  1. Slide 1: Terramin Australia ASX Shareholder Report

    TERRAMIN AUSTRALIA limited ABN 67 062 576 238 TERRAMIN AUSTRALIA timited ASX Shareholder Report Enquiries on this report or the Company business may be directed to: Kevin Moriarty Executive Chairman 0408 173 157 or Colin G Jackson Director 0400 892 612 Website Address: terramin.com.au Terramin is a

  2. Slide 2: Terramin Australia Limited

    TERRAMIN AUSTRALIA limited

  3. Slide 3: Slide 3

  4. Slide 4: What is ZINC used for?

    What is ZINC used for? _ ll Dress & bree Chomnieale Zinc semi-manuiacturing Total

  5. Slide 5: Zinc price and demand 1998-2004

    1998 1999 2000 2001 2002 2003 2004

  6. Slide 6: Slide 6

  7. Slide 7: Lead

    LEAD_

  8. Slide 8: The Assets

    ae ee ues mennianie Dam : The Assets

  9. Slide 9: Mine and ore production

    MINE -..| GRE PROD'N : WAME {tonnes} _ RONTENT A| Kanmanton | 4000,000 | 1%) Ce : q <1. Cu, 20% Ph, 25% Zn, po Wheel Elen | . 80.000 FRgit Ag, 4.5 gt Au" 7% Ph, 2% En, Aclare 11,000 SBUgiE Ag, 2g Au* “taliskar 1,800 7% Ph, Vogt Ag Al Strathalbyn 3000" | 20%+ PB Zn || Bremer | sebsianfal | 14% Cu _ C

  10. Slide 10: Ppooo016

    Ppooo016 a pp000017 RS & -pp000019 -ppov0024. a Pp900028- - PDOO0029: --Ppa00030

  11. Slide 11: Slide 11

  12. Slide 12: Zn in soil

    Zn in soil & {J 260.ppm C) >1007—m ‘+ Limit of RAB Drilling & ‘

  13. Slide 13: Zn in soil

    Zn insolt i og BO pom C) > 100.p0m

  14. Slide 14: Prime target areas for base metal deposits

    | Prime target areas for “is. base metal deposits — . ALTERATION HALG °?. (ANOSATY

  15. Slide 15: Prime target areas for base metal deposits

    “sj Prime. target areas for wf base metal deposits PROSPECTNE STRATIGRAPHY OR STRUCTURE

  16. Slide 16: Rankine Deposit, Angas Zinc Project

    RANKINE DEPOSIT 5.2m 17% Z2nE 3m 4.4% ZnE yo, oil Z ANGAS ZINC PROJECT o@ Drill hole pierce point Immediate target zone Prospective zone 18 2i% ZNE. View: Looking West VN ia tet. | |

  17. Slide 17: Rankine Deposit, Angas Zinc Project

    RANKINE DEPOSIT 4m @ 14% ANGAS ZINC PROJECT o@ Drill hole pierce point Immediate target zone Prospective zone 7000 MN =

  18. Slide 18: Extensions since January 2004

    Extensions since January 2004

  19. Slide 19: Location relative to Adelaide

    oe to Adelaide Ratention Bani. Strathalbifa “Town Centeg, TS kt . WES STERN.

  20. Slide 20: Zinc price and cumulative EBITDA

    Zine $1030 Cumulative EBITDA Pe $750 AS=US 90.72

  21. Slide 21: Mt Garnet Project versus Angas Project

    Mt Garnet Project — $54m capex March 2002 Angas Project . : $21m capex. ®. Initial metal 300, 000 tonnes (avg. 10%). ; ~_ ~ 200, 000 tonnes (eve. 20%) - s. * subsequent: Surveyor high grade. ~ ; ~. 4 Mt high grade drill-defined resource @ widespread portfolio prospects for growth. _ Menninnie Dam -(

  22. Slide 22: Ppooo016

    Ppooo016 a pp000017 RS & -pp000019 -ppov0024. a Pp900028- - PDOO0029: --Ppa00030

  23. Slide 23: Slide 23

  24. Slide 24: Terramin at work

    Terramin at work