Catalyst Metals Limited · ASX:CYL

Catalyst Metals — Shareholder Meeting (November 2014)

24 slides from Catalyst Metals's shareholder meeting presentation, Nov 12, 2014

  1. Slide 1: Annual General Meeting Presentation

    Annual General Meeting Presentation Perth WA 12 November 2014 Bruce Kay Technical Director

  2. Slide 2: Company Objectives

    Company Objectives  Become a low cost gold producer  Considerably enhance value via successful exploration  Acquire assets with strong upside potential  Become a regional player in a world class gold province Early cash flow is the priority Slide 2

  3. Slide 3: Catalyst: 2014 Summary

    Catalyst: 2014 Summary  More high grade gold mineralisation intersected on Discovery Zone at Four Eagles Gold Project  Heads of agreement signed with Navarre Minerals on 12 June 2014  New tenements acquired in North Bendigo Gold Belt  Catalyst now manages exploration over 75 kms of North Bendigo

  4. Slide 4: Well Positioned for Major Discovery

    Well Positioned for Major Discovery  Catalyst controls entire North Bendigo Goldfield along Whitelaw fault  Shallow high grade gold mineralisation at Four Eagles and Tandarra  Virgin gold discoveries beneath shallow cover  Gold plants available in district for early cash flow  Freehold land wit

  5. Slide 5: Bendigo: a world-class gold target

    Bendigo: a world-class gold target New Chum Line Bendigo Goldfield Nell 7.9mt @15.1g/t Au (3,850,000oz) Historical Gold Production Gwynne Line Garden Gully Line from Lines of Lodes 10.8mt @15.0g/t Au (5,203,000oz) e 18 million ounces of ction Zon BENDIGO  Hustlers Line 1.6mt @17.6g/t Au reef gold o

  6. Slide 6: Control of entire North Bendigo Gold Belt

    Control of entire North Bendigo Gold Belt  Bendigo produced 22 million ounces of gold at 15g/t Au  Gold belt continues north of Bendigo  Totally concealed by younger sediments  Whitelaw Fault controls gold If there is a gold deposit north of Bendigo, Catalyst will benefit! Slide 6

  7. Slide 7: What lies beneath the wheat fields?

    What lies beneath the wheat fields? 10.0m @ 17.9g/t Au (ACT015) 6.0m @ 82.7g/t Au (FE328) 1.5m @ 59.2g/t Au (ACT151) 3.0m @ 36.6g/t Au (FE415) 3.0m @ 59.2g/t Au (FE633) 3.0m @ 20.5g/t Au (FE592) 3.0m @ 9.1g/t Au (FE608) Slide 7

  8. Slide 8: Four Eagles Gold Zones

    Four Eagles Gold Zones 316 (3.85km north) Drillhole Intersections (>0.8g/t Au) FEDD001 3.7m @ 4.7g/t Au from 170m 619 inc. 0.8m @ 17.5g/t Au from 173m Projecte FEDD007 0.4m @ 8.4g/t Au from 168m and 0.75m @ 15.3g/t Au from 170m EAGLE 3 FEDD008 0.4m @ 152g/t Au from 150m d FERC002 2m @ 1.8g/t Au from

  9. Slide 9: Discovery Prospect

    Discovery Prospect y catalyst METALS L lJ ‘Al — 243,000mE , > é at nn =] mi . . Drillhole Intersections (>0.5g/t Au) Haya : FEDD001 3.7m @ 4.7g/t Au from 170m inc 0.8m @ 17.5g/t Au from 173m . R826 | Ae ld FEDD007 0.4m @ 8.4g/t Au from 168m 5 and 0.75m @ 15.3g/t Au from 170m FEDD008 0.4m @ 152g/t Au

  10. Slide 10: Hayanmi Trend

    Hayanmi Trend 244,000mE 245,000mE Hayanmi Trend Yarrawalla East Road Significant Drillhole Intersections (>0.5g/t Au) 5,992,000mN 469 623 FE399 3.0m @ 1.42g/t Au from 66m FE469 3.0m @ 1.23g/t Au from 36m Eagle 3 Cuneens Road FE471 3.0m @ 5.96g/t Au from 75m Zone and 3.0m @ 1.33g/t Au from 81m FE492

