Terramin Australia Limited · ASX:TZN
Terramin Australia — Investor Presentation (May 2004)
24 slides from Terramin Australia's investor presentation, May 12, 2004
Slide 1: Terramin Australia ASX Shareholder Report
TERRAMIN AUSTRALIA limited ABN 67 062 576 238 TERRAMIN AUSTRALIA timited ASX Shareholder Report Enquiries on this report or the Company business may be directed to: Kevin Moriarty Executive Chairman 0408 173 157 or Colin G Jackson Director 0400 892 612 Website Address: terramin.com.au Terramin is a
Slide 2: Terramin Australia Limited
TERRAMIN AUSTRALIA limited
Slide 3: Slide 3
Slide 4: What is ZINC used for?
What is ZINC used for? _ ll Dress & bree Chomnieale Zinc semi-manuiacturing Total
Slide 5: Zinc price and demand 1998-2004
1998 1999 2000 2001 2002 2003 2004
Slide 6: Slide 6
Slide 7: Lead
LEAD_
Slide 8: The Assets
ae ee ues mennianie Dam : The Assets
Slide 9: Mine and ore production
MINE -..| GRE PROD'N : WAME {tonnes} _ RONTENT A| Kanmanton | 4000,000 | 1%) Ce : q <1. Cu, 20% Ph, 25% Zn, po Wheel Elen | . 80.000 FRgit Ag, 4.5 gt Au" 7% Ph, 2% En, Aclare 11,000 SBUgiE Ag, 2g Au* “taliskar 1,800 7% Ph, Vogt Ag Al Strathalbyn 3000" | 20%+ PB Zn || Bremer | sebsianfal | 14% Cu _ C
Slide 10: Ppooo016
Ppooo016 a pp000017 RS & -pp000019 -ppov0024. a Pp900028- - PDOO0029: --Ppa00030
Slide 11: Slide 11
Slide 12: Zn in soil
Zn in soil & {J 260.ppm C) >1007—m ‘+ Limit of RAB Drilling & ‘
Slide 13: Zn in soil
Zn insolt i og BO pom C) > 100.p0m
Slide 14: Prime target areas for base metal deposits
| Prime target areas for “is. base metal deposits — . ALTERATION HALG °?. (ANOSATY
Slide 15: Prime target areas for base metal deposits
“sj Prime. target areas for wf base metal deposits PROSPECTNE STRATIGRAPHY OR STRUCTURE
Slide 16: Rankine Deposit, Angas Zinc Project
RANKINE DEPOSIT 5.2m 17% Z2nE 3m 4.4% ZnE yo, oil Z ANGAS ZINC PROJECT o@ Drill hole pierce point Immediate target zone Prospective zone 18 2i% ZNE. View: Looking West VN ia tet. | |
Slide 17: Rankine Deposit, Angas Zinc Project
RANKINE DEPOSIT 4m @ 14% ANGAS ZINC PROJECT o@ Drill hole pierce point Immediate target zone Prospective zone 7000 MN =
Slide 18: Extensions since January 2004
Extensions since January 2004
Slide 19: Location relative to Adelaide
oe to Adelaide Ratention Bani. Strathalbifa “Town Centeg, TS kt . WES STERN.
Slide 20: Zinc price and cumulative EBITDA
Zine $1030 Cumulative EBITDA Pe $750 AS=US 90.72
Slide 21: Mt Garnet Project versus Angas Project
Mt Garnet Project — $54m capex March 2002 Angas Project . : $21m capex. ®. Initial metal 300, 000 tonnes (avg. 10%). ; ~_ ~ 200, 000 tonnes (eve. 20%) - s. * subsequent: Surveyor high grade. ~ ; ~. 4 Mt high grade drill-defined resource @ widespread portfolio prospects for growth. _ Menninnie Dam -(
Slide 22: Ppooo016
Ppooo016 a pp000017 RS & -pp000019 -ppov0024. a Pp900028- - PDOO0029: --Ppa00030
Slide 23: Slide 23
Slide 24: Terramin at work
Terramin at work
Terramin Australia — Investor Presentation (May 2004) on 6ix