  1. Slide 1: Construction Update

    Construction Update September 2016 (US$ in Millions, Unless Otherwise Indicated) Lydianinternational.co.uk | TSX:LYD 1

  2. Slide 2: Cautionary Statements

    Cautionary Statements Forward Looking Information & Estimates of Reserves and Resources Certain information contained in this presentation, including any information relating to Amulsar's expected future performance, is "forward looking". All statements in this presentation, other than statements of

  3. Slide 3: Amulsar Gold Project – Armenia

    Amulsar Gold Project – Armenia Compelling Asset Generating Value Through Construction • 100%-owned, emerging as a leading gold development project • Large scale operation to be Armenia’s largest gold mine • Low cost production profile benefiting from: • Conventional mining and processing • Low waste

  4. Slide 4: Amulsar Gold Project – Location

    Amulsar Gold Project – Location Exceptional Access & Regional Infrastructure • 170 km southeast of Yerevan • Located on Armenia’s primary infrastructure corridor • Paved access to site Georgia • Local workforce • High-voltage power on site • Internet connection in place Azerbaijan • Water on site fo

  5. Slide 5: Large Scale Oxide Deposit

    Large Scale Oxide Deposit Initial 10-Year Mine Plan from 2.4 Million Oz P+P Reserves • Pit design optimized at $912/oz gold; economic evaluation at $1,150/oz gold • Excellent operating profile • Waste : Ore ratio at 2.4 – including 26 million tonnes of inferred classified as waste • Life-of-mine gol

  6. Slide 6: Amulsar Feasibility Study

    Amulsar Feasibility Study Initial Capital Optimized at $369.9 Million • Capital efficiencies achieved • Site layout for constructability and operability • Crushing plant – supported by column leach tests and blast fragmentation study • Mine fleet aligned with ramp-up US$ in Millions and stage of ope

  7. Slide 7: Amulsar Feasibility Study

    Amulsar Feasibility Study Amulsar Mine Profile and Economics Q4 2015 Operating Profile NI 43-101 Initial Mine Life (Years) 10.0 Annual Tonnes Processed 9,700,000 Waste : Ore Ratio 2.4 Gold Grade (g/t) 0.78 Gold Recovery 87.2% Annual Gold Produced (oz) 211,000 All-in Sustaining Costs ($/oz) $585 Econ

  8. Slide 8: Growth Potential

    Growth Potential Upside within Inferred Resource and at Depth • Resource Conversion • Within current pits: 26 million tonnes at 0.57 g/t inferred. • Optimizing to include inferred adds: 40 million tonnes at 0.73 g/t. Mostly limited by drilling density • Open potential below pit limits (below East-We

  9. Slide 9: Project Financing

    Project Financing Flexible Financing Plan Nearing $440 Million  Equity • RCF / Orion: $ 80 million • Public Offering: $ 29 million • EBRD: $ 10 million  Term Loan & COF • Orion / RCF $160 million US$ in Millions • Libor + 6.5%; 5.5 year term • COF @ Libor + 9.5% Equipment Leasing, $75 Equity, $119

  10. Slide 10: Mining, Access & Construction Rights

    Mining, Access & Construction Rights Strong Support for Amulsar Development at All Levels  National Level rights fully approved • Mining Right through the Ministry of Energy & Natural Resources • Environmental Impact Assessment through the Ministry of Nature Protection • Technical Safety Program th

  11. Slide 11: Amulsar Project Design & Engineering

    Amulsar Project Design & Engineering Key Engineering Underway; Leveraging 2015 Value Engineering Heap Leach Facility • Most advanced from Value Engineering (Samuel) • Detailed engineering +80% complete Material Handling Systems • Vendor engineering reducing timelines (Sandvik) • Basic engineering by

  12. Slide 12: Organizational Development

    Organizational Development Rapidly Building Core Competencies for Construction • Construction engineering Construction • Project controls • Construction management • Health & safety Sustainability • Environmental compliance & monitoring • Community relations • Human resources Project Support • Procu

  13. Slide 13: Drilling: 2016 Program

    Drilling: 2016 Program Multiple Objectives Supporting Mine Development & Upside • Infill Drilling: Convert inferred to indicated, bring down Tigranes/Artavasdes wall • Grade Control: 20 metre centers for early mine planning • Geotechnical: Confirmatory in key construction footprints Measured Indicat

  14. Slide 14: Mining Fleet

    Mining Fleet Vendor Selected & Orders to Start in Q4 2016 • Trade-off study completed, with CAT selected • Cost & lead-times within project budget & schedule • Coordinating equipment purchases with CAT financing Initial Sustaining Primary Components Capex Capex New Purchases: CAT 6040 Shovel 1 1 CAT

  15. Slide 15: Early Works

    Early Works Clearing Path for Construction Start • Pipeline diversion from HLF footprint • Repair community water channel • Construction accommodations • Hotel renovation for accommodations, commissary and Jermuk offices • Preparing for temporary camp platform and utilities • On-site offices platfor

  16. Slide 16: Sustainability

    Sustainability Cornerstone of Our Construction & Operating Philosophy • Amended Environmental Impact Assessment • Aligns to 2015 feasibility study • All public hearings completed, and approval received in May 2016 • Environmental and social frameworks • ESIA amended; held for public consultation; an

  17. Slide 17: Comparable Development Stage Companies

    Comparable Development Stage Companies Targeting to Re-Rate Central to Construction Strategy Market Cap C$ (millions) $250 $414 $2,653 $792 $519 $2,017 P/NAV 0.5x 0.6x 0.9x 0.9x 0.9x 1.1x Volta Asset Name Amulsar Brucejack Hardrock Yaramoko Morelos Grande Asset Location Armenia Brazil B.C. Ontario B

  18. Slide 18: The Value Proposition

    The Value Proposition 2016/2017 Transformational Years Path forward for construction to becoming a mid-tier gold producer Financed to execute on the construction strategy Strong government and community support Low all-in sustaining costs Robust mining project with upside potential 18

  19. Slide 19: Thank You

    Thank You 19 Lydianinternational.co.uk | TSX:LYD

  20. Slide 20: Lydian International Corporate Summary

    Lydian International Corporate Summary • Ordinary Shares: LYD Trading Symbols • Publicly-trading Warrants LYD.WT • Ordinary Shares 699 million Share Capital • Publicly-trading Warrants 99 million • Unlisted Warrants 5 million Market Capitalization • Recent price of C$0.50 C$349 million • Sourced fro

  21. Slide 21: Board of Directors

    Board of Directors Development Oriented – Independent, Diverse Experience Gordon Wylie • 32 yrs mining experience • AngloGold-Ashanti Global (Non-executive director & Chair) • Exploration manager Howard Stevenson • 25 yrs global mining experience • Alacer Gold President & COO (President & CEO) • Mer

  22. Slide 22: Mineral Reserves & Mineral Resources

    Mineral Reserves & Mineral Resources Notes Notes to Mineral Reserves: 1. The pit design was based on an optimization shell generated on gold only at a gold price of $912/oz. 2. The economic evaluations were based on a gold price of $1,150/oz and a silver price of $16.00/oz. 3. A diluted gold cut-off

  23. Slide 23: Presentation Notes

    Presentation Notes LYDIAN