  11. Slide 11: Boyd's Dam Prospect

    Boyd's Dam Prospect 245,000mE 245,500mE Drillhole Intersections (>0.5g/t Au) EAGLE 4 ZONE FEDD003 3m @ 0.92g/t Au from 56m 5,990,000mN FERC002 2m @ 1.8g/t Au from 67m and 1m @ 18.3g/t Au from 127m 580 FERC003 2m @ 6.2g/t Au from 49m FE415 6.0m @ 2.6g/t Au from 45m and 3.0m @ 36.6g/t Au from 57m 576

  12. Slide 12: Four Eagles 2015 Drilling Programme

    Four Eagles 2015 Drilling Programme  Angled aircore on Hayanmi North  Angled RC Drilling at Hayanmi and Boyd’s Dam  Angled Diamond Drilling at Hayanmi and Boyd’s Dam Slide 12

  13. Slide 13: Navarre Heads of Agreement

    Navarre Heads of Agreement  Earn 51% in Tandarra Project for $3 million over 4 years: Potential 100% ownership  Minimum $800,000 in 2 years and completion of Mineralisation Report  Catalyst gives Navarre 250,000 shares and $50,000 on HOA completion and 250,000 shares after 12 months  Granted JV

  14. Slide 14: Tandarra Summary

    Tandarra Summary  Large areas of gold potential in shallow basement (< 60 metres)  High grade gold at less than 20 metres depth  10 to 20 km strike length of untested structure  Open pit potential at Tomorrow Prospect  Angled RC and/or Diamond Drilling required Slide 14

  15. Slide 15: Tandarra Gold Zones

    Tandarra Gold Zones catalyst yee ae ent aol i o e ° e >50gtAU HB Gadd Zone TB Arsenic Zone Depth to Basement Hl <4om 1 40m- 60m ] >60m $18.000rW 251,000 Lg () nortH 5276,000nN ia WANA AIRGORE & RG DRILL PLAN Macnaughtans 4 Prospect | 5974.000nN— ooo Bo mo oe oe Tomorrow Prospect\ | ee \ 2 ane (eo0 c

  16. Slide 16: Tomorrow Zone Aircore

    Tomorrow Zone Aircore Slide 16

  17. Slide 17: Tomorrow Zone RC Drilling

    Tomorrow Zone RC Drilling Slide 17

  18. Slide 18: Tandarra Cross Section

    Tandarra Cross Section Slide 18

  19. Slide 19: Tandarra Cross Section

    Tandarra Cross Section Slide 19

  20. Slide 20: Tandarra 2015 Drilling Programme

    Tandarra 2015 Drilling Programme  Reconnaissance aircore on three structures  Tandarra, Prairie and Dingee Zones  Angled Diamond Drilling/RC at Tomorrow Prospect  Long untested zones on Tandarra and Whitelaw Faults Slide 20

  21. Slide 21: Catalyst Capital Structure

    Catalyst Capital Structure Capital Structure (ASX: CYL)  50,551,700 fully paid ordinary shares – 750,000 unlisted 30 cent options expiring 30/06/2015 – 166,667 unlisted 30 cent options expiring 30/06/2016 – 350,000 unlisted Performance Rights  Top 20 control approximately 70% of issued capital Cas

  22. Slide 22: Competent Persons Statement

    Competent Persons Statement Competent Person’s Statement The information in this report that relates to exploration results is based on information compiled by Mr Bruce Kay, a Competent Person, who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Kay is a non-executive director

  23. Slide 23: Disclaimer and Forward Looking Statements

    Disclaimer and Forward Looking Statements  This presentation has been prepared by Catalyst Metals Limited (“Catalyst”). This document contains background information about Catalyst current at the date of this presentation. The presentation is in summary form and does not purport to be all inclusive

  24. Slide 24: Annual General Meeting Presentation

    Annual General Meeting Presentation Perth WA 12 November 2014 Bruce Kay Technical Director

Catalyst Metals — Shareholder Meeting (November 2014) on 6ix