corporation PLC · AMEX:CMCL

Caledonia Mining — Q3 2026 Earnings Presentation

28 slides from Caledonia Mining's earnings presentation, Nov 12, 2026

  1. Slide 1: Q3 2026 Results Presentation

    Q3 2026 Results Presentation

  2. Slide 2: Disclaimer and Forward-Looking Statements

    Disclaimer and Forward-Looking Statements This presentation has been prepared solely for information and does not purport to contain all of the information that may be necessary or desirable to fully and accurately evaluate Caledonia Mining Corporation Plc (“Caledonia” or “the Company”) or its busin

  3. Slide 3: The Presenting team

    The Presenting team Ross Jerrard Victor Gapare Mark Learmonth Chief Financial Executive Chief Executive Officer Officer Director and Director Craig Harvey Maurice Mason Vice President Vice President Technical Services Corporate Development and Investor Relations NYSE/AIM/VFEX: CMCL 3

  4. Slide 4: Summary

    Summary Production Gold price EBITDA 17,030 oz US$4,134/oz Compressed air shortage delayed US$28.1m Realised price up 20% high-grade mining; ~1,100 oz 9 months: $107.8m retained in plant Resources Bilboes financing Dividend US$150m 2.178Moz US$0.14 Blanket M&I up 22%; Motapa maiden Interim facility

  5. Slide 5: Production

    Production 17,030 49,158 69,000–72,500 oz produced in Q3 2026 oz produced in the nine months Revised FY 2026 production guidance to 30 September 2026 (oz) What held back Q3 Q4 2026 and 2027 focus: consistency • Compressed air shortage delayed high-grade • Commission compressor capacity to support mi

  6. Slide 6: Post-Quarter Update: Blanket October production

    Post-Quarter Update Blanket October production Blanket Mine Production (oz) Tonnes milled (t) Grade (g/t) Recovery (%) October 2026 6 940 75 500 3.07 93.1 Blanket: production & elution K-pits (oxide mining and processing) • Re-focused resources on L30 and L34 production • Test leach pads being loade

  7. Slide 7: Review of operating results

    Review of operating results

  8. Slide 8: Safety performance strengthening

    Safety performance strengthening Lost-time injuries LTI-free record Hours worked 0 518 days 7.94m hours In Q3 2026 Consecutively LTI-free Worked without a lost-time injury Safety activity Total injuries 3 injuries Targets exceeded For inspections, hazard reporting and planned job Down from five in Q

  9. Slide 9: Consistent tonnes delivered to Blanket Mine plant

    Consistent tonnes delivered to Blanket Mine plant Tonnes Milled & Grade (2023 – Q3 2026) 4.5 200,000 Grade Tonnes Milled (t) Head grade (g/t) 3.5 150,000 • Q3 grade below 3.17 g/t target: compressed air shortage at 2.5 100,000 deeper, higher-grade areas 1.5 50,000 • Mill throughput sustained with lo

  10. Slide 10: Review of financial results

    Review of financial results

  11. Slide 11: Financial Results

    Financial Results Summary 3 months ended Ref 9 months ended 30-Sep 30-Sep Change Change Gold produced down 11% 2026 2025 2026 2025 Compressed air shortage; gold retained in plant (%) (%) affecting working capital. Gold sold (oz) 19,082 20,792 -8% 50,676 60,667 -16% Gold produced* (oz) 17,030 19,106

  12. Slide 12: Financial Results (continued)

    Financial Results (continued) Consolidated profit or loss statement 3 months ended 9 months ended ($ 000) Ref 30-Sep 30-Sep Change YTD YTD Change 2026 2025 (%) 2026 2025 (%) $78.9m Revenue Combination of high average gold price (+20%), partly Revenue 78,932 71,440 10% 221,279 192,927 15% offset by l

  13. Slide 13: Financial Results (continued): cash flows

    Financial Results (continued) Consolidated statements of cash flows 3 months ended 9 months ended ($ 000) Ref 30-Sep 30-Sep 2026 2025 Change (%) 2026 2025 Change (%) Cash inflow from operations 31,040 25,992 19% 93,027 78,659 18% $31m cash inflow from operations (+19%). Finance costs paid - Converti

  14. Slide 14: Financial Results (continued): Liquidity

    Financial Results (continued) Liquidity 30 September, ($‘ 000) Ref 2026 Cash on hand 161,866 Cash on hand represents cash at bank and cash Bullion on hand 14,852 equivalents. Gold sales receivables 6,338 TOTAL BEFORE UTILISATION OF FACILITIES 183,056 Bullion on hand represents 3,733 gold ounces proc

