  1. Slide 1: Way Linggo Project Update

    For personal use only Way Linggo Project Update February 2014

  2. Slide 2: Disclaimer & Competent Persons Statement

    Disclaimer & Competent Persons Statement The information contained in this document (“Presentation”) has been prepared by Kingsrose Mining Limited (“Kingsrose” or the “Company”). This Presentation does not constitute an offer or invitation to any person to subscribe for or apply for any securities i

  3. Slide 3: Kingsrose Mining Limited – A Snapshot

    Kingsrose Mining Limited – A Snapshot For personal use only Corporate Snapshot (ASX:KRM)1 Board of Directors Shares on issue 335 million John Morris Chairman Share Price ~40c Scott Huffadine Managing Director Market Cap ~$134 million Tim Spencer Executive Director Av. Daily Volume ~150,000 Bill Phil

  4. Slide 4: The Way Linggo Project – Key Value Drivers

    The Way Linggo Project – Key Value Drivers For personal use only Resources Rich Location “Rim of Fire” in Sumatra, Indonesia - low sulphidation epithermal system Established Project (85% owned) 2 mines & 1 processing plant on 100km2 of secure title (4th generation CoW) Outstanding Grades Specialist

  5. Slide 5: Current Project Status

    Current Project Status For personal use only • Final regulatory steps required: forestry permit ‘pinjam pakai’ and extension to existing Project environmental assessment (AMDAL) both covering Talang Santo and associated infrastructure • KRM & PTNM have now met all obligations in relation to the subm

  6. Slide 6: The Way Linggo Project – The Next Chapter

    The Way Linggo Project – The Next Chapter For personal use only • Talang Santo Mine - three levels developed via adit and shaft • Larger footprint than the Way Linggo orebody - mineralised structures proven in multiple orientations and remains open • Process plant current capacity 140,000tpa but exp

  7. Slide 7: The Talang Santo Mine

    The Talang Santo Mine For personal use only • Significantly larger mineralised system than seen at the Way Linggo ore body – remains open • Major cluster of epithermal veining still to be evaluated • Located 17km by haul road from the Way Linggo processing plant • Phase 1 of current mine plan – 6 Le

  8. Slide 8: Talang Santo – High Grades and High Potential for Growth

    Talang Santo – High Grades and High Potential for Growth For personal use only • Recent cross cuts and on vein driving have exposed the Mawi & Hanging Wall veins – exposing numerous high grade traverses • Grades across the mineralised zone exceeded mine modelling. • Niche sampling of clay alteration

  9. Slide 9: Talang Santo – The Mineralised Zone

    Talang Santo – The Mineralised Zone For personal use only 9

  10. Slide 10: Talang Santo – The Splay Vein

    Talang Santo – The Splay Vein For personal use only • The Splay vein was previously interpreted from limited surface drill intercepts in the initial Talang Santo geological model • Highlights the potential for mineralised structures in various orientations within the Talang Cluster • Drilling from 3

  11. Slide 11: The Splay Vein – New Mineralised Orientation

    The Splay Vein – New Mineralised Orientation For personal use only 11

  12. Slide 12: Contract of Work - Exploration Footprint Expanding

    Contract of Work - Exploration Footprint Expanding For personal use only • Numerous defined epithermal zones/targets within the 100km2 Project area • In particular, multiple structures out cropping at surface within a 2km radius of the Talang Santo mine – “Talang Cluster” • Exploration shaft at Tala

  13. Slide 13: Talang Cluster - A Larger System?

    Talang Cluster- A Larger System ? For personal use only Mine adit Mine winze and X-cut Mine shaft NSA Talang Santo 13

  14. Slide 14: Past, Present & Future Performance

    Past, Present & Future Performance For personal use only Past (June 2010 – July 12) Ø Project EBITDA: USD $83m Ø Gold Produced: 64,706oz Ø Mined gold grade: 13.1g/t Ø EBITDA/Oz: USD$1,282 Ø Costs: C1 USD $207/oz1 C3 USD $491/oz2 Present (FY 2013) Ø Break even Future (FY 2014 and beyond) Ø Pro

  15. Slide 15: Community Initiatives – Co-operation & Engagement

    Community Initiatives – Co-operation & Engagement For personal use only Health Initiatives • Substantial food & equipment donations • Subsidised medical care, including malaria control & prevention & birth control Education Initiatives • Student scholarships & teacher allowances • School building re

  16. Slide 16: Health, Safety & the Environment

    Health, Safety & the Environment Health & Safety Initiatives For personal use only • Comprehensive health & safety training regularly provided to all employees, contractors and visitors to site • Recipient of “Gold Flag” certificate in recognition for the creation of a safe and responsible work envi

  17. Slide 17: Contact Details

    Contact Details: For personal use only Scott Huffadine – Managing Director +61 8 9486 1149 info@kingsrosemining.com.au www.kingsrosemining.com.au ASX:KRM ACN 112 389 910 17