Black Iron Inc. · TSX:BKI
Black Iron — Investor Presentation (June 2013)
24 slides from Black Iron's investor presentation, June 2013

Slide 1: A Compelling Iron Ore Investment Opportunity
A Compelling Iron Ore Investment Opportunity Corporate Presentation June 2013 TSX: BKI

Slide 2: Disclaimer
Disclaimer Forward Looking Statement TSX: BKI This Presentation contains ‘‘forward-looking information’’ within the meaning of applicable Canadian securities legislation. Forward-looking information is based on what management believes to be reasonable assumptions, opinions and estimates of the date

Slide 3: What Sets Black Iron Apart?
What Sets Black Iron Apart? Access to Skilled Labour & Infrastructure – Two of the Most Challenging Iron Ore Project Development Risks TSX: BKI Key Development Risks Taxes/Royalties Human Resources Canada Ukraine Access to Infrastructure Community Opposition Licensing/Permitting Access to Water Afri

Slide 4: Black Iron has ALL the Key Fundamentals for a Successful Low Cost Project
Black Iron has ALL the Key Fundamentals for a Successful Low Cost Project in Place TSX: BKI 100% ownership of Shymanivske & Zelenivske iron ore projects in Ukraine Exceptional Sizable Infrastructure Resource Significant advantages of Large NI 43-101 Compliant infrastructure (power, Resource* rail

Slide 5: Forbes & Manhattan Involvement
Project Backed by Forbes & Manhattan Success with Consolidated Thompson’s Bloom Lake Iron Mine TSX: BKI • World class 8Mtpa iron ore concentrate Forbes & Manhattan Involvement mine in Quebec • Advanced from exploration stage through development to construction Recently acquired − 8 mtpa capacity (66

Slide 6: A Track Record of Iron Ore Success
A Track Record of Iron Ore Success with Consolidated Thompson Iron Mines, Rio Tinto’s Iron Ore Company of Canada, and Ferrexpo TSX: BKI Key Management Board of Directors Matt Simpson – President & CEO Bruce Humphrey – Chairman • Former General Manager, Mining for Rio Tinto’s Iron • Former Chairman o

Slide 7: Sound Capital Structure
Sound Capital Structure Attractive Valuation with substantial upside TSX: BKI Capital Structure Historical Share Price $0.60 Shares Outstanding 141.3 million $0.50 (1) Stock Options 9.8 million $0.40 Fully Diluted Shares 151.1 million $0.30 Market Cap(2) ~US$28.6 million $0.20 $0.10 Current Cash Bal

Slide 8: Deposits In Mining Friendly Region
Deposits In Mining Friendly Region Adjacent to existing Iron Ore Producers TSX: BKI ArcelorMittal’s Kryviy Rih Iron Ore Complex • Two mining and exploration permits Black Iron’s covering 5.92 km2 Shymanivske Project − Mining permit at Shymanivske, which M&I: 646Mt @ 31.6% has been extensively explor

Slide 9: Large Ore Deposit with Growth Potential
Large Ore Deposit with Growth Potential TSX: BKI • Banded iron formation consisting primarily of magnetite with some hematite − Iron band thickness ranges from 40-80 m − Only 9.7-21.2 m of overburden − Very clean ore body low in phosphorus, manganese and aluminum • The resource is defined by ~37,000

Slide 10: Potential Resource Extension at Shymanivske
Potential Resource Extension at Shymanivske Ground Gravity Shows Iron Ore Mineralization at North End TSX: BKI Potential resource • Ground gravity and magnetic surveys upside to be drilled show potential extension of iron ore mineralization at North end of property as circled in red Property • This

Slide 11: Extensive Pit Shell Design and 3D Model Completed
Extensive Pit Shell Design and 3D Model Completed TSX: BKI Property Overview Concentrator Layout 11

Slide 12: Conventional Flowsheet (simplified)
Conventional Flowsheet (simplified) Producing High Quality Iron Ore Products TSX: BKI Drill Blast Load & Haul Crush Vertical Mill Ball Mill (x2) HPGR Magnetic Separator Sulphur Floatation Concentrate Pellet Plant (optional) Fe 68.0% Pellets SiO2 4.5% Fe 65.0% P 0.02% SiO2 4.13% S 0.05% P 0.025% Al2O

Slide 13: Excellent Infrastructure
Excellent Infrastructure Key to a Successful Iron Ore Project TSX: BKI • Paved roads to site, located 35km away from the major city of Kryviy Rih which has a skilled work force • Surplus electricity readily accessible from high voltage power lines that run beside property • ~2 km from main state-own

