Southern Palladium Ltd. · ASX:SPD

Southern Palladium — Shareholder Meeting (November 2024)

10 slides from Southern Palladium's shareholder meeting presentation, Nov 28, 2024

  1. Slide 1: Managing Director's Presentation to Annual General Meeting

    28 November 2024 Managing Director’s Presentation to Annual General Meeting Southern Palladium Limited (ASX Code: SPD and JSE Code: SDL) releases the Managing Director’s presentation to the Company’s Annual General Meeting which is to be held today. Authorised by the Company Secretary. For further i

  2. Slide 2: ASX: SPD JSE: SDL

    ASX: SPD JSE: SDL PAGE

  3. Slide 3: Prime Platinum Group Metal (PGM) Asset

    PRIME PLATINUM GROUP METAL (PGM) ASSET: IDEALLY LOCATED AMONG WELL-ESTABLISHED MINING OPERATIONS. EASTERN LIMB + Ni+Cu+Cr2O3 / Bengwenyama Project / 300 km Pretoria Johannesburg PAGE 2

  4. Slide 4: Achievements and Future Work

    ACHIEVEMENTS AND FUTURE WORK REACHED OUR MILESTONE 2022 2023 2024 2025/2026 Jun 2022 Aug 2022 Sept 2023 Feb 2024 Jul 2024 October 2024 October 2024 $19m raised Submit MRE Drilling Updated Submit Complete Feasibility; FID in IPO Mining Right Update commenced scoping study EIA report PFS2 construction

  5. Slide 5: Financial Year-End Key Figures June 2024

    FINANCIAL YEAR-END KEY FIGURES 30 JUNE 2024 A$ EV/oz Total Drilling Resource Use of funds Cash Mrkt Cap Meters 40.25 Moz 1 incl. Drilling, Position A$64m4 Completed Studies and Corporate and and other related Enterprise 82 drillholes costs since Value Maiden JORC listing were completed Ore Reserve 3

  6. Slide 6: Bengwenyama Project PFS Study Results

    BENGWENYAMA PROJECT PFS STUDY RESULTS HIGHLIGHTS 2.4 Mtpa UG2 reef at steady Peak funding requirement NPV8% (post-tax) state US$450 million (incl. ~15% US$1.060billion² contingency) Annual steady state IRR (post-tax) production EBITDA (LoM average) 28% 400Koz p.a. 6E US$300 million p.a. 150Koz p.a.

  7. Slide 7: PFS Study Results: Commodity Leverage Over Life-of-Mine

    BENGWENYAMA PROJECT PFS STUDY RESULTS COMMODITY LEVERAGE OVER LIFE-OF-MINE (LOM) Contribution to Revenue Pt | Platinum Pd | Palladium 2.86Moz 2.85Moz Other 6% Chromite Platinum 12% 26% Iridium 40 m Waterberg Deposit 4% Rh | Rhodium 13 story stopes Ru | Ruthenium US$11.2bn 590Koz 960Koz Rhodium 28% P

  8. Slide 8: Corporate and Social Responsibility

    A single BENGWENYAMA PROJECT Community CORPORATE AND SOCIAL RESPONSIBILITY the Bengwenyama our partner in REGULATORY REQUIREMENTS the project Social and Labour Plan aligned with regulatory requirements for community development Environmental impact Assessment awaiting approval from DMRE Mining Right

  9. Slide 9: Why Our Project?

    BENGWENYAMA PROJECT WHY OUR PROJECT? Total Resource (MI&I) 40.25Moz (7E) Total Reserve (Probable) 6.29Moz (6E) CRITICAL MINERALS SHALLOW Medium term (2025-2035) critical Matrix4 Foundation upon which modern Last remaining significant technology is built: shallow real estate on the USA1: Cr, Ni, Pd,

  10. Slide 10: Contact Us

    CONTACT US Johannesburg, South Africa Coldstream Office Park, Suite 6 2 Coldstream Street Little Falls Roodepoort Johannesburg Sydney, Australia Level 1, 283 George Street, Sydney, NSW 2000 Email: info@southernpalladium.com The information in this presentation relating of Resources and Reserves is e