  15. Slide 15: Updated Cost Guidance

    Updated Cost Guidance Production, On-mine & AISC 2026 guidance Previous Revised Costs On-mine and AISC, updated to reflect the Blanket gold production (oz) 72,000–76,500 69,000–72,500 effect of the lower production guidance. On-mine cost (US$/oz sold) 1,600–1,800 1,700–1,900 Capex AISC (US$/oz sold)

  16. Slide 16: Bilboes

    Bilboes

  17. Slide 17: Bilboes at a glance

    Bilboes A FULLY OWNED, LARGE-SCALE PROJECT TARGETING AT A GLANCE FIRST GOLD IN OCTOBER 2028 AND C.277KOZ CONSOLIDATED GROUP PRODUCTION IN 2029 1.75Moz Proven & probable reserves c. 200koz 100% owned and fully permitted; approved for development following Expected first full-year production Harare th

  18. Slide 18: Bilboes: What we have done so far

    Bilboes What we have done so far EPCM and FEED Housing strategy Earthworks EPCM contracts signed and FEED in advanced Contractor and mine employee housing strategy Contract signed; contractor started October – stage and associated support facilities finalised and clearing and grubbing of the plant s

  19. Slide 19: Bilboes: What is next

    Bilboes What is next NOVEMBER 2026 NOVEMBER 2026 END NOVEMBER 2026 Crushers, screens, feeders and samplers BIOX proprietary equipment Construction power Packages under evaluation; contract signing targeted Tender under evaluation; contract signing targeted Contract to be in place END NOVEMBER 2026 E

  20. Slide 20: Bilboes funding strategy: US$150m interim facility signed

    Bilboes funding strategy US$150m interim financing facility signed FOUR-PILLAR FUNDING STRATEGY: THE FACILITY IS PILLAR 3 OF 4 1 - Gold price hedging 2 - Convertible notes 3 - Interim facility 4 - Project finance Completed: Put options on 3,000 Completed: US$150m upsized Completed: Up to US$150m fro

  21. Slide 21: Bilboes funding overview

    Bilboes funding overview Fully funded at $590m under both gold price scenarios Estimated total funding requirement of $590m $3,500/oz $4,000/oz Working Capital $25m (4%) Future Net Cash Flow to 2028 Future Net Cash Flow to 2028 $90m (15%) Capitalised Interest $80m (14%) $130m (22%) Senior Debt & Oth

  22. Slide 22: Exploration

    Exploration

  23. Slide 23: Mineral Resources up 22% to 2.178 million ounces of gold

    Mineral Resources up 22% to 2.178 million ounces of gold Blanket Mine +22% 2.178Moz 17.7Mt +48% Mineral Increase in underground Gold contained in the Contained at a grade of Increase in measured measured and indicated updated resource 3.83 g/t resources Resource resources Update Underground growth M

  24. Slide 24: Surface Mining Activities

    Surface Mining Activities Plant Site Pregnant, Barren, Overflow, Emergency Ponds Heap Leach Pad Heap Leach Pad being loaded. Approx. 10Kt loaded at present Heap Leach • EIA granted for Surface mining activities • 10,000 tonnes loaded to pad for project metric testing • Column testing returned recove

  25. Slide 25: Motapa Exploration – Investing for Future Growth

    Motapa Exploration – Investing for Future Growth 379,000 oz 131,000 oz ~US$40.45 Measured and Indicated Mineral Inferred Mineral Resources: Combined exploration discovery and Resources: 7.8Mt at 1.51 g/t 2.7Mt at 1.48 g/t acquisition cost per M&I ounce Maiden Mineral Resource, 28 August 2026 Investi

  26. Slide 26: Motapa Exploration – Investing for Future Growth

    Motapa Exploration – Investing for Future Growth Investing for future growth • Motapa located directly to the south of Bilboes. • They share a common boundary • Clear synergies available for the greater Bilboes / Motapa mining lease areas 26 NYSE/AIM/VFEX: CMCL

  27. Slide 27: Strategic Focus

    Strategic Focus Blanket: restore production consistency 1 More compressed-air and elution capacity to recover retained gold, supporting stronger Q4 2026 and 2027 production. Bilboes: secure funding, deliver first gold 2 First gold targeted for Q4 2028. Three of four funding pillars secured, includin

  28. Slide 28: Any Questions?

    Any Questions?

Caledonia Mining — Q3 2026 Earnings Presentation on 6ix