  1. Slide 1: Oroco Resource Corp.: Advancing the Santo Tomás Copper Project to Pre-Feasibility

    Corporate Presentation October 2026 Oroco Resource Corp. Advancing the Santo Tomás Copper Project to Pre-Feasibility TSX-V: OCO|Frankfurt: OR6|US: ORRCF

  2. Slide 2: Disclaimer & Technical Disclosure

    Disclaimer & Technical Disclosure TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Disclaimer & Technical Disclosure FORWARD-LOOKING STATEMENTS This presentation contains forward-looking statements and forward-looking information within the meaning of applicable securities legislation, including statements regar

  3. Slide 3: Santo Tomás: A Compelling Investment Case

    Compelling Investment Case TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Santo Tomás: A Compelling Investment Case 01 THE RIGHT METAL 02 SCALE 03 ECONOMICS* ▪ Copper is undergoing a profound ▪ NI 43-101 compliant: ▪ $1.48Bn post-tax NPV₈, 22.2% IRR structural transformation from a Indicated: +4.5 Bn lb. (2 Mt

  4. Slide 4: Located Within the Laramide Porphyry Copper Belt

    Location within the Laramide and La Entrada al Pacifico TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Located Within the Laramide Porphyry Copper Belt Santo Tomás Pedigree ▪ Laramide Metallogenic Belt of southwestern North America ▪ The second-largest porphyry copper province in the world ▪ Hosts 80% of North

  5. Slide 5: Mexico, a Large, Globally Integrated Emerging-Market Economy

    Mexico, an Economic Powerhouse TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Mexico, a Large, Globally Integrated Emerging-Market Economy ▪ Mexico’s Upper-Middle Income economy >$2 trillion GDP ranks it 13th globally ▪ Large, diversified, globally integrated industrial economy ▪ Global FDI ranking: ~10th, 5th

  6. Slide 6: Infrastructure Rich La Entrada al Pacifico

    Abundant Existing Infrastructure within La Entrada al Pacifico TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Infrastructure Rich La Entrada al Pacifico ▪ Located at low elevation in coastal northwest México, in La Entrada al Pacífico corridor, a multimodal trade & transportation initiative supported by the US

  7. Slide 7: Large-Scale, Shallow, Porphyry Mineralization

    Large-Scale, Shallow, Porphyry Mineralization TSX-V: OCO · OTCQB: ORRCF · BF: OR6 1.07B tonnes Indicated & Inferred Resource Porphyry Cu System 540.6 Mt 530.3 Mt 0.51% CuEq* INDICATED 0.33% Cu 0.37% CuEq* INFERRED 0.31% Cu 0.35% CuEq* AVG. MILL FEED CuEq* FIRST 7 YEARS (PEA) ▪ Vein, disseminated & f

  8. Slide 8: Mineralization at Santo Tomás

    Mineralization at Santo Tomás TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Mineralization at Santo Tomás Core Mineralization Characteristics ▪ Cu-Mo Sulphide System: Dominated by chalcopyrite (Cpy), molybdenite (Mo), pyrite (Py), and magnetite (Mt) assemblies. ▪ Structural Controls: Prominent B-type veinlets

  9. Slide 9: Phase One Work Program at Santo Tomás - $60m Invested in 2020-2024

    Phase One Work Program TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Phase One Work Program at Santo Tomás - $60m Invested in 2020-2024 ~ 5.2 km ▪ Optimized and Updated MRE. PEA completed in August 2024 ▪ 200 km , 3D, Induced Polarization ("DCIP") geophysical survey ▪ 76 drill holes / 49,000 m of drilling wit

  10. Slide 10: 2024 PEA (Ausenco, SRK) - Long Life, Capital Efficient, Low C1 Cash Cost

    2024 Preliminary Economic Assessment TSX-V: OCO · OTCQB: ORRCF · BF: OR6 2024 PEA (Ausenco, SRK)* - Long Life, Capital Efficient, Low C1 Cash Cost $1.48 billion 22.2% 3.8 Years $1.1 billion ▪ Post-tax NPV₈ ▪ Post-tax IRR ▪ Post-tax payback from first ▪ Initial CAPEX ▪ Pre-tax NPV₈ US$2.64B ▪ Pre-tax

  11. Slide 11: Phase Two Work Program 2026-2027: Leading to the Pre-Feasibility Study

    Phase Two Work Program TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Phase Two Work Program 2026-2027: Leading to the Pre-Feasibility Study ~ 5.2 km SOUTH ZONE NORTH ZONE BRASILES Phase Two drilling focus – Completed holes shown with assay intervals. In-process and planned holes shown as traces only ▪ 20,000

