Mamba Exploration Ltd. · ASX:M24

Mamba Exploration — Investor Presentation (August 2021)

18 slides from Mamba Exploration's investor presentation, Aug 2, 2021

  1. Slide 1: Investor Presentation

    A Western Australian Focused Gold, Nickel and Copper Explorer Investor Presentation August 2021 ASX:M24

  2. Slide 2: Why M24?

    Why M24? Four 100% owned Western Australian Exploration Projects • Darling Range Project (PGE, Ni & Cu) – 6km long Ultramafic identified, 10 AEM conductors modelled, 6km long PGE anomaly on freehold farmland, only 30km from Julimar – ground EM planned for Q3 & drilling Q4 • Calyerup Creek Project (A

  3. Slide 3: Capital & Corporate Structure

    Capital & Corporate Structure Board and Key Management • Managing Director & CEO – Mike Dunbar Ownership Structure • Non – Exec Chairman – Justin Boylson • Non Exec Director – Simon Andrew 7.0% • Company Sec – Alan Armstrong 5.4% • Senior Geologist – Garry Dick 5.3% Capital Structure 47% 18% Board a

  4. Slide 4: Projects Details

    Projects Details

  5. Slide 5: Darling Range

    Darling Range Nickel + Copper + PGE Exploration Project near the Julimar discovery Four Exploration Licenses (three granted & one application) Coincident 6km long 2PGE anomaly, 6km long Ultramafic trend and 7 AEM conductors identified at Black Hills Historical rock chip sampling up to 1,720ppm Ni an

  6. Slide 6: Darling Range – Black Hills

    Darling Range – Black Hills Black Hills Target compared to Julimar – A similar sized intrusive signature ASX:M24

  7. Slide 7: Darling Range – Black Hills Target

    Darling Range – Black Hills Target All the right ingredients, significantly de-risking the target 6km long 2PGE anomaly 6km long Ultramafic trend mapped 7 Modelled AEM plates ASX:M24

  8. Slide 8: Calyerup Creek

    Calyerup Creek Gold Early stage Exploration Project in the Albany Frazer tectonic zone. High Grade Metamorphic setting similar to Tropicanna and Glenburgh Granted Exploration Licenses, covers high grade metamorphic craton margin setting Excellent local infrastructure 4km long gold in soil anomaly –

  9. Slide 9: Calyerup Creek Gold Project

    Calyerup Creek Gold Project Northern Prospect Central Prospect Southern Prospect ASX:M24

  10. Slide 10: Calyerup Creek Southern Geochemical Trends

    Calyerup Creek Southern Geochemical Trends ASX:M24

  11. Slide 11: Calyerup Creek Project – Southern Prospect

    Calyerup Creek Project – Southern Prospect + 2.8 km long soil anomaly up to 1.9g/t Au Southern Prospect – Minor historical workings Multiple historical shallow drill results including: 25m • 9m @ 4.71 g/t gold from 1m including 3m @ 12.71g/t gold • 5m @ 4.77 g/t gold from 15m • 9m @ 2.63 g/t gold fr

  12. Slide 12: Ashburton

    Ashburton Gold Early Stage Exploration Project – Similar Geological Setting as the +1Moz Glenburgh Gold Project Located on major structural feature Four Exploration Licenses (two granted exploration licenses and two applications) Limited exploration to date Rock Chip Sampling up to 21.5 g/t Au Trenc

  13. Slide 13: Ashburton Gold Project

    Ashburton Gold Project ASX:M24

  14. Slide 14: Kimberley Project

    Kimberley Project Speewah East Copper Flats Ruby Plains ASX:M24

  15. Slide 15: Copper Flats

    Copper Flats Copper + Silver Speewah East Early Stage Exploration with excellent first pass results Sedex Copper & Silver Targets Very large tenement position Significant Trench and Surface Geochemical Copper Flats Results Limited Drilling completed to date Ruby Plains ASX:M24

  16. Slide 16: Copper Flats Historical Results

    Copper Flats Historical Results • Prospective Headleys Limestone traceable by radiometric signature for +100km • Growth faults (structural targets) clearly traceable with reprocessed magnetics Area 5: UNDRILLED • Areas 4 & 5 remain undrilled despite up to 8.0% Cu and 7.8% Cu in • Area 5: UNDRILLED C

  17. Slide 17: Planned Exploration

    Planned Exploration News Flow Darling Range Project Drilling • Land Access Agreements - Current Quarter Land Access Great Kimberley • Ground EM surveys - Current Quarter* Southern • Drilling of EM targets - December Quarter Soil Sampling Drilling Drilling Great Southern Project Great Darling IPO Ash

  18. Slide 18: Disclaimer, Competent Person Statement and Forward Looking statement

    Disclaimer, Competent Person Statement and Forward Looking statement This presentation contains only an overview of Mamba Exploration Limited (“Mamba" or the “Company”) and its activities and operations. The contents of this presentation, including matters relating to the geology and exploration pot

Mamba Exploration — Investor Presentation (August 2021) on 6ix