Slide 14: Strategic Global Location
Strategic Global Location Close Proximity to Target Markets with Abundant Port and Rail Access TSX: BKI • Project is surrounded by steel mills in Europe, Turkey and the Middle East • River barge & rail access to Western Europe. • Five dry bulk tonnage ports accessible using railway running beside pr

Slide 15: Ukraine: A Mining Friendly Country
Ukraine: A Mining Friendly Country Strong Local and National Support TSX: BKI • Politically stable Democratic republic ― Parliament reelected in October 2012 for a further five year term ― S&P Sovereign Risk rating of B • Economy dominated by agriculture & commodities ― Steel production is Ukraine’s

Slide 16: Globally Significant Iron Ore District
Globally Significant Iron Ore District 4th largest iron ore producer & 2nd largest reserve base TSX: BKI • Black Iron’s projects are located in the heart of Global Distribution of Fe Reserves & Ukraine’s iron ore belt Fe Production – 35km from city of 750,000 people • Iron ore district trends 300 km

Slide 17: Permit Process for Shymanivske Deposit
Permit Process for Shymanivske Deposit Black Iron Remains on Track TSX: BKI Exploration Extraction Mining Land Construction Operations Permit Permit Allotment Allotment Approval Approval Explore Deem deposit Pit shell reserves Obtain surface Start mine Operate mine & resource economical & environmen

Slide 18: BFS Highlights – High Grade Concentrate
BFS Highlights – High Grade Concentrate High Value, Low Net Cost Iron Ore Development Project TSX: BKI BFS Annual Production: 9.2 Mt Iron Content: 68.0% Estimated Capital Investment: US$1,094 million Estimated Operating Expenses: (average FOB) US$43.97/t (average at Mine Gate) US$29.67/t Net Present

Slide 19: BFS Long Term Concentrate Price & Comparable Cash Margins
BFS Long Term Concentrate Price & Comparable Cash Margins TSX: BKI BFS Long Term Concentrate Price Cash Margins: BKI vs. Pilbara $120 $80 $70 $100 +$30 -$10 $60 -$23 $80 +$30 $50 $46 $60 $115 $40 -$2 12% $95 $30 $40 $41 $20 $20 $10 $0 $0 Analyst Shipping Aggregate BKI LT Pilbara Shipping Concentrate

Slide 20: Black Iron's Capital Cost Advantage
Vale (Shimandou 1) African Minerals (phase2) Xstrata (Askaf) ** See Disclaimer on page 2 ** African Minerals (DSO) 84 87 90 92 ArcelorMittal (Western… Fortescue (Expansion) Black Iron 109 109 119 Rio Tinto (IOC) 122 Sundance Source: Company data; Renaissance Capital estimates Kumba Ferrexpo (Yeristo

Slide 21: Favourable Tax and Royalties in Ukraine
Favourable Tax and Royalties in Ukraine Black Iron to Other Iron Ore Developers TSX: BKI Pre-Tax & Royalty NPV8 Tax Regime Post-Tax & Royalty NPV8 30% (US$ billions) (US$ billions) +30%1 7.3 39%2 4.9 2.9 3.2 3.3 3.4 3.5 1.8 1.8 1.9 1.5 29% 1.0 0.3 0.5 1.1 0.1 0.3 0.6 Macarthur Macarthur Northland Bl

Slide 22: Black Iron Continues to Deliver
Black Iron Continues to Deliver Shymanivske Project Development Timeline TSX: BKI 2011 2012 2013 Future H1 H2 H1 H2 H1 H2 Drill metallurgical holes Scoping Study/PEA Definition Drilling Bankable Feasibility Study Land Acquisition Environmental Studies Offtake Permitting Detailed Engineering Construc

Slide 23: Black Iron Value Proposition
Black Iron Value Proposition TSX: BKI Experienced management team with history of creating value for Skilled shareholders of Consolidated Thompson, RioTinto and Ferrexpo. Leadership Board of Directors with significant Ukrainian political and business operation experience. Exceptional Excellent acces

Slide 24: Contact Information
CONTACT INFORMATION 65 Queen Street West Suite 805, P.O. Box 71 Toronto, Ontario, Canada M5H 2M5 www.blackiron.com Investor Relations Toronto: +1 (416) 309-2950 - Michael McAllister, IR Manager London: +44 (0) 207 466 5000 Ukraine: +380 (67) 619-0454 info@blackiron.com Follow us: TSX: BKI
Source: Internet Archive copy of blackiron.com
More decks from Black Iron Inc.
Investor Presentation (May 2026)14 slides · May 2026
Investor Presentation (November 2025)14 slides · November 2025
Investor Presentation (January 2025)15 slides · January 2025
Investor Presentation (January 2023)18 slides · January 2023
Investor Presentation (September 2021)17 slides · September 2021
Investor Presentation (June 2021)17 slides · June 2021