  12. Slide 12: Phase Two Drilling: Resource Conversion, Expansion, and Localized Higher-Grade

    Phase Two Work Program TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Phase Two Drilling: Resource Conversion, Expansion, and Localized Higher-Grade ▪ Resource conversion: 20-25,000 m/60 are planned primarily to upgrade inferred resources to indicated. ▪ Resource expansion: Phase 2 drilling carries potential f

  13. Slide 13: Ancillary Studies in Support of the PFS

    Phase Two Work Program TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Ancillary Studies in Support of the PFS ▪ Mine planning: Refine pit design, haulage, and fleet optimization to reduce stripping, haulage distances, and operating costs. ▪ Comminution: Variability testing could lower grinding energy requireme

  14. Slide 14: A Plan México Strategic Project and Located within La Entrada al Pacifico

    Strategic Project Designation TSX-V: OCO · OTCQB: ORRCF · BF: OR6 A Plan México Strategic Project and Located within La Entrada al Pacifico: Aligned with National and Regional Economic Development Plans ▪ Strategic Project recognition: In May 2025 Santo Tomás was designated a “Strategic Project” und

  15. Slide 15: Vainilla Property Option

    Vainilla Property TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Vainilla Property Option Strategic Expansion ▪ Vainilla represents a potential porphyry copper occurrence south of Santo Tomás and Bahuerachi ▪ Enhances control of the Santo Tomás porphyry copper belt ▪ Oroco holds an option to acquire a 91.6% in

  16. Slide 16: Management Team

    Management TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Management Team Charles Cryer Ian Graham Faysal Rodriguez CEO and Director President and Director Director Capital Markets Leadership Project Development Strategic Growth & Corporate Development 30+ years of global mining and capital P. Geo with over 30

  17. Slide 17: Senior Technical Team: Ranchito Technical

    Senior Technical Team: Ranchito TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Senior Technical Team: Ranchito Technical Miguel Quintana Hernandez — Chief Geologist Coordinating multidisciplinary teams across exploration, resource development, environmental management, government relations, and community engag

  18. Slide 18: Metrics: Competitive Grade and Significant Contained Copper Resource

    Peer Comparisons TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Metrics: Competitive Grade and Significant Contained Copper Resource orocoresourcecorp.com

  19. Slide 19: Metrics: Significant Annual Production and Low CAPEX

    Peer Comparisons TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Metrics: Significant Annual Production and Low CAPEX orocoresourcecorp.com

  20. Slide 20: Low Production Cost: $1.54/lb. LoM C1 cash cost, $2.00/lb. AISC

    Low C1 and AISC Production Cost TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Low Production Cost: $1.54/lb. LoM C1 cash cost, $2.00/lb. AISC (by-product basis) ▪ Aided by a low strip ratio, simple metallurgy, robust early LoM grade, C1 and C3 costs are low; nearing lowest Quartile . ▪ Numerous opportunities

  21. Slide 21: Management Team cont.

    Management cont. TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Management Team BOARD & OFFICERS SENIOR TECHNICAL CONSULTANTS Craig J. Dalziel — Chairman Andrew Ware, RM-SME — Principal Geological Consultant; 40+ years of resource company financial, investment and corporate governance experience. Qualified Per

  22. Slide 22: Capital Structure & Corporate Overview

    Capital Structure & Corporate Overview TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Capital Structure & Corporate Overview Common shares outstanding 325,954,143 PROJECT OWNERSHIP Share purchase warrants 43,294,363 Net 88.5% interest in the 1,173-ha Santo Tomás Core Concessions, and 80% in surrounding concess

  23. Slide 23: 2024 Mineral Resource Estimate

    Mineral Resource Estimate and Metallurgy Notes TSX-V: OCO · OTCQB: ORRCF · BF: OR6 2024 Mineral Resource Estimate Notes: After PEA Table 1-6 1. Mineral resources are not mineral reserves and do not have Mineral Resource Statement for the Santo Tomas Porphyry Copper Project (Effective Date July 23, 2

  24. Slide 24: México: Recent Open Pit Development Permit Issuance Record

    Select Recent Permits Issued in Mexico TSX-V: OCO · OTCQB: ORRCF · BF: OR6 México: Recent Open Pit Development Permit Issuance Record Date Co / Project State Approval / milestone Situation Silver Tiger – El All required SEMARNAT approvals and permits to SEMARNAT construction approvals received 7 Nov

  25. Slide 25: Copper: Growing Demand, Challenged Supply: Price Support into the Future

    Copper; Growing Demand, Challenged Supply TSX-V: OCO · OTCQB: ORRCF · BF: OR6 Copper: Growing Demand, Challenged Supply: Price Support into the Future orocoresourcecorp.com

  26. Slide 26: Corporate Presentation October 2026

    Corporate Presentation October 2026